KitLog pro

Powered By Kitlog Pro v2.0

HAKAN'S WEB SITE
Work Logs Found: 36
Category Work Time: 144 Hours
 Date
Hours
Work Log Summary

Details

 04-05-2013
3.00
Static leak test and wing tip lights
Details
       

 03-30-2013
1.00
Connected the tail lights
Details
     

 10-09-2012
6.00
Sticks and stick grips
Details
       

 07-15-2012
0.50
Alternator wire
Details
       

 07-13-2012
0.50
Engine ground strap
Details
       

 07-06-2012
2.00
Fuel and oil pressure
Details
       

 06-07-2012
3.00
hour meter
Details
     

 05-24-2012
4.00
Headset plugs
Details
       

 05-21-2012
2.00
Stby alternator install
Details
     

 05-17-2012
3.00
First electrical power up
Details
       

 05-16-2012
3.00
Standby alternator and music wires
Details
       

 05-16-2012
1.00
RPM for Dynon
Details
       

 05-16-2012
3.00
Mic and push to talk
Details
     

 05-03-2012
10.00
Switch wiring
Details
     

 05-01-2012
9.00
Daisy-chain wiring for switches
Details
       

 05-01-2012
3.00
Canon plug for electrical turn and bank
Details
     

 04-30-2012
4.00
Buzzing the electrical system
Details
       

 04-26-2012
2.00
ELT installation complete
Details
     

 04-21-2012
4.00
Auto pilot and Adahrs attachement to network hub
Details
     

 04-19-2012
15.00
Wiring
Details
       

 04-15-2012
4.00
Started connecting the wires and pitot wires and t
Details
       

 04-11-2012
9.00
More VPX wiring
Details
       

 04-06-2012
1.00
Pitch autopilot servo electrical connection
Details
     

 04-06-2012
5.00
Finished the electrical connections to the wings
Details
       

 04-04-2012
4.00
Installing autopilot pitch servo
Details
       

 04-03-2012
1.50
Waterproof connectors
Details
       

 04-02-2012
6.00
Adding more wires to the aft fuselage
Details
       

 04-01-2012
6.00
More wiring
Details
       

 04-01-2012
6.00
More wiring
Details
       

 04-01-2012
8.00
More electrical wiring
Details
       

 04-01-2012
2.00
Markups of the wiring diagram
Details
       

 03-29-2012
2.00
Tip lights
Details
       

 03-27-2012
1.00
Finished the Strobe wire rear fuselage routing
Details
     

 03-26-2012
4.00
Routed strobe wires through fuselage
Details
       

 03-25-2012
1.00
Installed strobe harness
Details
       

 03-24-2012
4.00
Soldered nav light
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.