 11-05-2020
0.00
Baffles, controls, headliner support.
Details

 11-04-2020
0.00
Re-assembly after oil leak remediation.
Details

 10-27-2020
0.00
Attached carburetor assembly, worked on baffles.
Details
       

 10-24-2020
0.00
Installed oil-related parts and headliner supports
Details
       

 10-20-2020
0.00
Finished prepping engine bottom for saelant.
Details
       

 10-19-2020
0.00
Oil leak work, other.
Details
       

 10-18-2020
0.00
Break-in flight, oil leak
Details
       

 10-12-2020
0.00
Oil leaks
Details

 10-03-2020
0.00
Good oil pressure!
Details
       

 10-01-2020
0.00
Oil pressure relief valve.
Details
       

 09-28-2020
0.00
Low oil pressure, cont.
Details
     

 08-14-2020
0.00
Balanced prop.
Details
       

 07-27-2020
0.00
Second run, prop and oil pressure.
Details

 07-25-2020
0.00
First engine run.
Details

 07-23-2020
0.00
Ailerons and engine.
Details

 06-11-2020
0.00
Engine mount bolts in and out.
Details
       

 05-21-2020
0.00
Generator, primer, nav lights.
Details
       

 04-14-2020
0.00
Sam - Baffles, mags, battery.
Details

 04-10-2020
0.00
Sam continued at FBO.
Details
       

 04-07-2020
0.00
Moved props to T hangar.
Details
     

 03-31-2020
0.00
Starter bearing measurements
Details

 06-18-2019
0.00
Wayne Sheets borrowed baffles.
Details
       

 03-05-2018
0.00
Finished engine, cleaned parts.
Details
       

 03-01-2018
0.00
Painted motor mount, reorganized.
Details
       

 02-28-2018
0.00
Installed intake pipes. Painted valve covers.
Details
       

 02-27-2018
0.00
Finished installijg cylinders and associated parts
Details
       

 02-26-2018
0.00
Feb catchup, installed cylinders.
Details
       

 01-29-2018
0.00
Received pistons, rejected one.
Details
       

 01-26-2018
0.00
Dry fit carb and air intake.
Details
       

 01-19-2018
0.00
Discovered wrong pistons, ordered.
Details
       

 01-11-2018
0.00
Prepped cylinders, pistons, rings for cylinder ins
Details
     

 01-08-2018
0.00
Installed pushrod tubes.
Details
     

 01-05-2018
0.00
Found and worked on pistons.
Details
     

 12-28-2017
0.00
Generator and honing.
Details
       

 12-21-2017
0.00
Lapped and reinstalled valves.
Details
     

 12-15-2017
0.00
Worked on Sherwood cylinders.
Details
     

 12-08-2017
0.00
Checked cylinders.
Details
     

 04-08-2017
0.00
Picked up remaining two cylinders from Ken.

 04-06-2017
0.00
Began inspecting Sherwood cylinders.
Details
       

 05-21-2016
0.00
Clinder work, incl AD.
Details
     

 04-13-2016
0.00
Carb box, 337's.
Details

 04-08-2016
0.00
Catch-up W/E 4/8.
Details
       

 04-02-2016
0.00
Frustrating day.
Details

 03-31-2016
0.00
Air box, carbs, misc.
Details

 03-30-2016
0.00
Prepared to work on cylinders.
Details
       

 03-22-2016
0.00
Installed carb SB.
Details
       

 04-01-2015
0.00
Serviced magnetos.
Details
       

 05-21-2013
0.00
Unwrapped/inspected prop.
       

 05-17-2013
0.00
Prop arrived.
     

 04-11-2013
1.00
Mag grease, generator.
Details

 03-06-2013
2.00
Generator and magneto work.
Details
       

 03-04-2013
2.00
Generator and patch work.
Details
       

 03-01-2013
3.00
Air filter, muffler bracket, generator bearing.
Details
       

 02-28-2013
4.00
Torqued down cover, disassembled generator.
Details
       

 02-26-2013
2.00
Installed gears and crankcase cover.
Details
       

 02-14-2013
4.00
Weighed pistons, lapped valves.
Details
       

 02-13-2013
4.00
Cleaned parts.
Details

 02-12-2013
4.00
Cam gear bolts missing.
Details
       

 02-07-2013
1.00
Mounted engine on stand.
Details
       

 02-06-2013
6.00
Mated case halves.
Details
       

 02-04-2013
4.00
Finished checking dimensions.
Details

 02-02-2013
2.00
Checked dimensions cylinders 1& 2.
Details
       

 01-31-2013
7.00
Found bad pinion.
Details
     

 01-30-2013
5.00
Installed internal parts.
Details
       

 01-09-2013
2.00
Ordered consumables.
Details

 01-08-2013
0.00
Odds and ends
Details

 12-31-2012
1.00
Finished blasting last cylinder.
Details

 12-26-2012
6.00
Disassembled/cleaned cylinders.
Details
       

 12-19-2012
7.00
Assembled crank and connecting rods.
Details
     

 12-18-2012
5.00
Ordered hardware.
Details
     

 12-17-2012
3.00
Assembled oil pump.
Details

 12-13-2012
3.00
Cleaned mating surfaces.
Details
     

 12-12-2012
2.00
More preliminary tasks.
Details
       

 12-06-2012
1.00
Started spreadsheet.
Details
     

 12-04-2012
1.00
Organized parts.
Details
     

 04-18-2012
4.00
Completed crankcase disassembly.
Details
       

 04-17-2012
6.00
Continued disassembly.
Details
       

 04-16-2012
4.00
Continued Engine Disassembly
Details
       

 04-13-2012
4.00
Engine Disassembly
Details
       

 03-22-2012
2.00
Set up in shop, began disassembly.
Details
       

 03-21-2012
0.00
Mounted engine to stand.