KitLog pro

Powered By Kitlog Pro v2.0

Louies Web Site
Work Logs Found: 114
Category Work Time: 370 Hours
 Date
Hours
Work Log Summary

Details

 12-09-2012
4.00
Install flaps, ailerons. Torque wing spar bolts
Details

 12-08-2012
2.00
Wing spar bolts, engine compression
Details

 12-07-2012
2.00
Control cables
Details

 12-06-2012
2.00
Control cables
Details

 12-04-2012
2.00
Control cables
Details

 12-03-2012
2.00
Controls cables
Details

 12-02-2012
2.00
Control cables
Details

 11-30-2012
1.20
Wiring, spar bolts
Details

 11-29-2012
2.00
Wiring
Details

 11-28-2012
2.80
Fuel line, wiring
Details

 11-27-2012
2.30
Fuel line, wiring
Details

 11-26-2012
3.30
Fuel line, wiring
Details

 11-19-2012
7.00
Transport & polishing
Details
       

 11-18-2012
3.00
Polishing
Details

 11-17-2012
2.00
Polishing
Details

 11-16-2012
2.20
Polishing
Details

 11-15-2012
3.00
Miscellaneous work
Details
     

 11-14-2012
3.00
Misc work
Details

 11-12-2012
5.00
Prop pitch & other
Details

 11-11-2012
3.00
Fuel flow test
Details
       

 11-08-2012
3.20
Oil filler access door
Details
       

 11-07-2012
2.60
Cowling oil filler access door
Details

 11-01-2012
1.50
Carb heat
Details
       

 10-31-2012
5.00
Carb heat
Details

 10-19-2012
4.00
Misc work
Details

 10-18-2012
2.80
Breather line
Details
       

 10-13-2012
3.00
Fuel line vent
Details
       

 10-05-2012
5.00
Engine start
Details
       

 10-03-2012
4.00
Various small jobs
Details
     

 09-30-2012
4.00
Cowling
Details
       

 09-29-2012
3.00
Lower cowling
Details
       

 09-28-2012
5.00
Lower cowling
Details
       

 09-27-2012
5.00
Lower cowling
Details
       

 09-25-2012
3.00
Lower cowling
Details
       

 09-15-2012
2.50
Weighed airplane
Details

 09-12-2012
3.20
Cooling system
Details

 09-05-2012
4.00
Cooling system and carpet
Details

 09-04-2012
4.60
Cooling system
Details
       

 09-03-2012
3.50
Cooling system
Details
       

 09-02-2012
3.50
Cooling system
Details
       

 09-01-2012
3.00
Cooling system
Details

 08-31-2012
2.40
Cooling system
Details

 08-30-2012
2.70
Cooling plenum top
Details
       

 08-28-2012
1.30
Cooling plenum top
Details

 08-21-2012
2.80
Cooling baffles
Details

 08-20-2012
2.50
Cooling baffle
Details
     

 08-19-2012
3.30
Cooling baffles
Details
       

 08-18-2012
1.50
Cooling baffles
Details

 08-17-2012
2.00
Cooling baffles
Details

 08-16-2012
6.00
Cooling baffles
Details
       

 08-15-2012
4.00
Cooling baffles
Details
       

 08-14-2012
1.00
Cooling baffles
Details

 08-13-2012
2.00
Cooling baffles
Details

 08-11-2012
5.00
Cooling baffles
Details
       

 08-10-2012
3.60
Cooling baffles
Details
     

 08-09-2012
4.10
Cooling baffles
Details

 07-30-2012
2.50
Top cowling & oil cooler lines
Details

 07-22-2012
1.00
Oil cooler air inlet
Details

 07-19-2012
1.20
Oil cooler air inlet
Details

 07-18-2012
1.00
Oil cooler air inlet
Details

 07-15-2012
8.50
Oil cooler install
Details
       

 07-14-2012
12.50
Oil cooler install
Details

 01-12-2012
2.60
J&S Vampire wiring and other
Details

 12-20-2011
3.40
Sensor mounting
Details

 12-19-2011
3.50
Sensor mounting
Details

 10-02-2011
4.00
Jog tool
Details
       

 10-01-2011
4.00
Jog tool
Details

 01-19-2011
1.00
Ignition simulator
Details

 01-18-2011
1.00
Ignition simulator
Details
       

 01-17-2011
5.50
Ignition system simulator
Details

 01-16-2011
3.00
Ignition system simulator
Details

 11-16-2010
6.00
Wing rack
Details

 10-19-2010
4.50
Fit fairings
Details

 10-13-2010
1.50
Wing fairings
Details

 10-05-2010
2.00
Fairings
Details

 10-04-2010
2.50
Fairings
Details

 10-03-2010
1.00
Fairings
Details

 10-02-2010
2.50
Fairings
Details

 10-01-2010
2.50
Fairing
Details

 09-30-2010
4.00
Sanded fairings
Details

 09-29-2010
4.00
Wing fairings
Details

 09-28-2010
4.50
Fairings
Details

 09-27-2010
3.50
Fairings
Details

 09-26-2010
3.50
Fairings
Details

 09-25-2010
3.50
Left top wing fairing
Details

 09-24-2010
3.00
Left side top fairing
Details

 09-23-2010
2.50
Left wing top fairing
Details

 09-22-2010
3.00
Left wing top fairing
Details

 09-21-2010
2.50
Left wing top fairing
Details

 09-20-2010
2.00
Left side top wing fairing
Details

 09-19-2010
4.00
Left wing top fairing
Details

 09-18-2010
2.00
Left wing root top fairing
Details

 09-17-2010
3.50
Leftt wing top fairing
Details

 09-16-2010
2.00
Left wing top fairing
Details

 09-15-2010
3.00
Left wing underside fairing
Details

 09-14-2010
7.00
Left wing underside fairing
Details

 09-13-2010
4.00
Left wing underside fairing
Details

 09-12-2010
3.50
Left wing underside fairing
Details

 09-06-2010
2.00
Left wing, right wing bottom fairing.
Details

 08-19-2010
2.50
Right wing top fairing
Details

 08-18-2010
1.00
Right wing top fairing
Details

 08-17-2010
2.00
Right wing top fairing
Details

 08-15-2010
6.50
Right wing fairing
Details
       

 08-13-2010
4.00
Right wing fairing
Details

 08-11-2010
3.00
Right wing fairing
Details

 08-03-2010
2.50
Right wing top fairing
Details
       

 07-31-2010
2.50
Right wing top fairing
Details

 07-28-2010
4.00
Right wing top fairing
Details
     

 07-27-2010
3.00
Right wing top fairing
Details
     

 07-26-2010
4.00
Wing fairings
Details
     

 07-24-2010
5.00
Layup of right wing underside fairing
Details
       

 07-23-2010
4.00
Finished Rt wing underside fairing form
       

 07-22-2010
4.00
Worked on right wing/fuselage fairing form

 01-15-2010
2.00
Upgrade SAIB CE-10-08
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.