KitLog pro

Powered By Kitlog Pro v2.0

Brendons Kit Log
Work Logs Found: 15
Category Work Time: 56 Hours
 Date
Hours
Work Log Summary

Details

 02-16-2019
8.00
Finish tail install, check controls
       

 02-10-2019
8.00
Install tail section
       

 11-26-2017
4.00
Emp Fairing Work
       

 11-18-2017
6.00
Emp Fairings
       

 11-12-2017
1.00
Start Rebuild of Trim Tabs
     

 11-12-2017
5.00
Empennage Fairings
Details
       

 03-16-2013
4.00
Install and adjust elevator trim cables
Details
     

 03-15-2013
2.00
Prime elevator trim parts
Details
     

 03-13-2013
2.00
Match drill trim brackets
Details
     

 03-12-2013
2.00
VS Attach
Details
       

 03-11-2013
2.00
Install elevator pushrod
Details
       

 03-09-2013
4.00
HS attach
Details
       

 03-08-2013
2.00
Fabricate spacers to HS to tail attach
Details
     

 02-19-2012
3.00
Inventory
Details
       

 02-07-2012
3.00
Empennage Kit Arrives
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.