Date
|
Hours
|
Work Log Summary
|
Details
|
01-05-2018
|
6.00
|
Prepared and installed 180 deg thermostat
|
Details
|
|
|
09-21-2015
|
4.50
|
Install new radiator tubing, Install Vans Dynon uo
|
Details
|
|
|
06-10-2015
|
2.50
|
Complted install of valve cover vent
|
Details
|
|
|
06-02-2015
|
1.50
|
Added Vent to Valve cover
|
Details
|
|
|
12-15-2014
|
1.00
|
Completed installation of Gates idler pulley
|
Details
|
|
|
12-11-2014
|
1.30
|
machined an aluminum spacer for the new idler pull
|
Details
|
|
|
12-10-2014
|
1.00
|
Machined bushing for idler pulley
|
Details
|
|
|
12-09-2014
|
1.00
|
Removed Idler Pulley
|
Details
|
|
|
01-24-2014
|
3.50
|
Set Prop Pitch, Installed Engine block heater
|
Details
|
|
|
12-20-2013
|
2.00
|
Reinstalled bulkhead fairing
|
Details
|
|
|
12-18-2013
|
3.00
|
Trouble shoot fuel line leak
|
Details
|
|
|
12-17-2013
|
4.50
|
Completed heater electrical, Ran Engine
|
Details
|
|
|
12-16-2013
|
3.00
|
Reinstalled heater, filled with coolant
|
Details
|
|
|
12-04-2013
|
2.50
|
Installed new muffler, rerouted coolant overflow
|
Details
|
|
|
11-15-2013
|
2.50
|
Removed muffler for rerturn to viking
|
Details
|
|
|
11-06-2013
|
2.00
|
Instlled Coolant overflow tank, Reworked fuselage
|
Details
|
|
|
10-18-2013
|
5.00
|
Fabricated and installed crankcase breather tube
|
Details
|
|
|
08-07-2013
|
4.50
|
Torqqued manifild,Extended engine intake temp. har
|
Details
|
|
|
08-05-2013
|
7.50
|
Completed throttle cable installation
|
Details
|
|
|
08-03-2013
|
2.00
|
Installed throttle cable.
|
Details
|
|
|
07-23-2013
|
3.00
|
More engine work
|
Details
|
|
|
07-18-2013
|
2.00
|
Installed updated ECU,Installed ADSB box
|
Details
|
|
|
07-15-2013
|
3.50
|
Wiring, intake manifold fitting
|
Details
|
|
|
07-12-2013
|
1.50
|
Installed Alternator out light
|
Details
|
|
|
07-11-2013
|
3.00
|
Rework oil cooler hoses
|
Details
|
|
|
07-10-2013
|
3.50
|
Reinstalled oil cooler, trial fitted new intake ma
|
Details
|
|
|
07-03-2013
|
2.50
|
Rewire engine ground
|
Details
|
|
|
07-02-2013
|
2.50
|
Disassembled engine components for update
|
Details
|
|
|
06-18-2013
|
3.30
|
Update intake manifold and coolant system
|
Details
|
|
|
06-14-2013
|
3.00
|
Installed Idler Pulley, Belt and Alternator
|
Details
|
|
|
05-29-2013
|
2.00
|
Installed Craknshaft pulley and reinstalled ngine
|
Details
|
|
|
05-28-2013
|
2.00
|
Removed engine for Pulley update
|
Details
|
|
|
05-18-2013
|
1.50
|
Turned and installed Idler bushing
|
Details
|
|
|
05-15-2013
|
1.50
|
Preparing for pulley update
|
Details
|
|
|
05-13-2013
|
1.00
|
Reinstalled radiator
|
Details
|
|
|
12-19-2012
|
1.00
|
Added Dipstick to oil filler cap.
|
Details
|
|
|
08-30-2012
|
3.50
|
Worked on Engine wiring
|
Details
|
|
|
08-27-2012
|
4.50
|
Wiring engine and panel
|
Details
|
|
|
08-10-2012
|
4.00
|
Converted all Nylock locknuts to Steel locknuts
|
Details
|
|
|
07-17-2012
|
5.50
|
Completed Oil Cooler Mounting
|
Details
|
|
|
07-16-2012
|
4.00
|
Fabricated new Oill Cooler brackets
|
Details
|
|
|
06-11-2012
|
8.00
|
Repaired interfence on engine mount
|
Details
|
|
|
06-07-2012
|
1.00
|
Wired sensors on engine
|
Details
|
|
|
06-05-2012
|
4.00
|
Installed Fittings and wired Fuel pump Assembly
|
Details
|
|
|
06-04-2012
|
3.20
|
Modified Oil Cooler
|
Details
|
|
|
05-22-2012
|
1.50
|
Pulled ECU harness through Firewall
|
Details
|
|
|
05-21-2012
|
3.00
|
Insatalled Oil Cooler
|
Details
|
|
|
05-14-2012
|
2.50
|
Worked on cable routing and oilcooler install
|
Details
|
|
|
05-12-2012
|
7.00
|
Installed gearbox and radiator
|
Details
|
|
|
04-06-2012
|
2.00
|
Still Working on Fuel system
|
Details
|
|
|
04-03-2012
|
4.50
|
Partially Installed fuel pumps/lines
|
Details
|
|
|
04-02-2012
|
2.00
|
Installing Fuel Pump System
|
Details
|
|
|
03-15-2012
|
8.00
|
Installed Engine
|
Details
|
|
|
03-07-2012
|
2.50
|
Recieved Viking engine today
|
Details
|
|