KitLog pro

Powered By Kitlog Pro v2.0

LLOYD'S WEB SITE
Work Logs Found: 54
Category Work Time: 168 Hours
 Date
Hours
Work Log Summary

Details

 01-05-2018
6.00
Prepared and installed 180 deg thermostat
Details
       

 09-21-2015
4.50
Install new radiator tubing, Install Vans Dynon uo
Details
       

 06-10-2015
2.50
Complted install of valve cover vent
Details
       

 06-02-2015
1.50
Added Vent to Valve cover
Details

 12-15-2014
1.00
Completed installation of Gates idler pulley
Details
       

 12-11-2014
1.30
machined an aluminum spacer for the new idler pull
Details

 12-10-2014
1.00
Machined bushing for idler pulley
Details

 12-09-2014
1.00
Removed Idler Pulley
Details

 01-24-2014
3.50
Set Prop Pitch, Installed Engine block heater
Details
       

 12-20-2013
2.00
Reinstalled bulkhead fairing
Details

 12-18-2013
3.00
Trouble shoot fuel line leak
Details

 12-17-2013
4.50
Completed heater electrical, Ran Engine
Details
     

 12-16-2013
3.00
Reinstalled heater, filled with coolant
Details

 12-04-2013
2.50
Installed new muffler, rerouted coolant overflow
Details
       

 11-15-2013
2.50
Removed muffler for rerturn to viking
Details

 11-06-2013
2.00
Instlled Coolant overflow tank, Reworked fuselage
Details
       

 10-18-2013
5.00
Fabricated and installed crankcase breather tube
Details
       

 08-07-2013
4.50
Torqqued manifild,Extended engine intake temp. har
Details

 08-05-2013
7.50
Completed throttle cable installation
Details
       

 08-03-2013
2.00
Installed throttle cable.
Details

 07-23-2013
3.00
More engine work
Details

 07-18-2013
2.00
Installed updated ECU,Installed ADSB box
Details

 07-15-2013
3.50
Wiring, intake manifold fitting
Details

 07-12-2013
1.50
Installed Alternator out light
Details

 07-11-2013
3.00
Rework oil cooler hoses
Details
     

 07-10-2013
3.50
Reinstalled oil cooler, trial fitted new intake ma
Details
       

 07-03-2013
2.50
Rewire engine ground
Details

 07-02-2013
2.50
Disassembled engine components for update
Details

 06-18-2013
3.30
Update intake manifold and coolant system
Details

 06-14-2013
3.00
Installed Idler Pulley, Belt and Alternator
Details
     

 05-29-2013
2.00
Installed Craknshaft pulley and reinstalled ngine
Details
     

 05-28-2013
2.00
Removed engine for Pulley update
Details

 05-18-2013
1.50
Turned and installed Idler bushing
Details

 05-15-2013
1.50
Preparing for pulley update
Details
       

 05-13-2013
1.00
Reinstalled radiator
Details
     

 12-19-2012
1.00
Added Dipstick to oil filler cap.
Details
       

 08-30-2012
3.50
Worked on Engine wiring
Details

 08-27-2012
4.50
Wiring engine and panel
Details

 08-10-2012
4.00
Converted all Nylock locknuts to Steel locknuts
Details

 07-17-2012
5.50
Completed Oil Cooler Mounting
Details
       

 07-16-2012
4.00
Fabricated new Oill Cooler brackets
Details

 06-11-2012
8.00
Repaired interfence on engine mount
Details
       

 06-07-2012
1.00
Wired sensors on engine
Details
       

 06-05-2012
4.00
Installed Fittings and wired Fuel pump Assembly
Details
     

 06-04-2012
3.20
Modified Oil Cooler
Details
       

 05-22-2012
1.50
Pulled ECU harness through Firewall
Details
       

 05-21-2012
3.00
Insatalled Oil Cooler
Details
       

 05-14-2012
2.50
Worked on cable routing and oilcooler install
Details
       

 05-12-2012
7.00
Installed gearbox and radiator
Details
       

 04-06-2012
2.00
Still Working on Fuel system
Details
     

 04-03-2012
4.50
Partially Installed fuel pumps/lines
Details
     

 04-02-2012
2.00
Installing Fuel Pump System
Details
     

 03-15-2012
8.00
Installed Engine
Details
       

 03-07-2012
2.50
Recieved Viking engine today
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.