KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
Work Logs Found: 7
Category Work Time: 9 Hours
 Date
Hours
Work Log Summary

Details

 09-29-2013
1.00
Adjusted the length of the heater hoses
Details
       

 08-04-2013
3.00
Moved the Coolant Tank Medially and Forward
Details
       

 08-31-2012
0.25
Installed the Cowl Flap Switch
Details
     

 03-03-2012
1.50
Trimmed Coolant Reservoir Hose
Details

 03-02-2012
0.00
Secured Heater Hoses
Details
       

 03-02-2012
2.00
Attached Coolant Hoses to the Heater
Details
       

 02-28-2012
1.50
Wired the Cowl Flap Control Switch
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.