Powered By Kitlog Pro v2.0
Andrews Web Site
Nexus Mustang
Elevator
Work Logs Found:
27
Category Work Time:
92 Hours
Date
Hours
Work Log Summary
Details
02-09-2019
6.00
More Elevator trimming and Fitting
Details
02-03-2019
5.00
Fitting and triming elevator installation
Details
01-28-2019
1.00
Fitting the right Elevator
Details
01-27-2019
3.00
Closed Right Elevator
Details
01-20-2019
2.00
Left Elevator Check Fit
Details
01-19-2019
3.00
Started Closing the left elevator
Details
01-19-2019
2.00
Closed Trim Tab
Details
01-09-2019
5.00
Trim Tab Parts
Details
12-30-2018
5.00
Working the Elevator Trim Tab
Details
11-30-2018
4.00
Left Elevator Spar Build and Rigging
Details
11-25-2018
2.00
Rigging the Right Elevator
Details
10-28-2018
5.00
Final Elevator Skin Bending
Details
09-15-2018
5.00
Elevator Trim Tab Cutout
Details
09-08-2018
1.00
Elevator Nose Bend
Details
09-03-2018
2.00
Elevator Skin Layout
Details
07-29-2018
3.00
Elevator Alignment Fixture Construction
Details
06-01-2018
5.00
Elevator Parts
Details
06-09-2012
3.00
Fin Spar Rigging
Details
03-13-2012
3.00
Elevator Bellcrank Interface
Details
03-12-2012
2.00
Redesign of Elevator Control Linkage
Details
03-04-2012
2.00
Elevator Component Fab
Details
03-02-2012
6.00
Elevator Bellcrank/horn
Details
02-26-2012
3.00
Final Weld of Control Horns
Details
02-25-2012
3.00
Welding Elevator Horn
Details
02-19-2012
3.00
Preping for elevator horn weld
Details
02-18-2012
2.00
Elevator Horns
Details
02-17-2012
6.00
Rudder Cable Routing Path and Elevator Horn
Details
SITE NAVIGATION
Contact Builder
Nexus Mustang Home
Category
# Logs
# Hours
All
541
2944
Elevator
27
92
Empennage
87
246
Engine
2
25
Flaps and Ailerons
27
280
Flight Controls
1
20
Forming Parts
15
54
Fuselage
184
1059
Landing Gear
7
46
Miscellaneous
2
6
None
1
Part and Tool Accumu
20
57
Rudder
31
61
Tools
3
26
Wing Spar
24
104
Wings
110
868
Copyright © 2001-2024 Matronics. All Rights Reserved.