Powered By Kitlog Pro v2.0
Bill & Brendas RV-8 QB
RV-8
Panel
Work Logs Found:
40
Category Work Time:
78 Hours
Date
Hours
Work Log Summary
Details
09-24-2014
2.50
Labels-2
Details
09-24-2014
2.00
Labels-1
Details
12-26-2013
0.25
Power up panel and basic check-2
Details
09-25-2013
0.50
Front airvent reducer installed
Details
09-22-2013
1.25
install hobbs,elt,and air vent in panel
Details
09-09-2013
1.00
installing the flightcom intercom and acs starter
Details
09-07-2013
2.00
installing instruments into panel and prep for wir
Details
08-27-2013
1.00
test radio and transponder for power up
Details
08-27-2013
1.00
Install 4 circuit breakers
Details
08-23-2013
0.50
Stall warner circuit board install
Details
08-10-2013
1.50
Dimmer heat sink-2 and encoder mounted
Details
08-09-2013
1.25
Cockpit dimmer potentiometer install x2
Details
09-29-2012
0.75
ACS ignition switch back plate fab -2
Details
09-27-2012
1.00
Acs ignition switch back plate-1
Details
09-25-2012
2.50
Paint and misc. on panel, fab a brace for P brake
Details
09-24-2012
2.25
panel radio tray bracket rear support -2
Details
09-23-2012
1.50
Fab brackets to secure back of xpr tray to airfram
Details
09-07-2012
2.75
Radio tray mounting brackets rivited
Details
08-28-2012
1.75
Trim indicator cut outs
Details
08-27-2012
1.25
Hobb meter cut out and fitting
Details
08-26-2012
1.00
Elt remote switch hole cut in panel
Details
08-25-2012
1.25
Warning/alert indicators and dimmers
Details
07-26-2012
1.50
panel radio cut out and mount bracket drill
Details
07-19-2012
1.00
Dynon mount-2 and radio mounting cut out work
Details
07-17-2012
0.75
Dynon ems120 mount install-1
Details
07-16-2012
2.00
Cut out for Dynon EMS 120
Details
05-14-2012
1.00
Airspeed indicator adjustment knob repair
Details
04-10-2012
2.25
Remade radio mount, misc
Details
03-27-2012
3.50
696 and xponder angles. SL40 mount
Details
03-26-2012
2.50
Transponder and 696 angle brackets
Details
03-23-2012
2.50
Transponder cut out work-3 and fitting for angle b
Details
03-18-2012
3.75
Panel cuts for the transponder and the SL40
Details
03-17-2012
4.00
Cut panel for garmin 696 air gizmo mounting trey
Details
03-13-2012
3.00
Panel compass adjusting holes and VSI ring mount,
Details
03-12-2012
1.50
more measurements and planing
Details
03-07-2012
2.50
Test fit all the steam gauges for fit and clearenc
Details
02-26-2012
5.50
panel gauge fitting 4
Details
02-25-2012
1.00
panel 3
Details
02-24-2012
5.50
Panel cuts 2
Details
02-22-2012
3.50
Cut vent and intercom holes in panel side skirts
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1040
2332
baffles
37
97
brake system
16
23
Canopy
64
162
Canopy skirt
47
75
Canopy/windscreen
64
162
cowling
58
130
electical-FWF
4
3
Electrical-cockpit
12
16
Elevators
20
63
Empennage
11
28
Engine
20
41
Exterior lights and
6
8
FAB
16
36
Fiberglass fairings
9
8
Fiberglass tips
46
68
Firewall Forward
46
90
Fuselage
136
329
Horizontal Stabilize
15
68
interior cushions an
3
8
Inventory
8
19
jigs, cradles, stand
6
15
Kit arrival
7
6
labels and plackards
2
3
Landing gear
17
40
Lights
12
28
Miscellaneous
56
96
None
1
1
Panel
40
78
paperwork
2
4
phase one tests
4
Practice kit
6
23
practice kit or tria
1
2
Prop
12
29
Propeller/Spinner
12
29
Rudder
16
43
Seats and floors
7
31
Tools
1
1
Vertical Stabilizer
8
18
weight and balance
3
8
Wing Fit/install
27
76
Wing Fitting
27
76
wing tip lights and
5
16
Wing Tips
7
20
Wings
43
123
Wire work
22
27
Wiring behind panel
34
63
wiring-cabin
24
42
Copyright © 2001-2024 Matronics. All Rights Reserved.