Wendells RV-6A
Work Logs Found: 24
Category Work Time: 82 Hours
 Date
Hours
Work Log Summary

Details

 09-02-2024
4.00
Make Stick Boots
Details
       

 09-23-2020
0.00
Make Rudder Cable Links 2
Details
       

 09-23-2020
4.00
Make Rudder Cable Links
Details
       

 07-13-2015
2.00
Wired A/P level function to Stick Grips
Details
       

 05-10-2015
8.00
Install Tosten Grips 9
Details
     

 05-02-2015
0.00
Install Tosten Grips 8
Details
       

 05-02-2015
6.00
Install Tosten Grips 7
Details
       

 04-30-2015
2.00
Install Tosten Grips 6
Details
       

 04-28-2015
2.00
Install Tosten Grips 5
Details
       

 04-28-2015
1.00
Install Tosten Grips 4
Details
       

 04-28-2015
7.00
Install Tosten Grips 3
Details
       

 04-21-2015
0.00
Install Tosten Grips 2
Details
       

 04-21-2015
3.00
Install Tosten Grips 1
Details
       

 07-07-2014
8.00
Heater Cable Attached
Details
       

 04-20-2013
2.00
Install Dynon Pitch Servo
Details
       

 03-08-2013
2.00
Parking Brake Cable Install
Details
       

 03-08-2013
6.00
Control Cables
Details
       

 10-14-2012
2.00
Push Rod 2 - F-690
Details
       

 10-14-2012
3.00
Push Rod 1 - F-689
Details
       

 03-26-2012
1.00
Drill Flap Actuator Shaft for Safety Wire
Details
       

 03-10-2012
1.00
Make the elevator bellcrank
Details
       

 02-20-2012
8.00
Fit the electric flap housing
Details
       

 01-30-2012
8.00
Prepare Control Sticks
Details
       

 08-10-2011
1.50
WD-610 Control/Elevator Tube Fitted
Details
       