KitLog pro

Powered By Kitlog Pro v2.0

Timothys Mazda 20B RV-10
Work Logs Found: 17
Category Work Time: 74 Hours
 Date
Hours
Work Log Summary

Details

 03-04-2012
1.00
Polished
Details

 03-04-2012
0.00
ELT Check
Details

 03-03-2012
6.00
Complete Pre-Inspection
Details

 02-25-2012
5.00
Inspected wings
Details

 02-19-2012
2.00
Cowling Fastners & Inspection
Details

 02-17-2012
8.00
Ground Run
Details

 02-03-2012
4.00
Panel Labels
Details
       

 01-29-2012
4.00
Installed Side panels
       

 01-29-2012
4.00
Installed Fuel Cap labels
Details
     

 01-29-2012
5.00
Install Pax Seat Belts, wire ties
Details
     

 01-22-2012
3.00
Install panel labels
Details
       

 01-21-2012
5.40
Weight and Balance
Details
       

 12-28-2011
4.00
Data Plate, B-Nut, Circuit Breakers
Details
     

 09-21-2011
6.00
Installed Floor Panels
Details

 09-20-2011
5.00
Interior Work
Details

 07-31-2010
8.00
Installed Trim
Details

 07-07-2010
4.00
Moved To Hangar
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.