Timothys Mazda 20B RV-10
RV-10
Electrical
Work Logs Found:
21
Category Work Time:
109 Hours
Date
Hours
Work Log Summary
Details
01-07-2012
5.50
Zipped Tied Wires
Details
06-11-2011
2.00
Installed Transponder Switch
05-28-2011
10.00
Transponder, RDAC, Fuel System
Details
05-20-2011
2.00
RDAC wiring
02-27-2011
6.20
Nav, Strobe, Landing Light Install
Details
02-26-2011
4.00
Landing Light Install
Details
01-22-2011
5.00
Wiring Panel
08-29-2010
6.00
Wiring Tru Trak/Radio
Details
08-01-2010
8.00
Wired Trim Servos
Details
01-17-2010
6.00
Wiring Panel and center console
01-16-2010
5.00
Routing Wires
01-15-2010
8.00
Wiring Panel
01-04-2010
2.00
Wiring Panel
12-05-2009
2.00
Wiring Fuel Pumps
11-25-2009
6.00
Wiring Panel Components
11-22-2009
6.00
Running Wiring
11-15-2009
5.00
Installed Center Console
11-14-2009
6.00
Installed Center Console
11-06-2009
6.00
Installed Components on panel
08-08-2009
6.00
Wired Strobes
08-02-2009
2.00
Wiring
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
461
1567
Avionics
7
32
Electrical
21
109
Empennage
17
74
Empennage-Elevators
26
41
Empennage-Horizontal
18
45
Empennage-Rudder
10
19
Empennage-Tail Cone
34
72
Empennage-Vertical S
8
27
Engine
21
159
Engine
32
132
Firewall Forward
8
30
Fuselage
128
475
Inventory
5
10
Lighting
1
1
Paint
1
2
Paint Prep
2
3
Position Lights
1
0
Prop
3
16
Wings
118
320