KitLog pro

Powered By Kitlog Pro v2.0

Timothys Mazda 20B RV-10
Work Logs Found: 32
Category Work Time: 132 Hours
 Date
Hours
Work Log Summary

Details

 10-14-2011
6.00
Welded Exhaust
Details

 09-14-2011
5.00
Trouble Shooting Injectors
Details

 09-11-2011
3.00
Engine, spinner, Ducting, landing lights
Details

 09-02-2011
8.00
Engine Runs/Exhaust
Details

 08-21-2011
4.00
Rad Duct
Details

 08-14-2011
4.00
Install New Oil Cooler
Details

 08-06-2011
6.00
Formed Shell for rad ducting
Details

 06-12-2011
4.00
Filled Fluids, oil/water
Details

 06-11-2011
4.00
Fuel Line test, pressure test
Details

 03-24-2011
8.00
Exhaust
Details

 03-22-2011
6.00
Oil System
Details

 10-10-2010
5.00
Welded Radator Tubes
Details

 11-13-2009
3.00
Fitted Radiator Hoses

 11-12-2009
4.00
Alternator Bracket Rework

 11-04-2009
5.00
Installed Radiator

 11-02-2009
4.00
Installed Radiator Bracket

 08-26-2009
4.00
Disengage Internal Reg on Alternator

 07-30-2009
2.00
Welded Last of Intake

 07-28-2009
2.00
Finish Welding Intake

 07-21-2009
4.00
Intall Fuel Pressure Regulator

 07-18-2009
4.00
Intake

 07-17-2009
4.00
Refitting Intake

 07-12-2009
1.00
Installed Welded Intake

 07-10-2009
4.00
Run Engine Wiring

 07-09-2009
6.00
Welded Intake

 07-08-2009
4.50
Mounted Intake

 06-27-2009
3.00
Construct Intake

 06-25-2009
4.00
Install Reduction Gear Box

 06-23-2009
2.00
Mounted Coils

 06-15-2009
2.00
Mounting

 06-08-2009
4.00
Installed Engine Brackets

 06-03-2009
3.00
Installed Alternator Bracket










Copyright © 2001-2024 Matronics. All Rights Reserved.