KitLog pro

Powered By Kitlog Pro v2.0

Timothys Mazda 20B RV-10
Work Logs Found: 21
Category Work Time: 159 Hours
 Date
Hours
Work Log Summary

Details

 03-17-2012
3.00
Ground Runs
Details

 11-13-2011
4.00
Installed Muffler
Details
       

 11-12-2011
4.00
Muffler
Details
     

 10-10-2011
5.00
New Exhaust
Details

 09-19-2011
5.00
Oil Cooler Ducting
Details

 09-16-2011
3.00
Oil Cooler Duct
Details

 09-10-2011
6.00

Details

 08-31-2011
77.00
Engine Runs

 08-20-2011
4.00
Engine Start
Details

 08-14-2011
3.00
Installed Seat Belts,fixed oil leak

 08-13-2011
5.00
UHS Spinner
Details
     

 07-16-2011
3.00
Completed Engine/oil cooler
Details

 06-25-2011
4.00
FIRST ENGINE Start
Details
       

 06-24-2011
3.00
Engine-fixing leaks
Details
     

 06-22-2011
3.00
Fluids
Details

 03-25-2011
7.80
Filled Brakes
Details

 10-16-2010
5.00
Welded Radator Tubes
Details

 08-09-2009
6.00
Coils Mounted/Reducion Gear Box oil Line

 06-12-2009
2.00
Installed

 06-06-2009
3.00
Installed Cowling

 11-08-2007
3.00
Uncrated/Stored










Copyright © 2001-2024 Matronics. All Rights Reserved.