Powered By Kitlog Pro v2.0
Timothys Mazda 20B RV-10
RV-10
Engine
Work Logs Found:
21
Category Work Time:
159 Hours
Date
Hours
Work Log Summary
Details
03-17-2012
3.00
Ground Runs
Details
11-13-2011
4.00
Installed Muffler
Details
11-12-2011
4.00
Muffler
Details
10-10-2011
5.00
New Exhaust
Details
09-19-2011
5.00
Oil Cooler Ducting
Details
09-16-2011
3.00
Oil Cooler Duct
Details
09-10-2011
6.00
Details
08-31-2011
77.00
Engine Runs
08-20-2011
4.00
Engine Start
Details
08-14-2011
3.00
Installed Seat Belts,fixed oil leak
08-13-2011
5.00
UHS Spinner
Details
07-16-2011
3.00
Completed Engine/oil cooler
Details
06-25-2011
4.00
FIRST ENGINE Start
Details
06-24-2011
3.00
Engine-fixing leaks
Details
06-22-2011
3.00
Fluids
Details
03-25-2011
7.80
Filled Brakes
Details
10-16-2010
5.00
Welded Radator Tubes
Details
08-09-2009
6.00
Coils Mounted/Reducion Gear Box oil Line
06-12-2009
2.00
Installed
06-06-2009
3.00
Installed Cowling
11-08-2007
3.00
Uncrated/Stored
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
461
1567
Avionics
7
32
Electrical
21
109
Empennage
17
74
Empennage-Elevators
26
41
Empennage-Horizontal
18
45
Empennage-Rudder
10
19
Empennage-Tail Cone
34
72
Empennage-Vertical S
8
27
Engine
21
159
Engine
32
132
Firewall Forward
8
30
Fuselage
128
475
Inventory
5
10
Lighting
1
1
Paint
1
2
Paint Prep
2
3
Position Lights
1
0
Prop
3
16
Wings
118
320
Copyright © 2001-2024 Matronics. All Rights Reserved.