|
|
|
|
Mikes Helicycle
Work
Logs
Found:
23
|
Category Work Time: 64 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
03-23-2012
|
4.00
|
Tail fins, cabin halves
|
Details
|
|
|
03-18-2012
|
3.00
|
Tail drive shaft alignment
|
Details
|
|
|
03-17-2012
|
1.00
|
Tail fin paint, pinstripe
|
Details
|
|
|
02-13-2012
|
2.00
|
Vertical fin, LED strobes
|
Details
|
|
|
02-11-2012
|
1.50
|
Vertical fin
|
Details
|
|
|
02-08-2012
|
1.50
|
Horizontal Stab
|
Details
|
|
|
02-06-2012
|
2.00
|
Tail fin alignment
|
Details
|
|
|
05-27-2011
|
5.00
|
Safety wiring, smoothing T/R shaft - slider
|
Details
|
|
|
05-26-2011
|
2.00
|
Tail rotor removal, gearbox oil
|
Details
|
|
|
05-25-2011
|
2.00
|
Tail rotor polish, gearbox plug
|
Details
|
|
|
05-24-2011
|
5.00
|
More polishing, seat foam, safety wiring
|
Details
|
|
|
03-29-2011
|
5.50
|
Tail drive shaft, Collective friction, Shaft plug
|
Details
|
|
|
03-21-2011
|
2.00
|
Tail drive shaft
|
Details
|
|
|
03-20-2011
|
9.50
|
Tail drive shaft
|
Details
|
|
|
03-19-2011
|
6.00
|
Tail drive shaft
|
Details
|
|
|
03-18-2011
|
2.50
|
More tail rotor work
|
Details
|
|
|
03-17-2011
|
4.00
|
Tail rotor rigging
|
Details
|
|
|
02-17-2011
|
0.50
|
Tail drive couplers
|
Details
|
|
|
12-05-2010
|
1.00
|
Tail drive shaft alignment
|
Details
|
|
|
11-19-2010
|
0.50
|
Vert Trim Fin
|
Details
|
|
|
11-09-2010
|
1.00
|
Drilled tail rotor hub/shaft
|
Details
|
|
|
11-09-2010
|
1.00
|
Drilled tail blade retaining bolts
|
Details
|
|
|
11-01-2010
|
1.00
|
Safety wire holes, tail rotor trans
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |