KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
Work Logs Found: 127
Category Work Time: 1107 Hours
 Date
Hours
Work Log Summary

Details

 03-01-2013
7.50
right wing riveting, skins - surface prep
Details
       

 02-28-2013
7.00
R wing riveting, priming, tip heat shielding.
Details
       

 02-27-2013
10.50
R wing riveting
Details
       

 02-26-2013
9.00
Rivet work R wing, loading of left wing and parts
Details
       

 02-25-2013
8.00
Complete L wing masked, rivet work R wing
Details
       

 02-22-2013
9.00
Masking and prep of left wing for paint, right win
Details
       

 02-21-2013
10.00
L wing prep, vent breathers made up, root fairings
Details
       

 02-20-2013
11.50
Lwing prepped for paint, sender safetied, tank fin
Details
       

 02-19-2013
10.00
R wing, tip marked and drilled, tank finalized
Details
       

 02-18-2013
8.50
R wing surfaces installed, pitot finished and fitt
Details
       

 02-15-2013
9.50
R wing tip work, workshop clean up
Details
       

 02-14-2013
12.00
Continued work on the Right wing tip, remedy on th
Details
       

 02-13-2013
11.50
Work begun on finalizing Right wing....
Details
       

 01-31-2013
8.50
Right wing tip light installtion, priming and stri
Details
       

 01-30-2013
8.50
Right wing tip, fitting and tip light installation
Details
       

 01-29-2013
8.50
Began work on the Right wing tip....
Details
       

 01-25-2013
10.00
platenuts instlled in L tip and tip finalized cont
Details
       

 01-24-2013
9.50
Finalized wing tip left wing - redo and adjustment
Details
       

 01-23-2013
12.50
Finalized wing tip installtion left wing
Details
       

 01-22-2013
10.00
Installation of platenuts into tips more fitting
Details
       

 01-18-2013
10.50
make-up, fitting and glueing of strips to tips
Details
       

 01-17-2013
12.00
Final drilling, deburring and dimpling of the wing
Details
       

 01-16-2013
12.00
Match-drilling tip and installed tip rib
Details
       

 01-15-2013
11.00
Match drilling and fit adjustments
Details
       

 01-11-2013
5.50
First fit of wing tip - left wing
Details
       

 01-10-2013
8.50
continued Tip fitment and finalized aileron alignm
Details
       

 01-08-2013
9.50
Continued left wing aileron alignm,ent and tip fit
Details
       

 01-07-2013
8.00
Left wing wing tip fitment and aileron alignment
Details
       

 01-03-2013
9.00
Wing finishing - back into cabin panel mounts and
Details
       

 01-02-2013
7.00
back at work, wing finishing
Details
     

 12-20-2012
8.50
Avionics fitted and began sorting for installation
Details
       

 12-19-2012
8.00
Wing skin finishing, tip template made and fitted
Details
       

 12-18-2012
8.50
Wing tip repair, fitting and trim...finished skin
Details
       

 12-15-2012
4.00
Some weekend work on fitting the tip....
Details
       

 12-14-2012
9.00
Aileron and flap line up and install & tip install
Details
       

 12-13-2012
9.50
lining up of aileron and flap on Right wing......
Details
       

 12-12-2012
9.50
Fitted flap and aileron and set up to line up for
Details
       

 12-11-2012
9.00
Carried on riveting - Right wing skin almost done.
Details
       

 12-10-2012
7.00
Continued wing skin riveting
Details
       

 12-07-2012
9.00
Clean and wrap painted parts, wing skin riveting..
Details
       

 12-06-2012
9.00
Continued RW re-skinning...collected contrl surfac
Details
       

 12-05-2012
8.50
RW - Conduit final installed wing skin re riveted.
Details
       

 12-04-2012
9.00
Right wing repair cont.....delivery of metal to cu
Details
       

 12-03-2012
7.00
Right wing continued - repair of snapped conduit..
Details
       

 11-30-2012
9.00
Right wing skin continued....panel artwork emailed
Details
       

 11-28-2012
8.50
Continued rivet work on Right wing.....
Details
       

 11-27-2012
9.00
Finished off the tips for good, wing skin riveting
Details
       

 11-26-2012
7.50
finalized these tips - reinforcing glassed in, gla
Details
       

 11-23-2012
8.50
Wing tips reinforcing and glassing...
Details
       

 11-22-2012
8.50
Continued tips reinforcing and glassing
Details
       

 11-21-2012
8.50
Strips bonded in, glassing begun
Details
       

 11-20-2012
9.00
Wing tip reinforcing
Details
       

 11-19-2012
8.00
continued wing skin finishing,
Details
       

 11-16-2012
7.50
Wing filled and finished, wing tip reinforcing
Details
       

 11-15-2012
9.00
LW - wingtips, finishing, RW - riveting....
Details
       

 11-14-2012
8.00
Wingtips - LW finishing, RW riveting
Details
       

 11-13-2012
8.50
LW wingtip, more prep and finish, cradle adjstd...
Details
       

 11-09-2012
8.50
LW finishing and prep
Details
       

 11-08-2012
10.50
finalized LW to be ready for tomorrow...wkshp work
Details
       

 11-06-2012
9.50
LW - more riveting
Details
       

 11-05-2012
8.00
LW - Riveting continued
Details
       

 11-01-2012
10.00
More riveting, lamp assembly, RW tank cover plate
Details
       

 10-31-2012
9.00
riveting, worked on tip lamps....
Details
       

 10-30-2012
9.00
RW Continued riveting...
Details
       

 10-29-2012
7.00
continued riveting, colelction of part (failed)
Details
       

 10-26-2012
8.50
riveting and final install of conduit and wire rou
Details
       

 10-25-2012
9.00
Prep and prime of LW skin, cut conduit, sourced to
Details
       

 10-23-2012
9.50
LW skin prep, tool search, pulled out conduit...
Details
       

 10-22-2012
7.00
LW skin prep and match drill, drilled out LW rivet
Details
       

 10-19-2012
9.50
RW skin riveting,
Details
       

 10-18-2012
8.50
LW skin prep, more RW skin riveting, final work on
Details
       

 10-17-2012
8.50
Installation of pitot plumbing, prep of new skin,
Details
       

 10-16-2012
9.00
LW new conduit, skin riveting, practice riveting
Details
       

 10-15-2012
8.00
repair of conduit intsectn, skin riveting, cabin f
Details
       

 10-12-2012
9.00
LW fuel cap, tank pressure test, conduit intrsectn
Details
       

 10-11-2012
10.00
RW wing tank finalized, fuel cap installed
Details
       

 10-10-2012
9.00
RW..resecured the conduit,
Details
       

 10-09-2012
8.50
RW.. servo adjst, platenuts and skin installation.
Details
       

 10-08-2012
6.50
RW.. refitted the tank and installtion of servo as
Details
       

 10-04-2012
10.00
Strpped the wing LE to fix the sheared bolt....
Details
       

 10-03-2012
9.50
Roll servo installation....
Details
       

 10-02-2012
9.00
Finalized and prep RHS wing for buttoning up
Details
       

 10-01-2012
9.00
Complete removal of LHS wing skin,
Details
       

 09-28-2012
9.00
Priming of skins and internals,
Details
       

 09-27-2012
9.50
...cont wing skin riveting
Details
     

 09-26-2012
9.00
...cont wing skin riveting
Details
       

 09-25-2012
9.50
...cont wing skin riveting
Details
     

 09-21-2012
9.00
Began riveting wing skins and wing finalization
Details
       

 09-20-2012
9.00
Pitot system made up and installed, Left wing retr
Details
       

 09-19-2012
9.00
R Wing tip, all landing light mounts made up, tip
Details
       

 09-18-2012
9.00
Wing finalizing, wing tip and lights - Right
Details
       

 09-17-2012
8.50
retro work to finalize wings - right wing.
Details
       

 06-20-2011
10.00
Wing root bottom skin final drilled

 06-17-2011
5.00
Wing root fairings nutplates installed, fairings s
     

 06-15-2011
10.00
Wing root fairings sanded, primed, dimpled and com
     

 06-14-2011
10.00
Continued work on wing roots and fuz attach points
     

 06-13-2011
9.00
Wing holes dimples, fuz wing off work
     

 06-10-2011
10.00
aileron travel adjusted and linkages assembled, bo

 06-07-2011
10.00
Control column install to aileron linkage - Left w
     

 06-06-2011
10.00
Wing tank attach brackets install,
     

 05-19-2011
10.00
Continued work on Flaps and flap system
     

 05-17-2011
11.00
Wing root fairings re-fitted and match-drilled
     

 05-16-2011
8.00
various fitting with wings installed
Details
     

 04-14-2011
10.00
Wings put away and work continued on fuz

 04-13-2011
10.00
Right wing flap brace fixed and Left wing aileron

 04-12-2011
9.50
Flap braces fitted and riveted

 04-11-2011
9.50
Final paint of wing parts
Details

 04-05-2011
5.00
Wing tanks and seals

 04-01-2011
10.00
Prep of L&R wing parts for paint
Details

 03-31-2011
5.50
Work begun on Right wing

 03-28-2011
5.50
Finalizing the left wing

 03-25-2011
5.50
work on wing

 03-18-2011
9.00
Aileron Bellcranks and aierons installed

 03-16-2011
9.00
Pitot system final install and seatback replaced

 03-15-2011
5.50
Pitot fabricate and installation

 03-14-2011
5.50
Left aileron bellcrank installed in wing

 03-11-2011
9.00
work on wings

 03-10-2011
5.00
Wings continued

 03-09-2011
9.00
Work on wings

 03-04-2011
9.00
Internal flaps system install
       

 02-04-2011
8.15
Trimmed wing skins

 02-03-2011
7.75
Wing bottom skins
Details

 02-01-2011
3.00
Worked on wings bottom skins
Details

 01-19-2011
7.50
Elevator brace and Aileron gap fairings primed
Details

 01-18-2011
9.00
"Wings R" Tank bolts torqued first time.

 01-17-2011
9.50
Aileron brackets drilled and dimpled
Details

 01-13-2011
7.00
Aileron brackets made up.










Copyright © 2001-2024 Matronics. All Rights Reserved.