Date
|
Hours
|
Work Log Summary
|
Details
|
03-01-2013
|
7.50
|
right wing riveting, skins - surface prep
|
Details
|
|
|
02-28-2013
|
7.00
|
R wing riveting, priming, tip heat shielding.
|
Details
|
|
|
02-27-2013
|
10.50
|
R wing riveting
|
Details
|
|
|
02-26-2013
|
9.00
|
Rivet work R wing, loading of left wing and parts
|
Details
|
|
|
02-25-2013
|
8.00
|
Complete L wing masked, rivet work R wing
|
Details
|
|
|
02-22-2013
|
9.00
|
Masking and prep of left wing for paint, right win
|
Details
|
|
|
02-21-2013
|
10.00
|
L wing prep, vent breathers made up, root fairings
|
Details
|
|
|
02-20-2013
|
11.50
|
Lwing prepped for paint, sender safetied, tank fin
|
Details
|
|
|
02-19-2013
|
10.00
|
R wing, tip marked and drilled, tank finalized
|
Details
|
|
|
02-18-2013
|
8.50
|
R wing surfaces installed, pitot finished and fitt
|
Details
|
|
|
02-15-2013
|
9.50
|
R wing tip work, workshop clean up
|
Details
|
|
|
02-14-2013
|
12.00
|
Continued work on the Right wing tip, remedy on th
|
Details
|
|
|
02-13-2013
|
11.50
|
Work begun on finalizing Right wing....
|
Details
|
|
|
01-31-2013
|
8.50
|
Right wing tip light installtion, priming and stri
|
Details
|
|
|
01-30-2013
|
8.50
|
Right wing tip, fitting and tip light installation
|
Details
|
|
|
01-29-2013
|
8.50
|
Began work on the Right wing tip....
|
Details
|
|
|
01-25-2013
|
10.00
|
platenuts instlled in L tip and tip finalized cont
|
Details
|
|
|
01-24-2013
|
9.50
|
Finalized wing tip left wing - redo and adjustment
|
Details
|
|
|
01-23-2013
|
12.50
|
Finalized wing tip installtion left wing
|
Details
|
|
|
01-22-2013
|
10.00
|
Installation of platenuts into tips more fitting
|
Details
|
|
|
01-18-2013
|
10.50
|
make-up, fitting and glueing of strips to tips
|
Details
|
|
|
01-17-2013
|
12.00
|
Final drilling, deburring and dimpling of the wing
|
Details
|
|
|
01-16-2013
|
12.00
|
Match-drilling tip and installed tip rib
|
Details
|
|
|
01-15-2013
|
11.00
|
Match drilling and fit adjustments
|
Details
|
|
|
01-11-2013
|
5.50
|
First fit of wing tip - left wing
|
Details
|
|
|
01-10-2013
|
8.50
|
continued Tip fitment and finalized aileron alignm
|
Details
|
|
|
01-08-2013
|
9.50
|
Continued left wing aileron alignm,ent and tip fit
|
Details
|
|
|
01-07-2013
|
8.00
|
Left wing wing tip fitment and aileron alignment
|
Details
|
|
|
01-03-2013
|
9.00
|
Wing finishing - back into cabin panel mounts and
|
Details
|
|
|
01-02-2013
|
7.00
|
back at work, wing finishing
|
Details
|
|
|
12-20-2012
|
8.50
|
Avionics fitted and began sorting for installation
|
Details
|
|
|
12-19-2012
|
8.00
|
Wing skin finishing, tip template made and fitted
|
Details
|
|
|
12-18-2012
|
8.50
|
Wing tip repair, fitting and trim...finished skin
|
Details
|
|
|
12-15-2012
|
4.00
|
Some weekend work on fitting the tip....
|
Details
|
|
|
12-14-2012
|
9.00
|
Aileron and flap line up and install & tip install
|
Details
|
|
|
12-13-2012
|
9.50
|
lining up of aileron and flap on Right wing......
|
Details
|
|
|
12-12-2012
|
9.50
|
Fitted flap and aileron and set up to line up for
|
Details
|
|
|
12-11-2012
|
9.00
|
Carried on riveting - Right wing skin almost done.
|
Details
|
|
|
12-10-2012
|
7.00
|
Continued wing skin riveting
|
Details
|
|
|
12-07-2012
|
9.00
|
Clean and wrap painted parts, wing skin riveting..
|
Details
|
|
|
12-06-2012
|
9.00
|
Continued RW re-skinning...collected contrl surfac
|
Details
|
|
|
12-05-2012
|
8.50
|
RW - Conduit final installed wing skin re riveted.
|
Details
|
|
|
12-04-2012
|
9.00
|
Right wing repair cont.....delivery of metal to cu
|
Details
|
|
|
12-03-2012
|
7.00
|
Right wing continued - repair of snapped conduit..
|
Details
|
|
|
11-30-2012
|
9.00
|
Right wing skin continued....panel artwork emailed
|
Details
|
|
|
11-28-2012
|
8.50
|
Continued rivet work on Right wing.....
|
Details
|
|
|
11-27-2012
|
9.00
|
Finished off the tips for good, wing skin riveting
|
Details
|
|
|
11-26-2012
|
7.50
|
finalized these tips - reinforcing glassed in, gla
|
Details
|
|
|
11-23-2012
|
8.50
|
Wing tips reinforcing and glassing...
|
Details
|
|
|
11-22-2012
|
8.50
|
Continued tips reinforcing and glassing
|
Details
|
|
|
11-21-2012
|
8.50
|
Strips bonded in, glassing begun
|
Details
|
|
|
11-20-2012
|
9.00
|
Wing tip reinforcing
|
Details
|
|
|
11-19-2012
|
8.00
|
continued wing skin finishing,
|
Details
|
|
|
11-16-2012
|
7.50
|
Wing filled and finished, wing tip reinforcing
|
Details
|
|
|
11-15-2012
|
9.00
|
LW - wingtips, finishing, RW - riveting....
|
Details
|
|
|
11-14-2012
|
8.00
|
Wingtips - LW finishing, RW riveting
|
Details
|
|
|
11-13-2012
|
8.50
|
LW wingtip, more prep and finish, cradle adjstd...
|
Details
|
|
|
11-09-2012
|
8.50
|
LW finishing and prep
|
Details
|
|
|
11-08-2012
|
10.50
|
finalized LW to be ready for tomorrow...wkshp work
|
Details
|
|
|
11-06-2012
|
9.50
|
LW - more riveting
|
Details
|
|
|
11-05-2012
|
8.00
|
LW - Riveting continued
|
Details
|
|
|
11-01-2012
|
10.00
|
More riveting, lamp assembly, RW tank cover plate
|
Details
|
|
|
10-31-2012
|
9.00
|
riveting, worked on tip lamps....
|
Details
|
|
|
10-30-2012
|
9.00
|
RW Continued riveting...
|
Details
|
|
|
10-29-2012
|
7.00
|
continued riveting, colelction of part (failed)
|
Details
|
|
|
10-26-2012
|
8.50
|
riveting and final install of conduit and wire rou
|
Details
|
|
|
10-25-2012
|
9.00
|
Prep and prime of LW skin, cut conduit, sourced to
|
Details
|
|
|
10-23-2012
|
9.50
|
LW skin prep, tool search, pulled out conduit...
|
Details
|
|
|
10-22-2012
|
7.00
|
LW skin prep and match drill, drilled out LW rivet
|
Details
|
|
|
10-19-2012
|
9.50
|
RW skin riveting,
|
Details
|
|
|
10-18-2012
|
8.50
|
LW skin prep, more RW skin riveting, final work on
|
Details
|
|
|
10-17-2012
|
8.50
|
Installation of pitot plumbing, prep of new skin,
|
Details
|
|
|
10-16-2012
|
9.00
|
LW new conduit, skin riveting, practice riveting
|
Details
|
|
|
10-15-2012
|
8.00
|
repair of conduit intsectn, skin riveting, cabin f
|
Details
|
|
|
10-12-2012
|
9.00
|
LW fuel cap, tank pressure test, conduit intrsectn
|
Details
|
|
|
10-11-2012
|
10.00
|
RW wing tank finalized, fuel cap installed
|
Details
|
|
|
10-10-2012
|
9.00
|
RW..resecured the conduit,
|
Details
|
|
|
10-09-2012
|
8.50
|
RW.. servo adjst, platenuts and skin installation.
|
Details
|
|
|
10-08-2012
|
6.50
|
RW.. refitted the tank and installtion of servo as
|
Details
|
|
|
10-04-2012
|
10.00
|
Strpped the wing LE to fix the sheared bolt....
|
Details
|
|
|
10-03-2012
|
9.50
|
Roll servo installation....
|
Details
|
|
|
10-02-2012
|
9.00
|
Finalized and prep RHS wing for buttoning up
|
Details
|
|
|
10-01-2012
|
9.00
|
Complete removal of LHS wing skin,
|
Details
|
|
|
09-28-2012
|
9.00
|
Priming of skins and internals,
|
Details
|
|
|
09-27-2012
|
9.50
|
...cont wing skin riveting
|
Details
|
|
|
09-26-2012
|
9.00
|
...cont wing skin riveting
|
Details
|
|
|
09-25-2012
|
9.50
|
...cont wing skin riveting
|
Details
|
|
|
09-21-2012
|
9.00
|
Began riveting wing skins and wing finalization
|
Details
|
|
|
09-20-2012
|
9.00
|
Pitot system made up and installed, Left wing retr
|
Details
|
|
|
09-19-2012
|
9.00
|
R Wing tip, all landing light mounts made up, tip
|
Details
|
|
|
09-18-2012
|
9.00
|
Wing finalizing, wing tip and lights - Right
|
Details
|
|
|
09-17-2012
|
8.50
|
retro work to finalize wings - right wing.
|
Details
|
|
|
06-20-2011
|
10.00
|
Wing root bottom skin final drilled
|
|
|
|
06-17-2011
|
5.00
|
Wing root fairings nutplates installed, fairings s
|
|
|
|
06-15-2011
|
10.00
|
Wing root fairings sanded, primed, dimpled and com
|
|
|
|
06-14-2011
|
10.00
|
Continued work on wing roots and fuz attach points
|
|
|
|
06-13-2011
|
9.00
|
Wing holes dimples, fuz wing off work
|
|
|
|
06-10-2011
|
10.00
|
aileron travel adjusted and linkages assembled, bo
|
|
|
|
06-07-2011
|
10.00
|
Control column install to aileron linkage - Left w
|
|
|
|
06-06-2011
|
10.00
|
Wing tank attach brackets install,
|
|
|
|
05-19-2011
|
10.00
|
Continued work on Flaps and flap system
|
|
|
|
05-17-2011
|
11.00
|
Wing root fairings re-fitted and match-drilled
|
|
|
|
05-16-2011
|
8.00
|
various fitting with wings installed
|
Details
|
|
|
04-14-2011
|
10.00
|
Wings put away and work continued on fuz
|
|
|
|
04-13-2011
|
10.00
|
Right wing flap brace fixed and Left wing aileron
|
|
|
|
04-12-2011
|
9.50
|
Flap braces fitted and riveted
|
|
|
|
04-11-2011
|
9.50
|
Final paint of wing parts
|
Details
|
|
|
04-05-2011
|
5.00
|
Wing tanks and seals
|
|
|
|
04-01-2011
|
10.00
|
Prep of L&R wing parts for paint
|
Details
|
|
|
03-31-2011
|
5.50
|
Work begun on Right wing
|
|
|
|
03-28-2011
|
5.50
|
Finalizing the left wing
|
|
|
|
03-25-2011
|
5.50
|
work on wing
|
|
|
|
03-18-2011
|
9.00
|
Aileron Bellcranks and aierons installed
|
|
|
|
03-16-2011
|
9.00
|
Pitot system final install and seatback replaced
|
|
|
|
03-15-2011
|
5.50
|
Pitot fabricate and installation
|
|
|
|
03-14-2011
|
5.50
|
Left aileron bellcrank installed in wing
|
|
|
|
03-11-2011
|
9.00
|
work on wings
|
|
|
|
03-10-2011
|
5.00
|
Wings continued
|
|
|
|
03-09-2011
|
9.00
|
Work on wings
|
|
|
|
03-04-2011
|
9.00
|
Internal flaps system install
|
|
|
|
02-04-2011
|
8.15
|
Trimmed wing skins
|
|
|
|
02-03-2011
|
7.75
|
Wing bottom skins
|
Details
|
|
|
02-01-2011
|
3.00
|
Worked on wings bottom skins
|
Details
|
|
|
01-19-2011
|
7.50
|
Elevator brace and Aileron gap fairings primed
|
Details
|
|
|
01-18-2011
|
9.00
|
"Wings R" Tank bolts torqued first time.
|
|
|
|
01-17-2011
|
9.50
|
Aileron brackets drilled and dimpled
|
Details
|
|
|
01-13-2011
|
7.00
|
Aileron brackets made up.
|
|
|