BEZJet Build
Work Logs Found: 11
Category Work Time: 64 Hours
 Date
Hours
Work Log Summary

Details

 05-06-2017
5.00
Worked out the 24V Electrical System
Details
       

 06-24-2012
30.00
90% Complete with the Installation of MLG controll
Details
       

 04-28-2012
8.00
Installed Relays 1 through 5
Details
       

 04-28-2012
3.00
Installed Circuit Breakers and Switches
Details
       

 04-07-2012
2.00
Wired and Installed R6 Relay
Details
       

 03-11-2012
3.00
Wired Hyd PSI Gages
Details
       

 02-11-2012
1.50
Painted and Installed the Master Switch Relay
Details
       

 02-05-2012
2.00
Installed Click bond to mount Master switch Relay
Details
       

 01-28-2012
4.00
Continued Wiring for MLG
Details
       

 01-22-2012
4.00
Installed Relays and Started Wiring
Details
       

 01-21-2012
2.00
Installed Clickbond fasteners for MLG Controller R