BEZJet Build
BEZJet
Electrical
Work Logs Found:
11
Category Work Time:
64 Hours
Date
Hours
Work Log Summary
Details
05-06-2017
5.00
Worked out the 24V Electrical System
Details
06-24-2012
30.00
90% Complete with the Installation of MLG controll
Details
04-28-2012
8.00
Installed Relays 1 through 5
Details
04-28-2012
3.00
Installed Circuit Breakers and Switches
Details
04-07-2012
2.00
Wired and Installed R6 Relay
Details
03-11-2012
3.00
Wired Hyd PSI Gages
Details
02-11-2012
1.50
Painted and Installed the Master Switch Relay
Details
02-05-2012
2.00
Installed Click bond to mount Master switch Relay
Details
01-28-2012
4.00
Continued Wiring for MLG
Details
01-22-2012
4.00
Installed Relays and Started Wiring
Details
01-21-2012
2.00
Installed Clickbond fasteners for MLG Controller R
Details
SITE NAVIGATION
Contact Builder
BEZJet Home
Category
# Logs
# Hours
All
284
1426
Aileron
4
8
Antenna
2
4
Brakes
3
18
Canopy
29
211
Cockpit
15
46
Electrical
11
64
Engine
9
85
Firewall
3
5
Flight Controls
6
9
Fuel Sump
1
2
Fuel System
18
41
Fuselage
40
340
Intake
13
99
Miscellaneous
3
17
MLG
17
50
Motor Mount
2
52
Nose
2
8
Nose Landing Gear
5
16
Rudder
16
44
Speed Brake
1
3
Strakes
42
168
Winglet
38
110
Wings
4
26
Copyright © 2001-2024 Matronics. All Rights Reserved.