KitLog pro

Powered By Kitlog Pro v2.0

Daves Sonex Web Site
Work Logs Found: 47
Category Work Time: 103 Hours
 Date
Hours
Work Log Summary

Details

 09-08-2019
1.00
Create a bracket and install aHalon fire extinguis
Details
     

 03-05-2019
3.50
Affixed a light weight fabric to the baggage compa
Details
       

 03-04-2019
3.50
Made a back wall in the baggage compartment.
Details
       

 02-03-2018
1.00
Clecoed storage compartment into position.
Details
       

 02-02-2018
3.50
Designed and built a storage compartment in the ba
Details
       

 01-30-2018
4.00
Build a cover around the elevator Push Pull tube.
Details
     

 01-23-2018
2.25
Install a shelf for the emergency transponder.
Details
     

 06-08-2016
0.75
Install tail skid
Details
     

 04-25-2012
2.25
Rivet the tail cone assembly.
Details
       

 04-24-2012
7.25
Final deburring and start re-assembly.
Details
       

 04-23-2012
6.00
Finish drilling formers, clips and splice plates.
Details
       

 04-08-2012
3.25
Flip aft fuselage to work on tail cone.
Details
       

 04-04-2012
4.00
Aft Fuselage, Tail Cone
Details
       

 02-21-2012
1.00
Position, drill and cleco shoulder harness web bra
Details
       

 02-18-2012
4.67
Pilot drill upper and lower cross ties. Aft shear
Details
       

 02-15-2012
4.00
Continue to level and square aft fuselage.
Details
       

 02-12-2012
2.00
Study plans and attach floor skin to aft fuselage
Details
       

 02-11-2012
1.50
F22.
Details
       

 02-10-2012
0.01
Lower my build table.
Details
       

 02-09-2012
0.50
Starting to position and clamp fuselage parts toge
Details
       

 02-09-2012
1.50
Make aft bulkhead from .032 al plate.
Details
       

 02-09-2012
0.01
Finished aft fuselage rear bulkhead.
Details
       

 02-07-2012
2.00
Finished more F23 aft fuselage parts.
Details
 

 02-06-2012
2.00
Build more aft fuselage parts.
Details
     

 02-04-2012
2.00
Bulid Cross Tie Box
Details
       

 02-02-2012
2.50
Make cross ties for aft fuselage.
Details
     

 02-01-2012
1.00
Start cross ties and cross tie box.
Details
       

 02-01-2012
2.25
Attached fairleads to vertical channel.
Details
       

 01-31-2012
2.25
Install rudder stop plates. Rivet aft fuselage ski
Details
       

 01-28-2012
1.00
Setup rack to position work on aft skins.
Details
       

 01-28-2012
2.50
Drill right aft fuselage skin vertical zees.
Details
       

 01-27-2012
1.00
Drilled and clecoed left and right uper and lower
Details
       

 01-22-2012
0.83
Fix position of Horizontal and Vertical splice pla
Details
       

 01-21-2012
2.00
Drill holes, install nut plates for access hole.
Details
       

 01-18-2012
1.17
Cut access hole in left fuselage.
Details
       

 01-18-2012
1.17
Clamped and drilled, clecoed left upper and lower
Details
     

 01-18-2012
1.67
Build the reinforcement ring for the access covers
Details
       

 01-17-2012
1.75
Clamped and drilled longeron to right side skin.
Details
       

 01-17-2012
0.75
Aft Fuselage longeron and skin.
Details
       

 01-15-2012
2.00
Made the fairlead blocks and drilled holes.
Details
       

 01-15-2012
1.00
Cut the rudder cable holes in left and right aft f
Details
       

 01-13-2012
3.00
Step drilled the 5/16, 3/4, and 1 inch holes in th
Details
       

 01-13-2012
3.25
Bend the aft fuselage splice plates per plans.
Details
       

 01-11-2012
3.00
Finished F26 extruded al splice plates.
Details
       

 01-09-2012
1.00
Cut top and bottom longerons for rear fuselage.
Details
       

 01-07-2012
3.25
Build more vertical channel.
Details
     

 01-03-2012
1.25
Build SNX F27-01 right and left vertical channel.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.