Barrys RV-9A Project
Work Logs Found: 49
Category Work Time: 156 Hours
 Date
Hours
Work Log Summary

Details

 04-06-2013
4.50
Finished fixing servos. Cleaned up wiring.

 04-04-2013
1.50
Finialized autopilot wiring.

 04-03-2013
2.00
Finialized autopilot wiring.

 03-30-2013
7.00
Wiring work.

 03-25-2013
5.25
Troubleshooting wiring. Started fitting interior.

 03-23-2013
4.00
Aligned control surfaces. Final plenum fitting. Wo

 03-18-2013
1.75
Wiring work.

 03-17-2013
2.50
Wiring work,. Final installation of the canopy

 03-16-2013
5.00
Diagnosing wiring issues. Installed luggage carpet

 03-12-2013
2.25
Misc. wiring.

 03-09-2013
5.00
Misc. wiring work.

 03-06-2013
2.75
Misc. wiring work.

 03-05-2013
2.75
Diagnosing servo wiring issue.

 03-04-2013
2.25
Misc. wiring.

 03-02-2013
7.25
Panel wiring with Isaac.

 03-01-2013
3.50
Panel wiring with Isaac.

 02-09-2013
8.00
Helped Isaac and Chad with wiring.

 02-08-2013
4.00
Misc wiring.

 02-06-2013
3.00
Misc. wiring

 02-05-2013
2.25
Installed Advanced Flight Systems GPS puck on glar

 02-02-2013
11.00
Worked on wiring with Isaac

 01-19-2013
4.00
Installed antenna and ran PTT wires to the stick.

 01-16-2013
3.00
Wiring work.

 01-15-2013
2.75
Misc. wiring work.

 01-14-2013
2.00
Installed replacement AHRS unit.

 12-12-2012
1.00
Installed wing tip lights

 12-03-2012
0.75
Installed tail light.

 11-20-2012
4.00
Wiring work with Joel.

 11-19-2012
3.00
Wiring work with Joel.

 11-17-2012
3.00
Wiring panel with Joel.

 07-14-2012
4.50
Ran the main EFIS wiring harness through the firew

 06-16-2012
2.00
Misc wiring work

 04-08-2012
2.00
Ran ELT antenna wires. Started the bracket for the

 04-06-2012
3.00
Interior wiring runs.

 04-05-2012
1.75
Installed the headphone jacks in the aft part of t

 04-04-2012
1.75
finished installing Adel clamps on the forward fir

 04-01-2012
2.50
Ran the staic air tubing from aft forward to under

 03-31-2012
3.50
Joel came by today and we worked on the forward fi

 03-28-2012
2.00
Worked on running wires in the forward firewall ar

 03-26-2012
2.25
Ran wiring harnesses in the wing and fusalage for

 03-25-2012
3.00
Assemble wiring harnesses for the auto pilot servo

 03-24-2012
3.00
Assembled wiring harnesses for the autopilot servo

 03-23-2012
2.00
Ran wires aft for the rear directional light on th

 03-21-2012
0.75
Cleaned up wire tie mounts in the fusalage

 03-20-2012
1.50
Installed plastic wire tie mounts in the fusalage

 03-19-2012
2.50
Drilled fusalage bulkheads to install plastic grom

 03-18-2012
3.00
Installed ADSB antenna wires

 03-17-2012
2.00
Installed wire tie mounts ADSB, and grommets to ru

 01-09-2012
1.75
Installed flexible conduit and brackets under the