Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
S-19
Aft fuselage
Work Logs Found:
21
Category Work Time:
108 Hours
Date
Hours
Work Log Summary
Details
08-11-2010
2.00
Stinger
Details
08-10-2010
4.00
Stinger
Details
08-09-2010
7.00
Stinger
Details
08-07-2010
5.00
Hung and riged stabilator
Details
05-03-2009
6.00
Joining tailcone to mid section
Details
05-02-2009
7.00
Trim servo, top skins
Details
05-01-2009
6.00
Fuselage
Details
04-30-2009
5.00
Bellcrank channel,push pull tube and trim tube
Details
04-29-2009
5.50
#5,#4 bulkhead and bellcrank chanel
Details
04-28-2009
6.00
Riveted tailcone
Details
04-27-2009
1.00
Dirlled holes and primed
Details
04-26-2009
7.00
Deburring priming and assembly
Details
04-25-2009
6.00
Priming and deburring
Details
04-13-2009
6.00
Tailcone top skins
Details
04-12-2009
5.00
Longerons, aft bulkhead closeout
Details
04-04-2009
5.00
Vertical stab
Details
04-03-2009
5.00
#5 bulkhead and tailcone
Details
04-02-2009
5.00
Bulkhead #5
Details
04-01-2009
5.00
Bent side skins and built up tailcone
Details
03-31-2009
4.00
Edge polishing
Details
03-30-2009
5.00
Tailcone bottom
Details
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
408
1515
Aft fuselage
21
108
Aft Fuselage
2
9
Avionics
34
138
Canopy
16
72
Center Fuselage
32
130
Construction Tips
6
Cowling
5
21
Empennage
1
1
Engine
31
90
Fuel tanks
9
24
Fuselage
32
130
Fuselage
43
172
FWD Fuselage
27
102
HorizontalStabilizer
15
68
Inspections
2
9
Instrument Panel
1
Interior
2
8
Miscellaneous
4
4
Painting
5
6
Phase I flight test
16
22
Rudder
6
18
Vertical Stabilizer
10
28
Wheel Pants
2
23
Wings
85
326
Workshop
1
6
Copyright © 2001-2024 Matronics. All Rights Reserved.