KitLog pro

Powered By Kitlog Pro v2.0

Pete's RV-8 Web Site
Work Logs Found: 55
Category Work Time: 145 Hours
 Date
Hours
Work Log Summary

Details

 04-12-2017
1.00
Fire sleeve for starter cable
Details
       

 09-14-2016
1.00
Pmag diode circuit for tachometer voltage
Details
     

 08-24-2016
8.00
FWF wiring
Details
       

 07-22-2016
1.00
Blast tubes for mags and fuel pump
Details
       

 07-21-2016
1.00
Alternator blast tube
Details
       

 07-20-2016
2.00
Sniffle valve and drain tube
Details
       

 07-19-2016
2.00
Alternate air inlet control cable
Details
       

 07-12-2016
2.00
Thtottle quadrant, arrm, and tubing protection
Details
       

 06-27-2016
3.00
Forward baggage door fit
Details
       

 06-17-2016
3.00
Rubber seals air intakes
Details
       

 06-10-2016
3.00
Rubber seals forward baffle plates
Details
       

 06-09-2016
4.00
More rubber baffle seals
Details
       

 05-03-2016
3.00
Rubber seals on rear baffle
Details
       

 05-02-2016
3.00
Rubber seals on side baffles
Details
       

 05-02-2016
1.50
Rubber seals
Details
       

 05-01-2016
2.00
Snorkel alternate air vlave
Details
       

 04-08-2016
4.00
Port inlet ramp modification
Details
       

 04-07-2016
8.00
Snorkel inlet mod
Details
       

 04-06-2016
2.00
Snorkel modification
Details
       

 03-14-2016
0.50
Throttle body-snorkel positioning plug
Details
     

 03-09-2016
0.00
More baffle work and snorkel
Details
       

 02-27-2016
2.00
Cowl inlet strips (to anchor rubber seals)
Details
       

 02-22-2016
0.00
Inlet ramps with gussets and cowl
Details
       

 02-21-2016
4.00
Inlet ramps and conical gussets
Details
       

 02-08-2016
7.00
Forward inlet ramps
Details
       

 02-07-2016
4.00
Starboard aft corner of the baffle assembly
Details
       

 02-03-2016
6.00
Riveted the port rear baffle assembly together
Details
       

 02-02-2016
6.00
Continued work on port side aft baffle
Details

 02-01-2016
5.00
Port aft baffle components
Details
       

 01-31-2016
6.00
Worked on rear cooling baffle
Details
       

 06-12-2014
3.00
Installed heater cuff
Details
     

 06-10-2014
1.00
Fabricate & install exhaust pipe brackets - Part 2
Details
       

 06-10-2014
4.00
Fabricate & install exhaust pipe brackets - Part 1
Details
       

 01-23-2014
0.00
New Hartzell propeller
Details
     

 12-10-2013
3.00
Test fitting new intake pipes
Details
       

 11-06-2013
4.00
Baffle fabrication - part 3
Details
       

 11-02-2013
4.00
Baffle fabrication - part 2
Details
       

 10-31-2013
3.00
Baffle fabrication - part 1
Details
       

 10-30-2013
1.00
Cylinder head temperature sensors
Details
     

 10-26-2013
2.00
Exhaust and intake tube problem
Details
       

 10-25-2013
1.00
Vacuum and oil lines
Details

 10-24-2013
2.00
Fuel drain tube
Details
     

 10-23-2013
2.00
Oil fittings, sensors, and breather
Details
       

 10-21-2013
3.00
Install prop governor
Details
       

 10-16-2013
3.00
Fuel system
Details
       

 10-15-2013
1.00
Moved the firewall sensor manifold
Details
     

 10-14-2013
12.00
Hanging the engine
Details
       

 08-05-2013
1.00
Engine delivered to workshop
Details
       

 08-03-2013
0.00
Engine run on test stand
Details
     

 07-24-2013
0.00
Engine Assembly
Details
       

 04-16-2013
0.00
P-Mag electronic ignition
Details
     

 04-10-2013
0.00
Skytec starter config and order
Details
     

 04-10-2013
0.00
Firewall forward kit
Details

 04-08-2013
0.00
Engine configuration & order
Details

 12-15-2011
0.00
Engine research
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.