Powered By Kitlog Pro v2.0
Pete's RV-8 Web Site
RV-8
Engine
Work Logs Found:
55
Category Work Time:
145 Hours
Date
Hours
Work Log Summary
Details
04-12-2017
1.00
Fire sleeve for starter cable
Details
09-14-2016
1.00
Pmag diode circuit for tachometer voltage
Details
08-24-2016
8.00
FWF wiring
Details
07-22-2016
1.00
Blast tubes for mags and fuel pump
Details
07-21-2016
1.00
Alternator blast tube
Details
07-20-2016
2.00
Sniffle valve and drain tube
Details
07-19-2016
2.00
Alternate air inlet control cable
Details
07-12-2016
2.00
Thtottle quadrant, arrm, and tubing protection
Details
06-27-2016
3.00
Forward baggage door fit
Details
06-17-2016
3.00
Rubber seals air intakes
Details
06-10-2016
3.00
Rubber seals forward baffle plates
Details
06-09-2016
4.00
More rubber baffle seals
Details
05-03-2016
3.00
Rubber seals on rear baffle
Details
05-02-2016
3.00
Rubber seals on side baffles
Details
05-02-2016
1.50
Rubber seals
Details
05-01-2016
2.00
Snorkel alternate air vlave
Details
04-08-2016
4.00
Port inlet ramp modification
Details
04-07-2016
8.00
Snorkel inlet mod
Details
04-06-2016
2.00
Snorkel modification
Details
03-14-2016
0.50
Throttle body-snorkel positioning plug
Details
03-09-2016
0.00
More baffle work and snorkel
Details
02-27-2016
2.00
Cowl inlet strips (to anchor rubber seals)
Details
02-22-2016
0.00
Inlet ramps with gussets and cowl
Details
02-21-2016
4.00
Inlet ramps and conical gussets
Details
02-08-2016
7.00
Forward inlet ramps
Details
02-07-2016
4.00
Starboard aft corner of the baffle assembly
Details
02-03-2016
6.00
Riveted the port rear baffle assembly together
Details
02-02-2016
6.00
Continued work on port side aft baffle
Details
02-01-2016
5.00
Port aft baffle components
Details
01-31-2016
6.00
Worked on rear cooling baffle
Details
06-12-2014
3.00
Installed heater cuff
Details
06-10-2014
1.00
Fabricate & install exhaust pipe brackets - Part 2
Details
06-10-2014
4.00
Fabricate & install exhaust pipe brackets - Part 1
Details
01-23-2014
0.00
New Hartzell propeller
Details
12-10-2013
3.00
Test fitting new intake pipes
Details
11-06-2013
4.00
Baffle fabrication - part 3
Details
11-02-2013
4.00
Baffle fabrication - part 2
Details
10-31-2013
3.00
Baffle fabrication - part 1
Details
10-30-2013
1.00
Cylinder head temperature sensors
Details
10-26-2013
2.00
Exhaust and intake tube problem
Details
10-25-2013
1.00
Vacuum and oil lines
Details
10-24-2013
2.00
Fuel drain tube
Details
10-23-2013
2.00
Oil fittings, sensors, and breather
Details
10-21-2013
3.00
Install prop governor
Details
10-16-2013
3.00
Fuel system
Details
10-15-2013
1.00
Moved the firewall sensor manifold
Details
10-14-2013
12.00
Hanging the engine
Details
08-05-2013
1.00
Engine delivered to workshop
Details
08-03-2013
0.00
Engine run on test stand
Details
07-24-2013
0.00
Engine Assembly
Details
04-16-2013
0.00
P-Mag electronic ignition
Details
04-10-2013
0.00
Skytec starter config and order
Details
04-10-2013
0.00
Firewall forward kit
Details
04-08-2013
0.00
Engine configuration & order
Details
12-15-2011
0.00
Engine research
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1127
2782
About the Builder
12
Canopy
60
198
Electrical Supplies
2
Elevators
40
79
Empennage
22
104
Engine
55
145
Finishing Kit
31
178
Fuselage
293
898
Hangar/Workshop
28
Horiz Stabilizer
33
49
Instrument Panel
22
47
Miscellaneous
103
4
Paint
15
Primer
3
Prop
5
28
Reference Material
14
Rudder
19
37
RV-8 Specifications
2
Shop Supplies
5
Software
1
Tools
27
4
Tools (Fabricated)
15
16
Training Project
5
7
Vertical Stabilizer
14
26
Wheels & Brakes
1
2
Wings
192
645
Wiring & Electrical
72
259
Workshop
36
56
Copyright © 2001-2024 Matronics. All Rights Reserved.