Powered By Kitlog Pro v2.0
Build Log
RV-9
Fuselage
Work Logs Found:
136
Category Work Time:
386 Hours
Date
Hours
Work Log Summary
Details
03-03-2013
2.00
Drilled C-661 rear slider block.
Details
03-02-2013
3.00
Rivetted battery tray ribs
Details
02-17-2013
2.00
Added nutplates for battery hold-down
Details
02-04-2013
2.00
Mounting VP-400 PDU
Details
01-31-2013
4.00
Mounting VP-400 PDU
Details
01-10-2013
1.00
Fabricated aux fuel lines.
Details
12-14-2012
3.00
Installing transfer pump and tubing
Details
12-13-2012
4.00
Fabricated doubler for transfer fuel pump
Details
12-09-2012
2.00
Reworked return fuel line
Details
12-01-2012
2.00
Continued fuel lines
Details
11-27-2012
3.00
Started routing fuel line provision for aux-tank
Details
11-17-2012
3.00
Fabricated fuel lines
Details
11-13-2012
2.00
Rivetted center cabin cover and EPU plug
Details
11-10-2012
2.00
Primed center cabin cover
Details
11-07-2012
1.00
Fitted contactors to aft left bay
Details
11-04-2012
3.00
Prepared pump cover
Details
11-02-2012
3.00
Fitted cover for fuel pump
Details
10-21-2012
4.00
Started fuel lines
Details
10-13-2012
5.00
Located and drilled holes for battery hold-down
Details
10-09-2012
1.00
Painted EPU plug
Details
10-04-2012
3.00
Rivetted ribs for avioncs bay
Details
10-02-2012
1.00
CS holes in EPU plug
Details
09-30-2012
3.00
Drilled EPU plug, cut hole in fuselage
Details
09-29-2012
3.00
Backing plate for EPU plug
Details
09-27-2012
2.00
Trimmed and sanded EPU plug
Details
09-26-2012
1.00
Deburred AntiSplat Seat Mod parts
Details
09-26-2012
1.00
Bonded EPU plug housing to doubler
Details
09-23-2012
3.00
Continued assembling avioncs shelf
Details
09-22-2012
1.00
Started assembling avionics shelf
Details
09-19-2012
3.00
Primed shelf parts; Fibreglass layup for GPU plug
Details
09-17-2012
1.00
Drilled holes for GADAHRS brace
Details
09-16-2012
3.00
Manufactured support for GADAHRS shelf
Details
09-15-2012
6.00
Drilled aft left bay
Details
09-14-2012
3.00
Drilled avionics shelf top sheet
Details
09-13-2012
2.00
Started drilling top sheet of avionics shelf
Details
09-12-2012
3.00
Continue construction of avionics shelf
Details
09-07-2012
2.00
Finished lightening holes in battery hold-down
Details
09-06-2012
3.00
Lightening holes in Battery hold-downs
Details
09-05-2012
3.00
Added third upper angle for Avionics Shelf
Details
09-04-2012
3.00
Continue manufacture Avionics Shelf
Details
09-02-2012
3.00
Fabricated GADAHRS Tray
Details
08-15-2012
5.00
Fuselage Static System
Details
08-01-2012
4.00
Primed various parts
Details
07-30-2012
6.00
Drilled attach angles for avionics ribs
Details
07-29-2012
6.00
Dimpled holes for additional shelves
Details
07-28-2012
5.00
Finished fabricating inertia reel mounting
Details
07-27-2012
4.00
Fabricated Inertia Reel Fixture
Details
07-25-2012
3.00
Continued fabricating avionics rib
Details
07-24-2012
2.00
Drilled aft avionics ribs
Details
07-21-2012
2.00
Drilled third AHRS bracket rib
Details
07-19-2012
2.00
Drilled second AHARS bracket shelf
Details
07-19-2012
1.00
Drilled RH brake cylinder holes
Details
07-18-2012
2.00
Drilled holes for brake calinder (LH)
Details
07-17-2012
2.00
Fabricated left F-6119 rudder cable link
Details
07-16-2012
2.00
Fabricated right F-6119 rudder cabel link
Details
07-15-2012
4.00
Added second AHARS rib
Details
07-14-2012
4.00
Deburred and dimpled fwd fuselage parts
Details
07-13-2012
1.00
Drilled F-7108B angle
Details
07-13-2012
3.00
Drilled and deburred F-7106 fwd top skin
Details
07-11-2012
1.00
Fitted Instrument Panel angles
Details
07-09-2012
2.00
Fitted F-7108C angle
Details
07-04-2012
1.00
Trial fit of the inertia reel bracket
Details
07-03-2012
1.00
Drilled fuel pump doubler plate
Details
07-01-2012
6.00
Finished design of Inertia Reel Mount
Details
06-30-2012
7.00
Design of Inertia Reel Mount
Details
06-24-2012
3.00
Rivetted seat backs
Details
06-23-2012
5.00
Primed and rivetted elevator pushrods
Details
06-22-2012
2.00
Primed more parts
Details
06-21-2012
2.00
Rivetted several small parts
Details
06-20-2012
3.00
Primed parts
Details
06-19-2012
3.00
Priming parts
Details
06-18-2012
3.00
Modified rudder stops for maximum rudder travel
Details
06-16-2012
0.00
Trial fit of fuel pump switch
Details
06-16-2012
5.00
Fitted elevator and rudder
Details
06-12-2012
1.00
Dimpled and screwed clamp for rudder cable tube
Details
06-10-2012
3.00
Fabricated F-782D and fitted F-7114
Details
05-30-2012
4.00
Started construction of aileron trim
Details
05-28-2012
3.00
Drilled angles for upper fwd fuselage
Details
05-27-2012
4.00
Started construction for fwd fuselage
Details
05-27-2012
3.00
Installed nutplates for seat rib access plate
Details
05-26-2012
5.00
(Temporarily) installed control system
Details
05-21-2012
1.00
Rivetting remaining nutplates for baggage and seat
Details
05-20-2012
1.00
Cut AN832-4D union for vent
Details
05-19-2012
2.00
Deburred and dimpled F-7112 skin
Details
05-18-2012
3.00
Drilled all holes on F-7112 top skin to size
Details
05-17-2012
1.00
Drilled holes in the F-766B flap angle
Details
05-15-2012
1.00
Clecko'ed forward top skin to fuselage
Details
05-13-2012
6.00
Continued work on the electric flap
Details
05-12-2012
1.00
Drilled holes for F-6111 reinforcing rib
Details
05-12-2012
2.00
Drilled and installed nutplates for F-680
Details
05-11-2012
3.00
Continued on electric flap assembly
Details
05-09-2012
2.00
Continued on electric flap assembly
Details
05-08-2012
3.00
Started on electrical flap installation
Details
05-06-2012
5.00
Continued work on F-982 center cabin cover
Details
05-05-2012
4.00
Started construction on F-982 center cabin cover
Details
05-01-2012
4.00
More nutplates for baggage floor
Details
04-29-2012
4.00
Nutplates for seat and baggage floor
Details
04-28-2012
3.00
Nutplates for seat floor
Details
03-07-2012
1.00
Test fit of seat and rudder pedals
Details
02-29-2012
2.00
Rivetted nutplates on aft seat ribs
Details
02-26-2012
1.00
Installed nutplates for tunnel cover on seat ribs
Details
02-26-2012
1.00
Drilled upper seat back angle
Details
02-26-2012
5.00
Drilled and dimpled nutplates for aft seat floor
Details
02-25-2012
2.00
Drilled right bushing and rudder pedal brace
Details
02-25-2012
5.00
Deburred all seat back components
Details
02-19-2012
6.00
Continued fabricating seat backs
Details
02-18-2012
4.00
Fabricating seat backs
Details
02-18-2012
1.00
Enlarged lightening hole in F-916 set ribs
Details
02-18-2012
1.00
Dimpled holes in F-976
Details
02-13-2012
2.00
Rivetted brake pedals
Details
02-12-2012
4.00
Drilled rudder pedal bearing blocks
Details
02-11-2012
4.00
Fabricated F-6117 brake pedals
Details
02-02-2012
1.00
Rivetted seat adjustment components to frame
Details
02-02-2012
0.00
Rivetted AHARS bracket together
Details
02-02-2012
1.00
Drilled strobe/ELT bracket
Details
02-01-2012
3.00
Primed AHARS bracket parts
Details
01-29-2012
2.00
Drilled wiring holes in F-706
Details
01-29-2012
3.00
Drilled AHARS bracket to fuselage
Details
01-28-2012
2.00
Drilled seat adjustment components
Details
01-26-2012
1.00
Fabricated elevator bellcrank spacers
Details
01-23-2012
1.00
Rivetted up elevator stop and vert. stab. attach
Details
01-18-2012
1.00
Fabricated F-635 bellcrank parts
Details
01-17-2012
25.00
Fabricated F-705K, F-705L and F-705J
Details
01-15-2012
2.00
Deburred attachment holes of VS
Details
01-14-2012
4.00
Fitted and drilled VS
Details
01-13-2012
0.00
Trimmed VS-702
Details
01-13-2012
2.00
Rivetted F-601TD brake plate
Details
01-12-2012
3.00
Drilled HS rear spar to fuselage
Details
01-10-2012
3.00
Drilled horizontal stabilizer forward attachment
Details
01-09-2012
3.00
Rivetted F-712 aft bulkhead
Details
01-08-2012
3.00
Fabricated F-601TD brake plate
Details
01-06-2012
1.00
Rivetted tail spring mount to aft bulkhead
Details
01-04-2012
3.00
Welded nutplate on WD-409
Details
01-03-2012
2.00
Drilled keeper rivets on tailspring mount
Details
01-01-2012
3.00
Drilled hole in tail spring mount for tail spring
Details
12-20-2011
2.00
Drilled fwd end of WD-409
Details
SITE NAVIGATION
RV-9 Home
Category
# Logs
# Hours
All
307
872
Canopy
8
20
Empennage
98
284
Fuselage
136
386
Miscellaneous
1
3
Wings
64
179
Copyright © 2001-2024 Matronics. All Rights Reserved.