Powered By Kitlog Pro v2.0
Bill & Brendas RV-8 QB
RV-8
Canopy
Work Logs Found:
64
Category Work Time:
162 Hours
Date
Hours
Work Log Summary
Details
10-12-2014
1.00
Removed some scratches from the aft end of the can
Details
07-13-2014
2.50
Wet sand scuff marks from outer edge of windscreen
Details
07-09-2014
1.00
Mask off the scratched area around the windscreen
Details
07-06-2014
3.00
Feather in the windscreen fairing and radius sandi
Details
07-02-2014
2.00
peel off tape suronding the windscreen
Details
07-01-2014
1.50
windscreen pure epoxy applied
Details
06-30-2014
2.00
Install pop rivits into the windscreen fairing
Details
06-27-2014
2.00
Sand primer on windscreen fairing-1
Details
06-26-2014
1.50
sand windscreen inside corners and under aft lip
Details
06-25-2014
1.25
Sand a taper edge on aft upper fairing and misc
Details
06-22-2014
2.25
windscreen upper fairing aft edge final cut to fit
Details
06-18-2014
5.50
windscreen faiting sanding-8
Details
06-17-2014
5.00
windscreen fariing sanding 7
Details
06-13-2014
2.50
Windscreen fairing sanding-6
Details
06-04-2014
2.50
windscren fairing sanding-5
Details
06-03-2014
2.50
windscreen fairing sanding -4
Details
05-30-2014
1.50
Windscreen fairing sanding-3
Details
05-29-2014
5.00
windscreen fairing sanding-2
Details
05-25-2014
4.50
windscreen fairing sanding -1
Details
05-24-2014
2.00
windscreen fairing 4...cake icing
Details
05-21-2014
2.50
Windscreen fairing-3
Details
05-21-2014
0.75
Canopy skirt sanding left side
Details
05-20-2014
3.00
windscreen fairing-2
Details
05-19-2014
4.50
windscreen fairing-1
Details
05-16-2014
5.00
windscreen5-final screws install, gap sanding, mas
Details
05-15-2014
5.00
Windscreen-4 masking off and prep for fairing
Details
05-14-2014
0.50
widscreen -3
Details
05-12-2014
3.50
windscreen fitting -2
Details
05-11-2014
2.50
Fitting windscreen to canopy and rollbar-1
Details
08-23-2013
0.75
Redo two rivits in front canopy bow and spacer
Details
08-22-2013
1.50
Prep and rivit the canopy front bow
Details
08-19-2013
2.00
Rivit canopy and canopy skirt to frame
Details
08-18-2013
2.25
canopy removal and prep to receive skirts
Details
08-15-2013
1.25
Canopy handle and latch lever trim
Details
08-12-2013
1.50
Drill Canoopy frame rollers and install canopy sto
Details
08-12-2013
0.00
canopy stop drilling
Details
08-11-2013
0.75
Mid position canopy stop
Details
08-10-2012
1.50
skirts-12 (aprox) and trim canopy front edge again
Details
07-02-2012
3.00
Canopy skirt left side drilling-2
Details
07-01-2012
1.50
Canopy left side skirt drilling-1
Details
06-30-2012
3.75
Skirt templates and initial fitting left side
Details
06-19-2012
4.00
Final drilling of canopy and frame- Temp attach ca
Details
06-18-2012
5.00
canopy bottom edge final cut and polish, Frame dri
Details
06-16-2012
0.60
Canopy misc.
Details
06-14-2012
5.50
Drill canopy to frame-1
Details
06-11-2012
4.00
Fit and trim canopy to frame and aft bow-1
Details
06-10-2012
3.00
Canopy cut session 5-The Big Cut!
Details
06-09-2012
3.50
canopy cut and fit -4
Details
06-04-2012
0.50
dwg 44 detail A and chapter 9-2
Details
06-04-2012
1.75
Canopy cutting-3 and trim the front skin for clear
Details
05-30-2012
5.00
Canopy cutting-2
Details
05-27-2012
3.00
canopy cutting-1
Details
05-26-2012
2.50
Drill anchor block to F807. Prep for canopy cuttin
Details
01-07-2012
2.50
Finish slider block and drill fwd most screw hole
Details
01-05-2012
1.50
Canopy center rail slider block redo
Details
01-02-2012
4.00
Canopy side rails-final drilling
Details
12-30-2011
3.50
Canopy frame fitting and drill side rails
Details
12-25-2011
1.50
canopy frame bending-1
Details
12-24-2011
1.50
Canopy center slide block fitted and drilled-1
Details
12-24-2011
3.00
canopy center rail final, fit side rails
Details
12-22-2011
2.00
center slide rail-4
Details
12-18-2011
0.50
canopy slide-3
Details
12-17-2011
0.75
canopy slide-2
Details
12-16-2011
5.00
Canopy slide spacer and cap 1
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1040
2332
baffles
37
97
brake system
16
23
Canopy
64
162
Canopy skirt
47
75
Canopy/windscreen
64
162
cowling
58
130
electical-FWF
4
3
Electrical-cockpit
12
16
Elevators
20
63
Empennage
11
28
Engine
20
41
Exterior lights and
6
8
FAB
16
36
Fiberglass fairings
9
8
Fiberglass tips
46
68
Firewall Forward
46
90
Fuselage
136
329
Horizontal Stabilize
15
68
interior cushions an
3
8
Inventory
8
19
jigs, cradles, stand
6
15
Kit arrival
7
6
labels and plackards
2
3
Landing gear
17
40
Lights
12
28
Miscellaneous
56
96
None
1
1
Panel
40
78
paperwork
2
4
phase one tests
4
Practice kit
6
23
practice kit or tria
1
2
Prop
12
29
Propeller/Spinner
12
29
Rudder
16
43
Seats and floors
7
31
Tools
1
1
Vertical Stabilizer
8
18
weight and balance
3
8
Wing Fit/install
27
76
Wing Fitting
27
76
wing tip lights and
5
16
Wing Tips
7
20
Wings
43
123
Wire work
22
27
Wiring behind panel
34
63
wiring-cabin
24
42
Copyright © 2001-2024 Matronics. All Rights Reserved.