KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
Work Logs Found: 56
Category Work Time: 96 Hours
 Date
Hours
Work Log Summary

Details

 04-25-2015
0.00
air dams and tailwheel adjust and repair
Details
       

 04-01-2015
2.00
Hose added to gascolator drain
Details
       

 03-15-2015
3.00
Fix some items suggested by DAR
Details
       

 03-14-2015
2.00
re-assembly-1 after AW inspection
Details

 03-11-2015
1.50
re install the fwd floor and seat pan for inspecti
Details

 03-09-2015
1.00
Transponder certification and other
Details

 02-14-2015
4.00
Prep for DAR visit
Details
       

 02-09-2015
1.00
Data plate engraved and positioned on plane
Details
       

 01-22-2015
1.50
Cabin heat intake port redone
Details
     

 01-13-2015
2.00
Fuel calibration 2
Details
     

 01-12-2015
3.00
Fuel gauge calibration
Details
       

 12-21-2014
2.00
Reverse pitch control and clean up
Details
       

 12-16-2014
0.75
radio and trutrak adjustments
Details

 12-15-2014
1.50
Dynon EMS checklists enetered and uploaded to devi
Details

 12-14-2014
0.25
engine run 4 and 5
Details
       

 12-12-2014
0.25
Engine start three and first taxi test
Details
     

 11-30-2014
0.75
change ems setting for rpm indicator
Details
     

 11-28-2014
0.50
fuel cap tool
Details
     

 11-18-2014
0.00
cowl hinge pin covers new plan
Details
     

 11-17-2014
0.50
RT TANK FUEL FLOW AND LEAK TESTING CHECKED
Details

 11-16-2014
1.00
Retest wig wag and reinstall the rt lwr consoe
Details

 11-16-2014
0.75
Fuel testing rt wing-1
Details
     

 11-14-2014
1.50
Fuel testing left tank-1
Details
       

 11-13-2014
3.00
Left flap scratch removal and re install and other
Details
       

 11-12-2014
4.00
weight and balance-2 and other
Details
       

 11-05-2014
0.75
eye bolts added to rudder horm
Details
       

 10-12-2014
0.75
Apply N numbers to VS
Details
       

 10-08-2014
1.00
Plugs for inside fuse and gather plans and organiz
Details
       

 08-23-2014
1.00
finished polishing the exhaust tips and sand and p
Details
     

 08-14-2014
1.00
Gas caps marked
Details
       

 08-12-2014
1.50
Gas caps and various
Details
     

 08-11-2014
2.00
Attach tail wheel swag chains, polish gas caps, se
Details
       

 07-25-2014
2.50
Some assembly and various tasks
Details
       

 07-24-2014
3.50
Fuel lines torqued, Front seat pan and belts, cons
Details
       

 07-15-2014
3.00
Preperations for wing install
Details
       

 07-13-2014
1.00
Alter rear stick grip for better clearence
Details
     

 04-19-2014
2.00
Fix OAT probe wiring and install nd probe
Details
       

 04-17-2014
4.00
Dynon EMS firmare update and misc wiring fix
Details
       

 04-14-2014
2.00
replace master switch and relay
Details
       

 04-14-2014
3.00
panel install and rear throttle knob and engine co
Details
       

 04-08-2014
6.00
Firmware update try-2 and wiring redo.
Details
     

 04-02-2014
0.75
Seat cushions and panels test fited
Details
       

 03-20-2014
0.75
bleeding brakes and securing parking brake
Details

 01-18-2014
2.00
Drain and redo master brake cylinder fittings
Details
     

 11-19-2013
1.00
Fabricate engine dryer for the new lycoming
Details
     

 11-11-2013
1.00
adjust cabin heat cable length and access door scr
Details
       

 10-08-2013
1.00
Shop cleaning, sorting electrical supplies, organi
Details

 09-30-2013
1.00
Basic test of panel wiring
Details
     

 09-07-2013
0.50
Plan for switch location and CB amp requirement re
Details
       

 08-19-2013
1.00
Clean inside belly of fuselage
Details

 10-10-2012
2.00
test template for map lights
Details
       

 04-26-2012
2.50
Redo the 696 mount bracket, the rudder leading edg
Details
       

 03-17-2012
1.00
Counterweight repair, ASI repair-1
Details
       

 03-09-2012
4.50
Misc. Servo mount adjust and safety wire etc
Details
       

 02-27-2012
3.25
rivits in side skin, tank bracket, fuel line marke
Details
       

 12-03-2011
1.00
panel templates for steam gauges and dynon made
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.