KitLog pro

Powered By Kitlog Pro v2.0

Shirleys Web Site
Work Logs Found: 66
Category Work Time: 287 Hours
 Date
Hours
Work Log Summary

Details

 08-26-2014
0.50
ADHARs stiffener
Details

 08-25-2014
0.50
ADHARS stiffener mod
Details

 11-29-2013
4.00
Completed 31B, started 32
Details

 11-27-2013
2.00
Installed wireways
Details

 11-26-2013
4.00
Wiring harness
Details

 09-28-2013
1.00
Reed switches
Details

 09-03-2013
8.00
Firewall stiffener mod
Details
       

 04-27-2013
1.00
SB Oil Tank Mount Brackets
Details

 04-06-2013
5.00
Installed side skin doublers
Details

 04-05-2013
5.00
Main gear leg upgrade - side skin doublers
Details

 07-25-2012
2.00
Wiring harnesses
Details

 07-23-2012
1.00
OAT
Details

 06-26-2012
5.00
SkyView update
Details

 06-24-2012
1.00
Skyview Update
Details

 06-22-2012
4.00
Wing wiring upgrade
Details

 06-18-2012
3.00
Installing tunnel harness
Details

 04-19-2012
2.00
Vertical Stabilator
Details

 04-18-2012
3.00
Pushrods
Details

 04-17-2012
6.00
Roll bar installation
Details
       

 04-16-2012
6.00
Map box
Details

 04-15-2012
6.00
Instrument panel attach flanges
Details
       

 04-14-2012
12.00
Upper firewall assembly and fuel lines
Details

 04-13-2012
4.50
Firewall spacers and hinges
Details

 04-12-2012
11.00
Upper firewall nutplates
Details
       

 04-11-2012
6.00
Seat backs
Details

 04-10-2012
7.00
Upper Firewall
Details

 04-09-2012
4.00
Fitted Roll Bar
Details
       

 04-08-2012
12.50
Rolll Bar
Details
 

 04-06-2012
2.00
First upholstery fitting
       

 04-05-2012
4.00
Roll Bar
Details
       

 04-03-2012
3.00
Fuel system
Details
       

 04-02-2012
5.00
Brake lines, fuel lines
Details

 04-01-2012
5.00
Side skin
Details

 03-31-2012
10.00
Side skins
Details

 03-30-2012
5.00
Side skins
Details

 03-28-2012
2.00
Vent door subassemblies
Details

 03-27-2012
9.00
Longerons, arm rests...
Details
       

 03-26-2012
8.00
Longerons
Details
     

 03-25-2012
6.00
Fwd Lower Fuse
Details
       

 03-24-2012
5.00
Fwd Lower Fuse
Details

 03-23-2012
8.00
Step installation
Details

 03-22-2012
6.00
Step attach brackets
Details

 03-21-2012
1.50
Riveting belly skin
Details
     

 03-20-2012
13.00
Corner & bottom skins
Details
       

 03-19-2012
7.00
Seat ramp floors
Details
       

 03-15-2012
1.00
Control column mount assemblies
Details
       

 03-14-2012
5.50
Control coumn baracket assemblies
Details

 03-11-2012
1.50
Spar caps and rolllers
Details

 02-16-2012
5.00
Seat floor assemblies
Details

 02-15-2012
6.00
Crotch strap brackets and seat floors
Details
       

 02-14-2012
4.00
Seat ribs
Details
     

 02-11-2012
5.00
Baggage floor area
Details

 02-09-2012
1.00
Rivet baggage floor
     

 02-08-2012
4.00
Baggage floors
Details
       

 02-07-2012
4.00
Baggage ribs
Details

 02-01-2012
2.00
Mid fuse ribs
Details

 01-31-2012
5.00
Centre Section Bulkhead completed
Details
       

 01-30-2012
4.50
Centre Section Bulkhead
Details
     

 12-29-2011
2.00
Wheels
Details
     

 10-19-2011
3.00
Installed tank baffles and rear skin
Details
       

 10-18-2011
3.00
Prosealed & riveted fwd bulkhead assembly
Details
     

 10-08-2011
1.00
Fwd bulkhead assembly
Details

 10-07-2011
0.50
Tank bracket
Details

 10-05-2011
1.00
Tank Step 4
Details

 10-04-2011
1.00
Fuel Tank Step 1
Details

 10-03-2011
0.50
Fuel tank Steps 1 and 3
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.