Powered By Kitlog Pro v2.0
Shirleys Web Site
RV12
Fuselage
Work Logs Found:
66
Category Work Time:
287 Hours
Date
Hours
Work Log Summary
Details
08-26-2014
0.50
ADHARs stiffener
Details
08-25-2014
0.50
ADHARS stiffener mod
Details
11-29-2013
4.00
Completed 31B, started 32
Details
11-27-2013
2.00
Installed wireways
Details
11-26-2013
4.00
Wiring harness
Details
09-28-2013
1.00
Reed switches
Details
09-03-2013
8.00
Firewall stiffener mod
Details
04-27-2013
1.00
SB Oil Tank Mount Brackets
Details
04-06-2013
5.00
Installed side skin doublers
Details
04-05-2013
5.00
Main gear leg upgrade - side skin doublers
Details
07-25-2012
2.00
Wiring harnesses
Details
07-23-2012
1.00
OAT
Details
06-26-2012
5.00
SkyView update
Details
06-24-2012
1.00
Skyview Update
Details
06-22-2012
4.00
Wing wiring upgrade
Details
06-18-2012
3.00
Installing tunnel harness
Details
04-19-2012
2.00
Vertical Stabilator
Details
04-18-2012
3.00
Pushrods
Details
04-17-2012
6.00
Roll bar installation
Details
04-16-2012
6.00
Map box
Details
04-15-2012
6.00
Instrument panel attach flanges
Details
04-14-2012
12.00
Upper firewall assembly and fuel lines
Details
04-13-2012
4.50
Firewall spacers and hinges
Details
04-12-2012
11.00
Upper firewall nutplates
Details
04-11-2012
6.00
Seat backs
Details
04-10-2012
7.00
Upper Firewall
Details
04-09-2012
4.00
Fitted Roll Bar
Details
04-08-2012
12.50
Rolll Bar
Details
04-06-2012
2.00
First upholstery fitting
04-05-2012
4.00
Roll Bar
Details
04-03-2012
3.00
Fuel system
Details
04-02-2012
5.00
Brake lines, fuel lines
Details
04-01-2012
5.00
Side skin
Details
03-31-2012
10.00
Side skins
Details
03-30-2012
5.00
Side skins
Details
03-28-2012
2.00
Vent door subassemblies
Details
03-27-2012
9.00
Longerons, arm rests...
Details
03-26-2012
8.00
Longerons
Details
03-25-2012
6.00
Fwd Lower Fuse
Details
03-24-2012
5.00
Fwd Lower Fuse
Details
03-23-2012
8.00
Step installation
Details
03-22-2012
6.00
Step attach brackets
Details
03-21-2012
1.50
Riveting belly skin
Details
03-20-2012
13.00
Corner & bottom skins
Details
03-19-2012
7.00
Seat ramp floors
Details
03-15-2012
1.00
Control column mount assemblies
Details
03-14-2012
5.50
Control coumn baracket assemblies
Details
03-11-2012
1.50
Spar caps and rolllers
Details
02-16-2012
5.00
Seat floor assemblies
Details
02-15-2012
6.00
Crotch strap brackets and seat floors
Details
02-14-2012
4.00
Seat ribs
Details
02-11-2012
5.00
Baggage floor area
Details
02-09-2012
1.00
Rivet baggage floor
02-08-2012
4.00
Baggage floors
Details
02-07-2012
4.00
Baggage ribs
Details
02-01-2012
2.00
Mid fuse ribs
Details
01-31-2012
5.00
Centre Section Bulkhead completed
Details
01-30-2012
4.50
Centre Section Bulkhead
Details
12-29-2011
2.00
Wheels
Details
10-19-2011
3.00
Installed tank baffles and rear skin
Details
10-18-2011
3.00
Prosealed & riveted fwd bulkhead assembly
Details
10-08-2011
1.00
Fwd bulkhead assembly
Details
10-07-2011
0.50
Tank bracket
Details
10-05-2011
1.00
Tank Step 4
Details
10-04-2011
1.00
Fuel Tank Step 1
Details
10-03-2011
0.50
Fuel tank Steps 1 and 3
Details
SITE NAVIGATION
Contact Builder
RV12 Home
Category
# Logs
# Hours
All
136
631
Avionics
2
4
Empennage
25
80
Engine
1
6
Fuselage
66
287
Paint
4
23
Tail cone
12
44
Wings
26
187
Copyright © 2001-2024 Matronics. All Rights Reserved.