Powered By Kitlog Pro v2.0
Andrews Web Site
Nexus Mustang
Wings
Work Logs Found:
110
Category Work Time:
868 Hours
Date
Hours
Work Log Summary
Details
11-14-2023
8.00
Temporary Wing Installation
Details
10-03-2023
16.00
Completed skinning the right wing
Details
09-30-2023
2.00
Completing left lower wing skins
Details
09-29-2023
6.00
Riveting the left wing lower skin
Details
09-27-2023
8.00
Adjusting access cover location
Details
09-25-2023
8.00
Riveted left lower stub sing skin
Details
09-23-2023
6.00
Left stub wing aft skin riveting
Details
09-22-2023
8.00
Stub wing routing details
Details
09-21-2023
8.00
Left stub wing LE skin riveting
Details
09-19-2023
8.00
Left wing wiring provisions
Details
09-18-2023
20.00
Left wing gap seals (flap & aileron stiffeners)
Details
09-13-2023
12.00
Moved left wing fuel tank pick-up
Details
09-08-2023
4.00
Right stub skin riveting
Details
09-05-2023
8.00
Inboard aileron pushrods
Details
09-02-2023
4.00
Wing interface seals
Details
09-01-2023
10.00
Riveting right wing top skin
Details
08-30-2023
2.00
Planning for fuel tube routing, wiring, and riveti
Details
08-30-2023
6.00
New fuel pick-up fabricated
Details
08-25-2023
8.00
Flap & aileron reinforcement
Details
08-21-2023
5.00
Fuel tank mistake
Details
08-13-2023
10.00
Inboard to outboard wing access covers
Details
08-07-2023
16.00
Fabricated access covers for lower wing
Details
07-27-2023
16.00
Drilling bottom stub wing skins
Details
07-26-2023
16.00
Fabricating left wing bottom stub wing skin
Details
07-22-2023
12.00
Fabricating aft details for stub wing top skins
Details
07-19-2023
10.00
Left wing walk fabrication
Details
07-09-2023
10.00
Fabricating the root wing skins
Details
06-22-2023
10.00
Aileron bellcrank fabrication
Details
05-18-2023
4.00
Welded aft landing gear mount
Details
05-12-2023
6.00
Tank Pressure testing
Details
05-07-2023
2.00
Left wing reinstalled
Details
05-04-2023
8.00
Final sealing of left wing tank
Details
05-03-2023
10.00
Continued sealing the left fuel tank
Details
05-02-2023
6.00
Removal of Left tank skin
Details
05-01-2023
6.00
Left fuel tank sealing day 1
Details
04-24-2023
6.00
Final sealing of the right wing tank
Details
04-23-2023
2.00
Rivets for the intermediate spar
Details
04-22-2023
3.00
Wing removal and end rib rivets
Details
04-21-2023
8.00
Day 3 of the riveting process
Details
04-20-2023
8.00
Day 2 of Right Leading edge sealing
Details
04-19-2023
8.00
Day 1 Right leading edge sealing
Details
04-17-2023
4.00
Adjustments for capacitive probe fit
Details
04-12-2023
6.00
Left wing stiffeners
Details
04-10-2023
6.00
Stiffener Sealing on Right wing leading edge
Details
04-06-2023
6.00
Additional sealing work
Details
04-05-2023
6.00
Sealing the Left Wing Spar
Details
04-04-2023
6.00
Right wing spar sealing
Details
04-03-2023
10.00
Wing pre-sealing odds and ends
Details
03-31-2023
8.00
Dimpling the wing Leading Edge Skins
Details
03-21-2023
10.00
Wing outboard Access panels and LE cleaning
Details
03-20-2023
8.00
Wing tip attachment flanges
Details
03-13-2023
6.00
Wing stub skin and fuel probe details
Details
03-09-2023
10.00
Stiffeners and access details for LH stub skin
Details
03-07-2023
12.00
LH Stub Skin Preparations
Details
02-22-2023
8.00
Mounting stub skins
Details
02-21-2023
8.00
More fitting stub wing skins
Details
02-14-2023
8.00
Inboard (stub) wing section
Details
09-16-2022
16.00
Wing Skin Drilling
Details
09-10-2022
4.00
Start fitting Right wing lower skin
Details
09-05-2022
8.00
Drilling Right wing top skin
Details
09-02-2022
10.00
Left wing leading edge details
Details
08-26-2022
12.00
Continued working leading edge drilling
Details
08-19-2022
4.00
Continued drilling wing leading edge skins
Details
08-16-2022
4.00
Trying alternative skin forming method
Details
08-11-2022
4.00
Initial holes in Right wing leading edge skin
Details
08-10-2022
6.00
Adjusting wing leading edge prebend
Details
08-09-2022
8.00
Initial fitting of leading edge wing skins
Details
08-07-2022
6.00
Prime and rivet wing rib substructure
Details
08-06-2022
6.00
Fuel pick-up fabrication
Details
08-05-2022
14.00
Seal and rivet forward wing ribs
Details
07-19-2022
6.00
Fuel probe accomodations
Details
07-09-2022
6.00
Fuel tank access cover fabrication
Details
07-06-2022
16.00
Fitting and adjusting flap torque tube
Details
07-05-2022
10.00
Finishing flap drive torque tube components
Details
07-02-2022
10.00
Flap drive fitting fabrication
Details
06-27-2022
16.00
Flap torque tube hinges
Details
06-08-2022
10.00
Fitting Flap brackets to rear spar
Details
06-07-2022
12.00
Fabricated Flap Hinge brackets
Details
06-02-2022
12.00
Wing Tie-Down Points Added to Ribs
Details
06-01-2022
4.00
Wing Rib Correction
Details
05-29-2022
8.00
Right Outbd Aileron Bracket Installation
Details
05-27-2022
6.00
Inbd Aileron Attach point Rigging
Details
05-25-2022
6.00
Aileron Attach Bracket to Bellcrank Rib Interface
Details
05-24-2022
8.00
Aileron Attach Bracket Fabrication
Details
05-23-2022
2.00
Wing Leading Edge Rivet Pattern Work
Details
05-20-2022
4.00
Wing Leading Edge Initial Fitting
Details
05-18-2022
4.00
Improving Wing Leading Edge Bend
Details
05-17-2022
4.00
Fuel Tank Acess Cover Back-up Flange
Details
05-16-2022
4.00
Left Wing Inbd Trailing Edge Fit-up
Details
05-14-2022
4.00
Fitting Right Wing Fwd 26.5 Rib
Details
05-13-2022
8.00
Left Wing Auxiliary Spar
Details
05-10-2022
15.00
Right wing details
Details
05-03-2022
8.00
Wing Rib Fittings
Details
04-27-2022
10.00
Right wing fittings
Details
04-19-2022
10.00
Continued Rib fitting and stiffener additions
Details
04-12-2022
15.00
Forward Wing Spar and Details
Details
03-02-2022
8.00
Rib Stiffener additions
Details
02-24-2022
6.00
Bl 79.5 Rib
Details
02-23-2022
15.00
Forming Wing Ribs
Details
02-09-2022
10.00
Forming Ribs
Details
02-06-2022
8.00
Wing Rib Fabrication Preparation
Details
02-01-2022
10.00
Spar work
Details
08-07-2021
10.00
Fabricating the 16.5 Ribs
Details
08-04-2021
3.00
BL:16.5 Rib
Details
01-19-2021
8.00
Aft Wing Spar Fittings & Rigging
Details
01-15-2021
4.00
Started Aft Wing Spars and Ribs
Details
10-21-2018
0.00
Picked Up Wing Rib Blanks
Details
11-27-2011
1.00
Finished Flanging dies
Details
11-26-2011
4.00
Continued building Flanging dies
Details
11-25-2011
5.00
Flanging Dies
Details
SITE NAVIGATION
Contact Builder
Nexus Mustang Home
Category
# Logs
# Hours
All
541
2944
Elevator
27
92
Empennage
87
246
Engine
2
25
Flaps and Ailerons
27
280
Flight Controls
1
20
Forming Parts
15
54
Fuselage
184
1059
Landing Gear
7
46
Miscellaneous
2
6
None
1
Part and Tool Accumu
20
57
Rudder
31
61
Tools
3
26
Wing Spar
24
104
Wings
110
868
Copyright © 2001-2024 Matronics. All Rights Reserved.