Powered By Kitlog Pro v2.0
Bens RV-10 Site (Non-Active)
RV-10
Vertical Stabilizer
Work Logs Found:
9
Category Work Time:
31 Hours
Date
Hours
Work Log Summary
Details
11-23-2011
4.00
Final assembly of the Vertical Stabilizer
Details
11-22-2011
6.00
Putting the VS Skeleton together
Details
11-21-2011
3.00
Final Assy of the VS
Details
11-13-2011
4.50
VS is ready for final assembly
Details
11-13-2011
1.00
Almost done with VS Prep
Details
11-11-2011
4.00
Vertical Stabilizer Prep Work
Details
11-10-2011
1.50
Ongoing prep
Details
11-05-2011
5.00
Continued Vertical Stabilizer
Details
10-29-2011
2.00
General VS Prep
Details
SITE NAVIGATION
RV-10 Home
Category
# Logs
# Hours
All
101
277
Education
2
20
Elevator
25
64
Empennage
2
16
Horizontal Stabilize
18
48
None
1
0
Rudder
13
30
Shop Supplies
1
1
Tailcone
27
64
Tools
3
3
Vertical Stabilizer
9
31
Copyright © 2001-2024 Matronics. All Rights Reserved.