|
|
|
|
LAAD Avion LLC
Work
Logs
Found:
29
|
Category Work Time: 104 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
02-15-2012
|
2.00
|
Aft window install, wings trial fit
|
Details
|
|
|
02-11-2012
|
5.00
|
Mate tail to fuselage,
|
Details
|
|
|
02-08-2012
|
3.50
|
Oil tank bracket, battery box, upper dash cowling
|
|
|
|
02-04-2012
|
5.00
|
Lower dash panel
|
|
|
|
02-01-2012
|
3.00
|
Strut attach angle, panel attach strap, prep work
|
|
|
|
01-29-2012
|
2.00
|
Upper firewall
|
Details
|
|
|
01-26-2012
|
3.00
|
Upper Firewall
|
|
|
|
01-23-2012
|
5.00
|
Fuel System installation
|
|
|
|
01-21-2012
|
5.50
|
Rudder Pedal Assembly, brake lines
|
|
|
|
01-17-2012
|
3.00
|
Seat Backs
|
|
|
|
01-14-2012
|
5.00
|
Bulkhead Assembly
|
|
|
|
01-11-2012
|
3.50
|
Roll Bar Assembly
|
|
|
|
01-09-2012
|
3.00
|
Install vents, lower cowl hinges
|
|
|
|
01-07-2012
|
5.00
|
Finish and rivet sideskins
|
|
|
|
01-04-2012
|
3.50
|
Side skins match drill longerons,spar cutouts
|
|
|
|
01-01-2012
|
6.00
|
Longerons, Roll bar attach plate, start side skins
|
|
|
|
12-24-2011
|
2.50
|
Tunnel assembly, engine mounts, more nut plates...
|
|
|
|
12-23-2011
|
3.50
|
Attach bulkhead,step floors,nutplates, prep tunnel
|
|
|
|
12-15-2011
|
3.00
|
Rivet bottom skin, install steps
|
|
|
|
12-14-2011
|
3.50
|
Rivet step ribs, corner skins, start on floor skin
|
|
|
|
12-11-2011
|
3.00
|
insert control column,rivet bulkhead
|
Details
|
|
|
12-10-2011
|
4.00
|
Bulkhead assembly
|
Details
|
|
|
12-07-2011
|
3.50
|
Floor assembly, bulkhead caps rollers,control moun
|
|
|
|
12-06-2011
|
3.00
|
seat ribs,seat floor assembly,trial fit
|
|
|
|
12-03-2011
|
4.00
|
Flaperon mixer arm,bracket, seat ribs assembly
|
|
|
|
11-30-2011
|
3.00
|
Baggage ribs, pulley brackets
|
|
|
|
11-27-2011
|
4.00
|
Center bulkhead, baggage floor and ribs
|
|
|
|
11-25-2011
|
3.00
|
Start Fuuselage Kit
|
|
|
|
11-22-2011
|
1.50
|
Open and inventory Fuselage Kit
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |