Powered By Kitlog Pro v2.0
Wendells RV-6A
RV-6A
Canopy
Work Logs Found:
63
Category Work Time:
190 Hours
Date
Hours
Work Log Summary
Details
11-20-2024
3.00
Install Small Koger Sunshade
Details
05-08-2016
4.00
Tape and sand forward canopy
Details
01-18-2016
4.00
Install Canopy into frame
Details
09-26-2015
0.00
Rivet rear window in place 2
Details
09-26-2015
6.00
Rivet rear window in place
Details
09-09-2015
2.00
Made two canopy guide blocks
Details
07-16-2015
3.00
Inside Forward Edge Painted Black
Details
07-15-2015
4.00
Sand and Paint Canopy Frame
Details
07-10-2015
2.00
Crack Work 3
Details
07-09-2015
1.00
Crack Work 2
Details
07-09-2015
6.00
Crack Work 1
Details
07-09-2015
0.00
Canopy Countersink 3
Details
07-09-2015
0.00
Canopy Countersink 2
Details
07-09-2015
8.00
Canopy Countersink 1
Details
07-08-2015
5.00
Countersink everything
Details
07-08-2015
4.00
Canopy Trim 14
Details
07-07-2015
3.00
Install Open/Close Hardware 2
Details
07-07-2015
2.00
Install Open/Close Hardware 1
Details
06-19-2015
5.00
Canopy Trim 13
Details
06-15-2015
3.00
Canopy Trim 12
Details
06-12-2015
2.00
Canopy Trim 11
Details
06-12-2015
5.00
Canopy Trim 10
Details
06-07-2015
0.00
Canopy Trim 9B
Details
06-07-2015
0.00
Canopy Trim 9A
Details
06-07-2015
0.00
Canopy Trim 9
Details
06-07-2015
4.00
Canopy Trim 8
Details
06-04-2015
4.00
Canopy Trim 7
Details
06-04-2015
0.00
Canopy Trim 6
Details
06-04-2015
6.00
Canopy Trim 5
Details
05-26-2015
0.00
Canopy Trim 4
Details
05-26-2015
0.00
Canopy Trim 3
Details
05-26-2015
0.00
Canopy Trim 2
Details
05-26-2015
6.00
Canopy Trim 1
Details
04-16-2015
0.00
Canopy Fitting 3 - Preparations
Details
04-16-2015
0.00
Canopy Fitting 2 - Preparations
Details
04-16-2015
2.00
Canopy Fitting 1 - Preparations
Details
01-13-2013
3.00
Canopy 3 Try Air Grinder Cutoff Wheel.
Details
01-10-2013
3.00
Canopy 2 Try different techniques
Details
10-18-2012
2.00
Canopy 1
Details
10-11-2012
1.00
Canopy Frame 19 - Skin riveted on
Details
10-10-2012
3.00
Canopy Frame 18 - Apply finish paint
Details
10-08-2012
4.00
Canopy Frame 17 - Prime all frame parts
Details
09-24-2012
4.00
Canopy Frame 16 Flush Fit the Canopy Skin
Details
09-08-2012
4.00
Canopy Frame 15- Finish Drilling the Glare Shield
Details
09-05-2012
2.00
Canopy Frame 14- Trim Canopy Skin more.
Details
09-04-2012
6.00
Canopy Frame 13 - Strut installation
Details
09-01-2012
6.00
Canopy Frame 12 - More Fwd Skin Trimming
Details
08-28-2012
8.00
Canopy Frame 11 - Reinforcement Kit
Details
08-24-2012
6.00
Canopy Frame 10 - Fix hinge arm problem..
Details
08-13-2012
4.00
Canopy Frame 9 - Another Fix Required
Details
07-31-2012
1.00
Canopy Frame 8
Details
07-31-2012
2.00
Canopy Frame 7 - Reinforcement kit.
Details
07-24-2012
5.00
Canopy Frame 6 - Side frame fitted
Details
07-23-2012
6.00
Canopy Frame 5
Details
06-20-2012
3.00
Fabricated Forward Canopy Stops
Details
06-19-2012
6.00
Made Canopy Lift Strut Hardware
Details
06-18-2012
6.00
Drilled Canopy Hinges
Details
06-15-2012
0.00
Canopy Frame 4
Details
06-15-2012
2.00
Canopy Frame 3 - Check clearances everywhere
Details
06-15-2012
2.00
Canopy Frame 2 - Begin Fitting Forward Canopy Fram
Details
06-15-2012
2.00
Canopy Frame 1 - Rough fit the forward canopy tip
Details
11-19-2011
2.00
Install Canopy Latch
Details
11-18-2011
3.00
Prepare the Tip Up Canopy Latch
Details
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
728
2403
Ailerons
22
72
Avionics
35
156
Canopy
63
190
Controls
24
82
Cowling
21
94
Electrical
44
183
Empennage
30
115
Engine
70
184
Firewall
11
32
Flaps
33
125
Fuselage
144
503
Gear
15
57
Miscellaneous
1
Move the Kit to FL
3
4
Panel
29
86
Prop
5
10
Smoke
7
14
Tools
3
5
Vans Training Kit
6
9
Videos
2
Wings
160
482
Copyright © 2001-2024 Matronics. All Rights Reserved.