KitLog pro

Powered By Kitlog Pro v2.0

Swinnys 4 Place Bush Explorer
Work Logs Found: 9
Category Work Time: 37 Hours
 Date
Hours
Work Log Summary

Details

 11-23-2011
5.00
Elevator & Horizontal Stab tips
Details
       

 11-21-2011
4.00
Skinning the left side elevator
Details
       

 11-21-2011
3.00
Forming tips to elevator & horizontal stab.
Details
       

 11-19-2011
6.00
A stich in time saves ............
Details
       

 11-18-2011
3.00
Prep of right side elevator for riveting.
Details
       

 11-17-2011
4.00
Skinning right elevator
Details
       

 11-16-2011
4.00
Elevator frames fully assembled.
Details
       

 11-15-2011
5.00
Set out of the elevator spar and ribs
Details
       

 11-12-2011
3.00
Elevator framework
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.