Powered By Kitlog Pro v2.0
Mike & Aneta's RV Projects
RV-10
Elevators
Work Logs Found:
22
Category Work Time:
107 Hours
Date
Hours
Work Log Summary
Details
02-20-2012
3.00
Riveted Leading Edges & Elevators are Complete!
Details
02-19-2012
4.00
Installing counterweights and trim tabs
Details
02-18-2012
5.00
Riveting the other Elevator
Details
02-12-2012
6.00
Prosealing the other elevator and trim tabs
Details
02-11-2012
8.00
Elevator TE Riveting & Counterweights
Details
02-05-2012
6.00
Elevator Trim Tabs
Details
02-04-2012
4.00
Pro-Sealing Elevator Trailing Edges
Details
01-28-2012
8.00
Riveting the Elevators
Details
01-24-2012
3.00
Riveting elevator skins to rear spars
Details
01-22-2012
7.00
Riveting the Elevators
Details
01-21-2012
6.00
Riveting the Elevators
Details
01-15-2012
3.00
Prepping the Elevator Skins
Details
01-14-2012
3.00
Dimpling and Countersinking Elevator Ribs
Details
12-06-2011
2.00
Dimpling Elevator Ribs
Details
12-04-2011
5.00
Dimpling and Countersinking Elevator Parts
Details
12-03-2011
6.00
Deburring and Drilling Steel Angle
Details
11-25-2011
3.00
Trim Cable Anchors for Elevators
Details
11-22-2011
3.00
Match-drilling the Right Elevator
Details
11-20-2011
3.00
Match-drilling the Right Elevator
Details
11-19-2011
8.00
Match-drilling Elevator Skins
Details
11-13-2011
8.00
Assembling and Match-drilling Ribs and Spars
Details
11-11-2011
3.00
Cutting & Trimming Elevator Ribs
Details
SITE NAVIGATION
Contact Builder
F-14 Top Cat Home
RV-3B Home
RV-10 Home
Category
# Logs
# Hours
All
662
2548
"The Back Story"
18
3
Elevators
22
107
Empennage
15
53
Fuel Tanks
84
332
Fuselage
222
724
Horizontal Stabilzer
16
63
Options
41
136
Primer & Paint
4
37
Rudder
15
50
Shop
30
223
Tailcone
27
108
Tools
3
5
Training
23
132
Upholstery
4
18
Vertical Stabilizer
20
81
Wings
118
476
Copyright © 2001-2024 Matronics. All Rights Reserved.