Sonex 825 build log
Work Logs Found: 25
Category Work Time: 72 Hours
 Date
Hours
Work Log Summary

Details

 01-02-2012
1.00
Adjust tail fairing
Details
     

 12-06-2011
2.00
TAIL IS DONE!!
Details
       

 12-05-2011
2.00
Tail fairing brackets
Details
       

 12-04-2011
2.00
Tail filing for rudder and fairing cuts
Details
     

 11-30-2011
5.00
Permanently mounted the tail
Details
       

 11-29-2011
0.50
Paper outline of tail fairing done.
Details

 11-28-2011
2.50
Rear channel riveted and no warp!
Details

 11-27-2011
3.00
Vertical tail drilled and a small oddity
Details
       

 11-27-2011
1.00
side warp fix (possibly)
Details
     

 11-25-2011
5.00
Horizontal Stab bolting, vertical mock up
Details
       

 11-19-2011
1.00
Tail is done, now on to the fuselage
Details

 11-18-2011
2.00
Final stab hinge location
Details
       

 11-15-2011
2.00
Adjusting elevator hinge and fitting tail
Details
       

 11-14-2011
1.50
Tail tips and horizontal stab skin
Details
       

 11-13-2011
4.00
Skinned left stab and rigged elevators
Details
       

 11-12-2011
6.00
Elevators start to finish
Details
       

 11-11-2011
8.00
Skinned right horizontal stab and started elevetor
       

 11-10-2011
5.00
Horizontal Stab spars done and mock up
Details
       

 11-09-2011
4.00
Horizontal Stab spars
Details
     

 11-08-2011
3.00
Horizontal Stab ribs and angles
       

 11-07-2011
1.00
T04 is done man!
     

 11-04-2011
1.50
Horizontal Stab small rib
       

 11-03-2011
2.50
Control Horn and Skins
Details
       

 11-02-2011
3.00
Elevator control horn
Details
       

 11-01-2011
3.00
Parts prep and inventory
Details
     