|
|
|
|
ROBERT'S WEB SITE
Work
Logs
Found:
28
|
Category Work Time: 188 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
06-19-2011
|
4.00
|
Ignition wiring secure
|
|
|
|
06-18-2011
|
4.00
|
Baffel seals
|
|
|
|
06-11-2011
|
5.00
|
Baffeling tension rods
|
|
|
|
05-10-2011
|
6.00
|
Induction duct final and paint
|
|
|
|
05-09-2011
|
9.00
|
Oil cooler mount refabricate,
|
|
|
|
04-29-2011
|
7.00
|
Oil cooler mount hook ups
|
|
|
|
04-23-2011
|
6.00
|
Alternate Air install
|
|
|
|
04-21-2011
|
8.00
|
Engine induction
|
|
|
|
04-20-2011
|
11.00
|
Baffels, Oil cooler mount
|
|
|
|
04-20-2011
|
5.00
|
Air filter install
|
|
|
|
03-28-2011
|
8.00
|
Baffel air ramps misc FWF
|
|
|
|
03-19-2011
|
8.00
|
Baffels
|
|
|
|
03-18-2011
|
8.50
|
Baffels
|
|
|
|
02-28-2011
|
6.00
|
Alternator wirring, cowl init oil fill door
|
|
|
|
02-27-2011
|
4.00
|
spinner fillets
|
|
|
|
02-15-2011
|
11.00
|
Spinner back plate spinner init
|
|
|
|
01-28-2011
|
4.00
|
Magneto P leads Map FW back
|
|
|
|
01-20-2011
|
2.00
|
Map final
|
|
|
|
10-29-2010
|
11.00
|
Fuel flow cube, breather line, Alternator install
|
|
|
|
10-28-2010
|
10.00
|
Prop gov control brackets vernier install
|
|
|
|
10-22-2010
|
7.00
|
Egt Map install
|
|
|
|
10-09-2010
|
4.00
|
Fuel Pump overflow
|
|
|
|
10-08-2010
|
11.50
|
Throttle, Mixture, Heater linkages
|
|
|
|
10-03-2010
|
10.00
|
Engine install misc connections
|
|
|
|
09-20-2010
|
3.00
|
RPM sense install Rt Mag, Oil temp, heater repair
|
|
|
|
09-19-2010
|
2.00
|
Engine uncrate prep throttle body, mixture ect
|
|
|
|
06-24-2010
|
5.00
|
Engine delivery, dolly build, MP block install
|
|
|
|
11-10-2009
|
8.00
|
Instrument panel install, wiring ess primary ect
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |