KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
Work Logs Found: 28
Category Work Time: 188 Hours
 Date
Hours
Work Log Summary

Details

 06-19-2011
4.00
Ignition wiring secure

 06-18-2011
4.00
Baffel seals

 06-11-2011
5.00
Baffeling tension rods

 05-10-2011
6.00
Induction duct final and paint

 05-09-2011
9.00
Oil cooler mount refabricate,

 04-29-2011
7.00
Oil cooler mount hook ups

 04-23-2011
6.00
Alternate Air install

 04-21-2011
8.00
Engine induction

 04-20-2011
11.00
Baffels, Oil cooler mount
       

 04-20-2011
5.00
Air filter install

 03-28-2011
8.00
Baffel air ramps misc FWF

 03-19-2011
8.00
Baffels
       

 03-18-2011
8.50
Baffels
     

 02-28-2011
6.00
Alternator wirring, cowl init oil fill door
       

 02-27-2011
4.00
spinner fillets
     

 02-15-2011
11.00
Spinner back plate spinner init
       

 01-28-2011
4.00
Magneto P leads Map FW back

 01-20-2011
2.00
Map final

 10-29-2010
11.00
Fuel flow cube, breather line, Alternator install
     

 10-28-2010
10.00
Prop gov control brackets vernier install

 10-22-2010
7.00
Egt Map install

 10-09-2010
4.00
Fuel Pump overflow

 10-08-2010
11.50
Throttle, Mixture, Heater linkages
       

 10-03-2010
10.00
Engine install misc connections

 09-20-2010
3.00
RPM sense install Rt Mag, Oil temp, heater repair

 09-19-2010
2.00
Engine uncrate prep throttle body, mixture ect

 06-24-2010
5.00
Engine delivery, dolly build, MP block install

 11-10-2009
8.00
Instrument panel install, wiring ess primary ect










Copyright © 2001-2024 Matronics. All Rights Reserved.