KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 5
Category Work Time: 38 Hours
 Date
Hours
Work Log Summary

Details

 09-15-2012
20.00
Installed Hartzell blended airfoil and Aircraft C
Details
       

 08-25-2012
3.00
Co-pilot Stick there was a clearance problem.
Details

 10-25-2011
4.00
FF3-2 Control Cable Blue Prop Gov cable (72.5 inch
Details
       

 10-23-2011
3.00
Eye-Ball Bulkhead Fitting
Details
       

 10-02-2011
8.00
X-10 Cowls, both the upper and lower
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.