KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
Work Logs Found: 61
Category Work Time: 308 Hours
 Date
Hours
Work Log Summary

Details

 08-04-2014
2.10
Scat tube support
Details
       

 08-02-2014
3.00
Fabricated IGN wires support bracket.
Details
       

 08-01-2014
3.50
MAP and IGN wires secured.
Details
       

 05-08-2014
4.30
Secured starter wire and heat box SCAT tube.
Details
     

 04-29-2014
8.40
Final tidy up and torquing.
Details

 02-04-2014
5.00
Oil cooler lines fabricated and installed.
Details
       

 11-26-2013
6.70
Silicone baffle material - Part 3.
Details
       

 11-24-2013
7.50
Silicone baffle material - Part 2.
Details
       

 11-19-2013
6.10
Silicone baffle material - Part 1.
Details
       

 11-16-2013
2.00
Amp meter shunt fusible links.
Details
       

 11-07-2013
6.50
Alternator / Starter / Shunt Installation
Details
       

 09-10-2013
2.20
P-Mags timed and oil cooler removed.
Details

 09-08-2013
7.80
CHT/EGT/Fuel Flow connections.
Details
       

 09-07-2013
3.80
Various FWF bits.
Details
       

 09-06-2013
4.50
R/H P-Mag and Alternator blast tubes.
Details
       

 09-05-2013
4.00
Engine baffle final installation.
Details
       

 09-04-2013
6.20
Securing wiring firewall forward.
Details
       

 09-02-2013
5.10
Oil cooler problem.
Details
       

 08-30-2013
8.00
Baffle retainer spacers.
Details
       

 08-19-2013
2.00
Prepared engine baffles for Certackote.
Details

 08-17-2013
8.00
GPS / XM Wx Antenna tray.
Details
       

 08-16-2013
7.00
Blast tube flange installation.
Details
       

 08-14-2013
7.00
Breather tube and fuel pump overflow.
Details
       

 06-28-2013
3.00
Oil Cooler and Engine Baffles - Part 10.
Details
       

 06-25-2013
5.00
Oil Cooler and Engine Baffles - Part 9.
Details
       

 06-24-2013
6.50
Oil Cooler and Engine Baffles - Part 8.
Details
       

 06-22-2013
9.50
Oil Cooler and Engine Baffles - Part 7.
Details
       

 06-20-2013
7.00
Oil Cooler and Engine Baffles - Part 6.
Details
       

 06-17-2013
7.50
Oil Cooler and Engine Baffles - Part 5.
Details
       

 06-09-2013
6.50
Oil Cooler and Engine Baffles - Part 4.
Details
       

 06-08-2013
5.50
Oil Cooler and Engine Baffles - Part 3.
Details
     

 06-07-2013
2.50
Replaced Skybolt C-Loks.
Details
     

 06-01-2013
4.00
Oil Cooler and Engine Baffles - Part 2.
Details
     

 05-31-2013
3.50
Bottom baffle retainer pins.
Details
     

 05-30-2013
8.00
Oil Cooler and Engine Baffles - Part 1.
Details
       

 01-12-2013
5.00
Manifold pressure sensing system- Part 2.
Details
       

 12-22-2012
3.00
More P-Mag wiring.
Details
     

 07-17-2012
7.00
Cowl hinges and Oil Door.
Details
       

 07-16-2012
5.00
Final Engine Installation, mixture bracket etc.
Details
       

 01-31-2012
3.00
Various Firewall Forward tasks.
Details
       

 01-29-2012
7.50
Engine baffles - Part 4.
Details
       

 01-28-2012
6.00
Cabin heat Muff installation.
Details
       

 01-26-2012
3.00
More engine pics.
Details
       

 01-26-2012
3.30
Exhaust system installation - Part 1.
Details
       

 01-23-2012
8.50
Engine Sensor wire pass through.
Details
       

 01-21-2012
6.50
Engine parameter sensors- Part 3.
Details
       

 01-18-2012
5.50
Engine parameter sensors- Part 2.
Details
       

 01-04-2012
5.50
Engine parameter sensors- Part 1.
Details

 01-01-2012
7.00
Various Firewall Forward planning tasks.
Details
       

 12-29-2011
5.20
Engine baffles - Part 3.
Details
       

 12-28-2011
4.00
Engine baffles - Part 2.
Details

 12-27-2011
5.00
Engine baffles - Part 1.
Details
     

 12-23-2011
5.00
Firewall cable penetrations.
Details
       

 12-08-2011
6.50
Heat Box Doubler.
Details
       

 12-02-2011
2.20
Gascolator and Heat Box planning.
Details

 11-22-2011
1.30
Primed and installed engine sensor mount.
Details
     

 10-05-2011
2.00
Engine sensor mount and gascolator planning.
Details
     

 10-03-2011
2.30
FAB - Part 3.
Details
       

 10-02-2011
1.20
FAB - Part 2.
Details
     

 10-01-2011
2.50
FAB - Part 1.
Details
     

 09-27-2011
5.50
Received Firewall Forward Kit.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.