Powered By Kitlog Pro v2.0
Jeff Mitchell's RV8 project
RV-8
Firewall Forward
Work Logs Found:
61
Category Work Time:
308 Hours
Date
Hours
Work Log Summary
Details
08-04-2014
2.10
Scat tube support
Details
08-02-2014
3.00
Fabricated IGN wires support bracket.
Details
08-01-2014
3.50
MAP and IGN wires secured.
Details
05-08-2014
4.30
Secured starter wire and heat box SCAT tube.
Details
04-29-2014
8.40
Final tidy up and torquing.
Details
02-04-2014
5.00
Oil cooler lines fabricated and installed.
Details
11-26-2013
6.70
Silicone baffle material - Part 3.
Details
11-24-2013
7.50
Silicone baffle material - Part 2.
Details
11-19-2013
6.10
Silicone baffle material - Part 1.
Details
11-16-2013
2.00
Amp meter shunt fusible links.
Details
11-07-2013
6.50
Alternator / Starter / Shunt Installation
Details
09-10-2013
2.20
P-Mags timed and oil cooler removed.
Details
09-08-2013
7.80
CHT/EGT/Fuel Flow connections.
Details
09-07-2013
3.80
Various FWF bits.
Details
09-06-2013
4.50
R/H P-Mag and Alternator blast tubes.
Details
09-05-2013
4.00
Engine baffle final installation.
Details
09-04-2013
6.20
Securing wiring firewall forward.
Details
09-02-2013
5.10
Oil cooler problem.
Details
08-30-2013
8.00
Baffle retainer spacers.
Details
08-19-2013
2.00
Prepared engine baffles for Certackote.
Details
08-17-2013
8.00
GPS / XM Wx Antenna tray.
Details
08-16-2013
7.00
Blast tube flange installation.
Details
08-14-2013
7.00
Breather tube and fuel pump overflow.
Details
06-28-2013
3.00
Oil Cooler and Engine Baffles - Part 10.
Details
06-25-2013
5.00
Oil Cooler and Engine Baffles - Part 9.
Details
06-24-2013
6.50
Oil Cooler and Engine Baffles - Part 8.
Details
06-22-2013
9.50
Oil Cooler and Engine Baffles - Part 7.
Details
06-20-2013
7.00
Oil Cooler and Engine Baffles - Part 6.
Details
06-17-2013
7.50
Oil Cooler and Engine Baffles - Part 5.
Details
06-09-2013
6.50
Oil Cooler and Engine Baffles - Part 4.
Details
06-08-2013
5.50
Oil Cooler and Engine Baffles - Part 3.
Details
06-07-2013
2.50
Replaced Skybolt C-Loks.
Details
06-01-2013
4.00
Oil Cooler and Engine Baffles - Part 2.
Details
05-31-2013
3.50
Bottom baffle retainer pins.
Details
05-30-2013
8.00
Oil Cooler and Engine Baffles - Part 1.
Details
01-12-2013
5.00
Manifold pressure sensing system- Part 2.
Details
12-22-2012
3.00
More P-Mag wiring.
Details
07-17-2012
7.00
Cowl hinges and Oil Door.
Details
07-16-2012
5.00
Final Engine Installation, mixture bracket etc.
Details
01-31-2012
3.00
Various Firewall Forward tasks.
Details
01-29-2012
7.50
Engine baffles - Part 4.
Details
01-28-2012
6.00
Cabin heat Muff installation.
Details
01-26-2012
3.00
More engine pics.
Details
01-26-2012
3.30
Exhaust system installation - Part 1.
Details
01-23-2012
8.50
Engine Sensor wire pass through.
Details
01-21-2012
6.50
Engine parameter sensors- Part 3.
Details
01-18-2012
5.50
Engine parameter sensors- Part 2.
Details
01-04-2012
5.50
Engine parameter sensors- Part 1.
Details
01-01-2012
7.00
Various Firewall Forward planning tasks.
Details
12-29-2011
5.20
Engine baffles - Part 3.
Details
12-28-2011
4.00
Engine baffles - Part 2.
Details
12-27-2011
5.00
Engine baffles - Part 1.
Details
12-23-2011
5.00
Firewall cable penetrations.
Details
12-08-2011
6.50
Heat Box Doubler.
Details
12-02-2011
2.20
Gascolator and Heat Box planning.
Details
11-22-2011
1.30
Primed and installed engine sensor mount.
Details
10-05-2011
2.00
Engine sensor mount and gascolator planning.
Details
10-03-2011
2.30
FAB - Part 3.
Details
10-02-2011
1.20
FAB - Part 2.
Details
10-01-2011
2.50
FAB - Part 1.
Details
09-27-2011
5.50
Received Firewall Forward Kit.
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1018
4065
Ailerons
25
84
Avionics
64
344
Empennage
118
324
Engine
4
17
Firewall Forward
61
308
Flaps
11
51
Fuel Tanks
54
190
Fuselage
457
1889
Misc Pics
6
4
Miscellaneous
26
215
Pics of me building
6
4
Prop
2
11
Tools
12
10
Training Kits
8
24
Wings
153
557
Workshop Setup
11
33
Copyright © 2001-2024 Matronics. All Rights Reserved.