Ralph Finch RV-9A Build
Work Logs Found: 22
Category Work Time: 40 Hours
 Date
Hours
Work Log Summary

Details

 10-01-2014
1.50
Reversed rudder cables
Details

 08-17-2014
1.00
Added jam nuts to FW side of control pass-thrus
Details

 05-27-2012
1.00
Re-did rudder links
Details
       

 05-25-2012
1.50
Attached rudder cables to pedals
Details
     

 05-24-2012
1.50
Permanently installed rudder pedals
Details

 02-08-2012
3.00
Finished installing electric aileron trim
Details
       

 02-06-2012
1.00
Continued electric aileron trim control

 02-05-2012
3.00
Continued electric aileron trim control
     

 02-04-2012
3.00
Continued electric aileron trim control

 10-08-2011
1.50
Installed elevator AP servo bracket
Details

 10-07-2011
1.00
Installed right rudder cable cover
Details
     

 10-06-2011
1.50
Installed left rudder cable fairing
Details
     

 10-05-2011
2.00
Threaded rudder cables
Details
     

 10-05-2011
1.00
Finished adding jam nuts
Details

 10-04-2011
1.00
Continue add jam nuts...
Details

 10-03-2011
1.00
What's worse....
Details

 10-02-2011
2.00
Finished connecting controls
Details
     

 10-01-2011
3.00
More control column work
Details

 09-29-2011
1.00
Installed control column WD-610
Details

 09-28-2011
5.00
Installed elev bellcrank, push-pull tubes
Details
     

 09-27-2011
1.00
Drilled & riveted control rod end to elevator tube

 09-24-2011
2.00
Cleaned, primed elevator push-pull tubes
Details
     