Powered By Kitlog Pro v2.0
Marks RV-8 Site
RV-8
Empennage
Work Logs Found:
36
Category Work Time:
104 Hours
Date
Hours
Work Log Summary
Details
11-22-2011
6.00
Finish Riveting Trim Tab to Elevator. Fit Elevato
11-16-2011
6.00
Trim Tab Work
11-14-2011
8.00
Details
11-07-2011
6.00
Debur and Prime Rivet
11-05-2011
3.00
Rt elevator work
10-30-2011
4.00
Rt Elevator work
Details
10-28-2011
3.00
Elevator Work
Details
10-27-2011
1.00
Primered elevator stiffners
10-25-2011
3.00
Rudder Work
Details
10-25-2011
3.00
Elevator Work
Details
10-24-2011
2.00
Rudder Work
10-22-2011
3.50
Rudder Work
Details
10-20-2011
2.00
Rudder Work
10-19-2011
6.00
Rudder Work
10-17-2011
4.00
Completed horizontal stabilizer
10-13-2011
1.50
Rudder Work
10-13-2011
2.00
Rear Spar
Details
10-13-2011
1.50
Horizontal Stabilizer work
10-11-2011
4.50
Horizontal stabilizer work
Details
10-09-2011
1.00
Rivet rudder stiffners to skin
10-07-2011
3.00
Back to work on horizontal stabilizer
Details
10-06-2011
4.00
Work on rudder
Details
10-06-2011
6.00
Vertical Stabilizer
Details
10-06-2011
1.00
Vertical Stabilizer
10-03-2011
3.00
Vertical stabilizer work.
Details
10-03-2011
2.00
Vertical stabilizer work
Details
09-26-2011
2.00
Horizontal Stabilizer Work
Details
09-25-2011
1.50
Match Drill HS-405 to HS-603
Details
09-24-2011
3.00
Empennage Ribs
Details
09-23-2011
1.50
Shape HS-810-1 and HS-814-1
09-22-2011
0.50
Match Drill HS-702 to HS-814-1 and HS-810-1
09-18-2011
0.50
Match drill VA-146 bearing assembly
Details
09-18-2011
1.00
Match drill elevator hinge brackets
Details
09-18-2011
1.00
Match Drill
Details
09-14-2011
2.50
Empennage work
Details
09-09-2011
1.00
Inventory
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
37
105
Empennage
36
104
Tools
1
1
Copyright © 2001-2024 Matronics. All Rights Reserved.