Date
|
Hours
|
Work Log Summary
|
Details
|
02-27-2013
|
1.00
|
Finished painting plenum
|
|
|
|
02-21-2013
|
1.00
|
Sanded and primed plenum.
|
|
|
|
02-19-2013
|
2.75
|
Plenum work
|
|
|
|
02-11-2013
|
3.50
|
Plenum fiberglass work..
|
|
|
|
01-29-2013
|
1.50
|
Modified plenum.
|
|
|
|
01-26-2013
|
1.00
|
Painted plenum.
|
|
|
|
01-26-2013
|
5.00
|
Modifying plenum, installed data plate.
|
|
|
|
01-24-2013
|
3.50
|
Finished installing elevator, and did some fibergl
|
|
|
|
11-29-2012
|
2.75
|
Sanding and filling plenum.
|
|
|
|
11-26-2012
|
1.00
|
Fiberglass work on plenum.
|
|
|
|
11-25-2012
|
3.00
|
Fiberglass work on plenum.
|
|
|
|
11-24-2012
|
1.00
|
Fiberglass work on plenum.
|
|
|
|
11-23-2012
|
1.50
|
Fiberglass work on plenum.
|
|
|
|
11-22-2012
|
2.00
|
Fiberglass work on plenum.
|
|
|
|
11-18-2012
|
2.00
|
Fiberglass work on plenum.
|
|
|
|
01-04-2012
|
3.50
|
Sanding and finishing cowling
|
|
|
|
12-31-2011
|
6.50
|
Painted cowling, started prepping the panel.
|
|
|
|
12-29-2011
|
2.00
|
Cowling priming
|
|
|
|
12-28-2011
|
1.75
|
Cowling paint prep
|
|
|
|
12-26-2011
|
4.00
|
Epoxy filling, sanding, made custom cowling pin co
|
|
|
|
12-25-2011
|
1.75
|
Epoxy filling and sanding
|
|
|
|
12-24-2011
|
1.25
|
Epoxy filled cowling imperfections.
|
|
|
|
12-23-2011
|
1.25
|
Installed finished baffles
|
|
|
|
12-21-2011
|
1.00
|
Painted baffles
|
|
|
|
12-20-2011
|
1.00
|
Painted baffles
|
|
|
|
12-19-2011
|
1.50
|
Painted plenum
|
|
|
|
12-18-2011
|
0.50
|
Attaching wiring harness brackets to baffles
|
|
|
|
12-16-2011
|
1.00
|
Priming baffles
|
|
|
|
12-15-2011
|
2.00
|
Plenum sanding and priming
|
|
|
|
12-14-2011
|
2.50
|
Plenum and baffles
|
|
|
|
12-13-2011
|
2.00
|
Plenum and Baffles
|
|
|
|
12-12-2011
|
2.00
|
Pleunum and baffles
|
|
|
|
12-11-2011
|
4.00
|
Baffles and plenum installation
|
|
|
|
12-10-2011
|
4.00
|
Baffles and plenum
|
|
|
|
12-09-2011
|
1.50
|
Baffle and plenum
|
|
|
|
12-06-2011
|
3.00
|
Plenum and cowling
|
|
|
|
12-05-2011
|
1.50
|
Plenum and baffle work
|
|
|
|
12-04-2011
|
2.00
|
Plenum baffle fabrication
|
|
|
|
12-03-2011
|
2.25
|
Plenum baffle fabrication
|
|
|
|
12-02-2011
|
1.75
|
Finished oil cooler plenum baffle
|
|
|
|
12-01-2011
|
2.25
|
Oil cooler baffle fabrication
|
|
|
|
11-30-2011
|
2.00
|
Plenum and cowling work
|
|
|
|
11-29-2011
|
3.25
|
Plenum and baffle work
|
|
|
|
11-28-2011
|
2.25
|
Plenum baffle fabrication and installation
|
|
|
|
11-27-2011
|
2.25
|
Plenum baffle fabrication
|
|
|
|
11-26-2011
|
3.75
|
Cowling, plenum
|
|
|
|
11-25-2011
|
3.50
|
Cowling, started plenum installation
|
|
|
|
11-24-2011
|
2.25
|
Cowling inlet ring installation
|
|
|
|
11-22-2011
|
2.50
|
Cowling assembly
|
|
|
|
11-20-2011
|
3.50
|
Final cowling assembly
|
|
|
|
11-19-2011
|
3.50
|
Upper cowling work
|
|
|
|
11-18-2011
|
2.75
|
Upper cowling work
|
|
|
|
11-17-2011
|
1.00
|
Upper cowling work
|
|
|
|
11-16-2011
|
3.00
|
Upper cowling work
|
|
|
|
11-14-2011
|
2.25
|
Cowlijg work
|
Details
|
|
|
11-01-2011
|
2.00
|
Cut cowling pins, continued working on mounting ne
|
|
|
|
10-31-2011
|
1.50
|
Continued work on the cowling installation
|
|
|
|
10-30-2011
|
2.00
|
Replacing hinges in cowling. Joel stopped to give
|
|
|
|
10-19-2011
|
1.50
|
Replacing cowling hinges
|
Details
|
|
|
10-18-2011
|
2.00
|
Started working on side hinges between top and bot
|
|
|
|
10-12-2011
|
2.50
|
Finished the cowling oil door
|
|
|
|
10-09-2011
|
1.00
|
Cowling oil door
|
|
|
|
10-05-2011
|
1.75
|
Cowling oil door
|
|
|
|
10-04-2011
|
1.50
|
Air box transition, fiberglass work on the oil doo
|
|
|
|
10-03-2011
|
1.50
|
Cowling oil door, air box inlet
|
Details
|
|
|
10-02-2011
|
2.00
|
Finish to oil door, fitted airbox transition
|
|
|
|
10-01-2011
|
3.00
|
Oil door, airbox transition
|
Details
|
|
|
09-28-2011
|
3.50
|
Fitting airbox and transition
|
|
|
|
09-27-2011
|
2.75
|
Mounted inlet ring on cowling
|
Details
|
|
|
09-26-2011
|
2.25
|
Fitting the airbox to the carb and lower cowling
|
|
|
|
09-24-2011
|
4.75
|
Cowling work
|
Details
|
|
|
09-23-2011
|
1.75
|
Riveted cowling hinges to cowling
|
|
|
|
09-21-2011
|
2.00
|
Finished fitting upper cowling
|
Details
|
|
|
09-20-2011
|
2.50
|
Fitting upper cowling
|
|
|
|
09-19-2011
|
2.50
|
Fitting upper cowling
|
|
|
|
09-18-2011
|
2.75
|
Cowling fitting
|
Details
|
|
|
09-15-2011
|
2.00
|
Final fitting of lower cowling against firewall
|
|
|
|
09-14-2011
|
2.00
|
Fitting hinges on the lower cowling
|
|
|
|
09-12-2011
|
1.50
|
Cowling fitting
|
|
|
|
09-11-2011
|
2.25
|
Cowling fitting
|
|
|
|
09-05-2011
|
1.50
|
Initial fitting of cowling
|
|
|