Barrys RV-9A Project
Work Logs Found: 81
Category Work Time: 184 Hours
 Date
Hours
Work Log Summary

Details

 02-27-2013
1.00
Finished painting plenum

 02-21-2013
1.00
Sanded and primed plenum.

 02-19-2013
2.75
Plenum work

 02-11-2013
3.50
Plenum fiberglass work..

 01-29-2013
1.50
Modified plenum.

 01-26-2013
1.00
Painted plenum.

 01-26-2013
5.00
Modifying plenum, installed data plate.

 01-24-2013
3.50
Finished installing elevator, and did some fibergl

 11-29-2012
2.75
Sanding and filling plenum.

 11-26-2012
1.00
Fiberglass work on plenum.

 11-25-2012
3.00
Fiberglass work on plenum.

 11-24-2012
1.00
Fiberglass work on plenum.

 11-23-2012
1.50
Fiberglass work on plenum.

 11-22-2012
2.00
Fiberglass work on plenum.

 11-18-2012
2.00
Fiberglass work on plenum.

 01-04-2012
3.50
Sanding and finishing cowling

 12-31-2011
6.50
Painted cowling, started prepping the panel.

 12-29-2011
2.00
Cowling priming

 12-28-2011
1.75
Cowling paint prep

 12-26-2011
4.00
Epoxy filling, sanding, made custom cowling pin co

 12-25-2011
1.75
Epoxy filling and sanding

 12-24-2011
1.25
Epoxy filled cowling imperfections.

 12-23-2011
1.25
Installed finished baffles

 12-21-2011
1.00
Painted baffles

 12-20-2011
1.00
Painted baffles

 12-19-2011
1.50
Painted plenum

 12-18-2011
0.50
Attaching wiring harness brackets to baffles

 12-16-2011
1.00
Priming baffles

 12-15-2011
2.00
Plenum sanding and priming

 12-14-2011
2.50
Plenum and baffles

 12-13-2011
2.00
Plenum and Baffles

 12-12-2011
2.00
Pleunum and baffles

 12-11-2011
4.00
Baffles and plenum installation

 12-10-2011
4.00
Baffles and plenum

 12-09-2011
1.50
Baffle and plenum

 12-06-2011
3.00
Plenum and cowling

 12-05-2011
1.50
Plenum and baffle work

 12-04-2011
2.00
Plenum baffle fabrication

 12-03-2011
2.25
Plenum baffle fabrication

 12-02-2011
1.75
Finished oil cooler plenum baffle

 12-01-2011
2.25
Oil cooler baffle fabrication

 11-30-2011
2.00
Plenum and cowling work

 11-29-2011
3.25
Plenum and baffle work

 11-28-2011
2.25
Plenum baffle fabrication and installation

 11-27-2011
2.25
Plenum baffle fabrication

 11-26-2011
3.75
Cowling, plenum

 11-25-2011
3.50
Cowling, started plenum installation

 11-24-2011
2.25
Cowling inlet ring installation

 11-22-2011
2.50
Cowling assembly

 11-20-2011
3.50
Final cowling assembly

 11-19-2011
3.50
Upper cowling work

 11-18-2011
2.75
Upper cowling work

 11-17-2011
1.00
Upper cowling work

 11-16-2011
3.00
Upper cowling work

 11-14-2011
2.25
Cowlijg work
Details

 11-01-2011
2.00
Cut cowling pins, continued working on mounting ne

 10-31-2011
1.50
Continued work on the cowling installation

 10-30-2011
2.00
Replacing hinges in cowling. Joel stopped to give

 10-19-2011
1.50
Replacing cowling hinges
Details

 10-18-2011
2.00
Started working on side hinges between top and bot

 10-12-2011
2.50
Finished the cowling oil door
       

 10-09-2011
1.00
Cowling oil door

 10-05-2011
1.75
Cowling oil door

 10-04-2011
1.50
Air box transition, fiberglass work on the oil doo

 10-03-2011
1.50
Cowling oil door, air box inlet
Details
       

 10-02-2011
2.00
Finish to oil door, fitted airbox transition

 10-01-2011
3.00
Oil door, airbox transition
Details
     

 09-28-2011
3.50
Fitting airbox and transition

 09-27-2011
2.75
Mounted inlet ring on cowling
Details

 09-26-2011
2.25
Fitting the airbox to the carb and lower cowling

 09-24-2011
4.75
Cowling work
Details

 09-23-2011
1.75
Riveted cowling hinges to cowling

 09-21-2011
2.00
Finished fitting upper cowling
Details
       

 09-20-2011
2.50
Fitting upper cowling

 09-19-2011
2.50
Fitting upper cowling

 09-18-2011
2.75
Cowling fitting
Details
     

 09-15-2011
2.00
Final fitting of lower cowling against firewall
       

 09-14-2011
2.00
Fitting hinges on the lower cowling

 09-12-2011
1.50
Cowling fitting

 09-11-2011
2.25
Cowling fitting

 09-05-2011
1.50
Initial fitting of cowling