Date
|
Hours
|
Work Log Summary
|
Details
|
04-17-2018
|
1.00
|
Work on left main wheel fairing
|
Details
|
|
|
04-15-2018
|
4.00
|
Work on wheel fairings
|
Details
|
|
|
04-14-2018
|
2.00
|
Work on right main wheel fairings
|
Details
|
|
|
04-08-2018
|
3.00
|
Work on main wheel fairings
|
Details
|
|
|
04-07-2018
|
3.00
|
Work on wheel fairings
|
Details
|
|
|
03-18-2018
|
4.00
|
Trimmed wheel fairings
|
Details
|
|
|
03-17-2018
|
3.00
|
|
Details
|
|
|
03-15-2018
|
1.00
|
Installed right wheel and fairing bracket
|
Details
|
|
|
02-25-2018
|
2.00
|
Work on nose leg and nose wheel fairings
|
Details
|
|
|
02-24-2018
|
2.00
|
Nose leg fairing work
|
Details
|
|
|
02-19-2018
|
0.50
|
Work on nose gear leg fairing
|
Details
|
|
|
02-11-2018
|
1.50
|
Work on nose leg fairing
|
Details
|
|
|
01-28-2018
|
1.50
|
Redrilled holes in nose leg, fixed fuel leak
|
Details
|
|
|
01-20-2018
|
0.50
|
Covered holes in nose leg with epoxy
|
Details
|
|
|
01-14-2018
|
1.00
|
Work on nose leg fairing
|
Details
|
|
|
01-13-2018
|
2.00
|
Work on nose leg fairing
|
Details
|
|
|
01-01-2018
|
1.00
|
Nose leg fairing
|
Details
|
|
|
12-31-2017
|
2.50
|
Nose wheel fairing
|
Details
|
|
|
11-23-2017
|
1.00
|
Cut opening for main gear legs in fairings
|
Details
|
|
|
11-11-2017
|
3.00
|
100 hour engine maintenance
|
Details
|
|
|
11-05-2017
|
3.00
|
Wheel fairings
|
Details
|
|
|
11-04-2017
|
1.50
|
Wheel fairings
|
Details
|
|
|
10-29-2017
|
2.00
|
Wheel fairings
|
Details
|
|
|
10-15-2017
|
4.00
|
Work on wheel fairings
|
Details
|
|
|
10-09-2017
|
3.50
|
Work on wheel fairings
|
Details
|
|
|
10-08-2017
|
5.00
|
Work on Nose Wheel fairing
|
Details
|
|
|
10-07-2017
|
6.00
|
Nose Fork Upgrade and Wheel Fairing work
|
Details
|
|
|
10-01-2017
|
0.50
|
Worked on wheel fairings
|
Details
|
|
|
12-30-2016
|
4.00
|
Checked brake lines, placed original panel screws
|
Details
|
|
|
12-29-2016
|
5.00
|
Replaced brakelines, tightened fittings
|
Details
|
|
|
12-28-2016
|
2.00
|
Replaced more panel screws
|
Details
|
|
|
12-18-2016
|
2.00
|
Replaced Panel screws, installed fire extinguisher
|
Details
|
|
|
12-17-2016
|
1.00
|
Tightened landing gear bolts, checked for leaks
|
Details
|
|
|
11-24-2016
|
4.00
|
Prepped aircraft for DAR inspection
|
Details
|
|
|
11-22-2016
|
1.50
|
Worked on "Squawk" items
|
Details
|
|
|
11-20-2016
|
2.50
|
|
Details
|
|
|
11-19-2016
|
1.50
|
Fix items in the "squawk" list
|
Details
|
|
|
11-18-2016
|
2.00
|
Helped A&P with initial condition inspection
|
Details
|
|
|
11-13-2016
|
3.00
|
SV Backup Battery test
|
Details
|
|
|
11-12-2016
|
2.00
|
Fuel calibration
|
Details
|
|
|
11-11-2016
|
5.50
|
Drained fuel, repositioned fuel line
|
Details
|
|
|
11-05-2016
|
5.00
|
Fuel System Calibration
|
Details
|
|
|
11-04-2016
|
1.00
|
Redid Weight and Balance
|
Details
|
|
|
11-03-2016
|
2.00
|
Weight and Balance
|
Details
|
|
|
11-01-2016
|
2.00
|
Weight and Balance
|
Details
|
|
|
10-12-2016
|
1.00
|
Riveted the Canopy Catch
|
Details
|
|
|
10-10-2016
|
2.50
|
Prepped Canopy Catch parts, did Nose Fork SB
|
Details
|
|
|
10-05-2016
|
1.50
|
Worked on SB, installed cover plates and carpet
|
Details
|
|
|
10-02-2016
|
6.00
|
Painted gear legs, installed covers and fairings
|
Details
|
|
|
09-18-2016
|
4.00
|
Tech Counselor visit, installed tie down ring
|
Details
|
|
|
09-17-2016
|
4.00
|
Systems check, installed Wing Walk
|
Details
|
|
|
09-11-2016
|
3.00
|
Cleaned Canopy, Placard and Systems check
|
Details
|
|
|
09-10-2016
|
5.50
|
Work on right wheel assemby and Canopy
|
Details
|
|
|
09-07-2016
|
1.50
|
Worked on left wheel assemby and brake.
|
Details
|
|
|
09-05-2016
|
3.50
|
Installed Wings and Canopy
|
Details
|
|
|
09-04-2016
|
3.00
|
Covered avionics bay, fixed Fuse Pin Stoppers
|
Details
|
|
|
09-03-2016
|
4.00
|
Secured wires, installed Fuse Side Covers
|
Details
|
|
|
08-28-2016
|
3.00
|
Installed gasket at wing root. Worked on radio.
|
Details
|
|
|
08-27-2016
|
3.00
|
Worked on Audio and Landing Gear bolts
|
Details
|
|
|
08-21-2016
|
2.50
|
Add Wires to Radio, Checked landing gear bolts
|
Details
|
|
|
08-18-2016
|
3.00
|
Installed ELT Bracket, did hangar clean up.
|
Details
|
|
|
08-14-2016
|
3.00
|
Replaced Canopy Gas Struts, Installed Steps
|
Details
|
|
|
08-13-2016
|
2.50
|
Assebled Fuse Pins, placed placard
|
Details
|
|
|
08-07-2016
|
3.00
|
Worked on radio again, checked headset jacks
|
Details
|
|
|
08-06-2016
|
3.50
|
Painted Fuselage Pins, cleaned aircraft surfaces
|
Details
|
|
|
07-31-2016
|
3.00
|
Work on Canopy and Fairing
|
Details
|
|
|
07-30-2016
|
3.00
|
Work on Fuselage Pins and Canopy Fairing
|
Details
|
|
|
07-24-2016
|
2.00
|
More cleaning of the skins
|
Details
|
|
|
07-23-2016
|
4.00
|
Clean up of aluminum skins
|
Details
|
|
|
07-17-2016
|
4.00
|
Installed placards and cleaned the skins
|
Details
|
|
|
07-16-2016
|
6.00
|
Installed Aft Window
|
Details
|
|
|
07-09-2016
|
4.00
|
Trimmed fuel vent line, cleaned aircraft surfaces
|
Details
|
|
|
07-06-2016
|
2.50
|
Installed placards and upholstery pieces
|
Details
|
|
|
07-04-2016
|
3.50
|
Installed Data Plate, sealed Canopy Fairing
|
Details
|
|
|
07-03-2016
|
3.00
|
Work on interior, Canopy Fairing and COM
|
Details
|
|
|
07-02-2016
|
4.00
|
Fitting and installation of upholstery
|
Details
|
|
|
06-26-2016
|
2.50
|
Worked on COM radio, installed placard
|
Details
|
|
|
06-25-2016
|
3.00
|
Updated Aux Music Jack wires, place upholstery
|
Details
|
|
|
06-19-2016
|
3.00
|
Work on radio, sanded the Canopy Fairing
|
Details
|
|
|
06-18-2016
|
4.00
|
Reviewed Pre-start procedure, Canopy Fairing work
|
Details
|
|
|
06-12-2016
|
3.00
|
Connected Aux Music Jack wires, worked on ICS
|
Details
|
|
|
06-11-2016
|
3.50
|
Checked prop pitch and tracking
|
Details
|
|
|
06-08-2016
|
1.50
|
Tested fuel flow rate
|
Details
|
|
|
06-05-2016
|
3.00
|
Fuel system check, Canopy Fairing work
|
Details
|
|
|
05-30-2016
|
3.50
|
Pitot/Static system work, replaced Aux Music Jack
|
Details
|
|
|
05-29-2016
|
2.00
|
Troubleshooting Pitot System leak
|
Details
|
|
|
05-28-2016
|
3.00
|
Purged oil system, Pitot system test
|
Details
|
|
|
05-12-2016
|
4.00
|
Flight Controls and Systems checks
|
Details
|
|
|
05-07-2016
|
4.00
|
Work on Trim and tested Aux Music jack
|
Details
|
|
|
04-17-2016
|
2.00
|
Worked on wiiring in L Fuselage, installed Nav lig
|
Details
|
|
|
04-16-2016
|
3.50
|
Fuselage and Avionics wiring correction
|
Details
|
|
|
04-10-2016
|
3.00
|
Tested Trim Servo. Removed L80 and L82 wires
|
Details
|
|
|
04-09-2016
|
3.00
|
Looking for source of short circuit
|
Details
|
|
|
04-02-2016
|
2.50
|
Still working on wiring issues
|
Details
|
|
|
03-30-2016
|
2.50
|
Reversed headset harness connections
|
Details
|
|
|
03-27-2016
|
2.00
|
Checked Left Fuselage electrical connections
|
Details
|
|
|
03-26-2016
|
2.00
|
Looking for source of short circuit
|
Details
|
|
|
03-22-2016
|
0.50
|
Check for short in Strobe Power wiring
|
Details
|
|
|
03-20-2016
|
1.50
|
Wiring checks
|
Details
|
|
|
03-19-2016
|
2.00
|
Tested wiring to look for source of short circuit
|
Details
|
|
|
03-13-2016
|
3.00
|
Checked fuselage wiring
|
Details
|
|
|
03-05-2016
|
3.00
|
Systems Testing and put washers under screws
|
Details
|
|
|
02-28-2016
|
1.00
|
Put washers under canopy screws & Systems Testing
|
Details
|
|
|
02-20-2016
|
1.00
|
Moved the Canopy and trimmed the fairing
|
Details
|
|
|
02-14-2016
|
2.00
|
Peeled the Canopy Fairing from the Fuselage
|
Details
|
|
|
02-13-2016
|
4.00
|
Sanded Canopy Fairing and drilled pivot holes
|
Details
|
|
|
02-06-2016
|
1.00
|
Applied UV Smooth Prime on Canopy Fairing
|
Details
|
|
|
01-24-2016
|
2.00
|
Sanded the Canopy Fairing
|
Details
|
|
|
01-10-2016
|
2.50
|
Filled low areas on the Canopy Fairing
|
Details
|
|
|
01-09-2016
|
4.00
|
Squeezed the Stabilator and Rudder
|
Details
|
|
|
01-03-2016
|
2.00
|
Squeezed Flaperons and more Canopy Fairing work
|
Details
|
|
|
01-02-2016
|
1.50
|
Work on Canopy Fairing
|
Details
|
|
|
01-01-2016
|
2.00
|
Work on Canopy Fairing
|
Details
|
|
|
12-30-2015
|
3.00
|
Sanded Canopy Fairing
|
Details
|
|
|
12-29-2015
|
4.00
|
Work on Canopy Fairing
|
Details
|
|
|
12-28-2015
|
6.00
|
Work on Canopy Fairing
|
Details
|
|
|
12-27-2015
|
3.00
|
Work on Canopy, Trimmed Flaperon skins
|
Details
|
|
|
12-20-2015
|
3.50
|
Removed old sealant & put Flox on Canopy Foams
|
Details
|
|
|
12-19-2015
|
4.00
|
Removed Canopy Fairing
|
Details
|
|
|
12-13-2015
|
4.50
|
Installed Canopy & Wings, Latch Warning work
|
Details
|
|
|
12-12-2015
|
1.00
|
Checked movement of controls and attachments
|
Details
|
|
|
12-06-2015
|
3.00
|
Installed Canopy Seals and Koger Shade
|
Details
|
|
|
12-05-2015
|
3.00
|
Installed Placards on Panels, riveted extensions
|
Details
|
|
|
11-29-2015
|
4.50
|
Installed Latch Plate and Microswitch on Roll Bar
|
Details
|
|
|
11-22-2015
|
4.00
|
Installed Fuel Tank
|
Details
|
|
|
11-21-2015
|
2.00
|
Put brake fluid in system
|
Details
|
|
|
11-13-2015
|
3.50
|
Re-installed brake line fittings
|
Details
|
|
|
11-11-2015
|
2.00
|
Reversed orientation of CPU fans
|
Details
|
|
|
11-07-2015
|
5.00
|
Brake line bleeding, trimmed prop gap fillers
|
Details
|
|
|
11-01-2015
|
5.00
|
Installed new spar pin switch, purged brake lines
|
Details
|
|
|
10-31-2015
|
2.50
|
Spar Pin Switch Upgrade
|
Details
|
|
|
10-17-2015
|
4.00
|
Final stab cable adjustment, fuel pump noise filte
|
Details
|
|
|
10-12-2015
|
3.00
|
Installed propeller and another spacer
|
Details
|
|
|
10-11-2015
|
4.50
|
Check stab cable tension, cut spring in flap handl
|
Details
|
|
|
10-10-2015
|
3.00
|
Work on Stabilator cables
|
Details
|
|
|
10-03-2015
|
2.00
|
Fuel Vent Lines install, Tunnel Pocket trial insta
|
Details
|
|
|
09-27-2015
|
4.00
|
Work on Stab cables, shoulder harness, etc
|
Details
|
|
|
09-26-2015
|
5.00
|
Installed Stabilator and cables
|
Details
|
|
|
09-20-2015
|
3.00
|
Connected rudder cables
|
Details
|
|
|
09-19-2015
|
6.00
|
Installed Map Box, Rudder and Cables
|
Details
|
|
|
09-12-2015
|
6.00
|
Secured brake lines and wiring
|
Details
|
|
|
08-30-2015
|
3.00
|
Work on flight controls
|
Details
|
|
|
08-01-2015
|
4.00
|
Work on the Canopy Latch
|
Details
|
|
|
07-25-2015
|
3.50
|
Check cylinder heads, disconnected Fuel Rtn Assy
|
Details
|
|
|
07-19-2015
|
2.00
|
Redid the Fuel Return Line Aft
|
Details
|
|
|
07-18-2015
|
3.00
|
Work on Wing electrical connector & Fuel vent line
|
Details
|
|
|
07-12-2015
|
3.00
|
Electrical work on ELT, wings and headsets
|
Details
|
|
|
07-11-2015
|
4.00
|
Fuel Tank Vent Modification, checked Emp. bolts
|
Details
|
|
|
07-05-2015
|
3.00
|
Installed safety belts and anti-abrasion strip
|
Details
|
|
|
06-21-2015
|
2.00
|
Work on the Rudder Cables
|
Details
|
|
|
06-20-2015
|
3.00
|
Work on Rudder Cables
|
Details
|
|
|
06-14-2015
|
5.00
|
Work on flight controls, rudder
|
Details
|
|
|
09-13-2014
|
4.50
|
Trimmed inboard wing skins.
|
Details
|
|
|
08-23-2014
|
4.00
|
Final-drilled holes in Flaperon Torque Arms & Tube
|
Details
|
|
|
08-22-2014
|
2.00
|
Drilled hoes in Flaperon Torque Tubes
|
Details
|
|
|
08-17-2014
|
2.50
|
Positioned Flaperon Torque Tubes for drilling
|
Details
|
|
|
07-05-2014
|
2.00
|
Canopy latch switch retrofit
|
Details
|
|
|
06-30-2014
|
0.50
|
Prepped ADAHRS Stiffener
|
Details
|
|
|
03-15-2014
|
2.00
|
More work on cowling and started work on FWF
|
Details
|
|
|
03-12-2014
|
1.00
|
Primed the Fuel Tank and the Neck
|
Details
|
|
|
03-02-2014
|
3.50
|
Drilled holes in Top Cowl and sanded edges
|
Details
|
|
|
03-01-2014
|
4.00
|
Work on cowl hinges
|
Details
|
|
|
02-28-2014
|
4.50
|
More work on cowling
|
Details
|
|
|
02-27-2014
|
7.00
|
Work on cowling and inventoried parts
|
Details
|
|
|
02-19-2014
|
1.00
|
Retested fuel tank for leaks
|
Details
|
|
|
02-16-2014
|
1.50
|
Fuel tank leak test
|
Details
|
|
|
02-08-2014
|
2.00
|
Completed service bulletins for fuel tank
|
Details
|
|
|
01-25-2014
|
1.50
|
Fuel tank vent modification
|
Details
|
|
|
01-20-2014
|
5.50
|
Installed Fuel Tank Vent, Gauge and nutplates
|
Details
|
|
|
01-19-2014
|
5.00
|
Fuel Tank Attach Modification
|
Details
|
|
|
01-18-2014
|
4.00
|
Fuel Tank Attach Modification
|
Details
|
|
|
01-01-2014
|
1.50
|
Fuel Tank Mods work
|
Details
|
|
|
12-29-2013
|
4.00
|
Fuel Tank Modifications
|
Details
|
|
|
12-22-2013
|
4.50
|
Work on Fuel Tank mods and Cowl Hinges
|
Details
|
|
|
12-21-2013
|
1.50
|
Work on Cowl, Hinge Pins and Fuel Tank parts
|
Details
|
|
|
12-20-2013
|
1.50
|
Made 2 Hinge Pins and prepped Fuel Tank for mods
|
Details
|
|
|
12-01-2013
|
4.00
|
Work on Cowl and Hinge Pins
|
Details
|
|
|
11-30-2013
|
1.50
|
Work on Top Cowl
|
Details
|
|
|
11-24-2013
|
1.50
|
Prepped Oil Door and hinge parts, and rudder links
|
Details
|
|
|
11-21-2013
|
4.00
|
Installed Flaperon Pushrod Assembly and AP Servo
|
Details
|
|
|
11-11-2013
|
4.00
|
Installed Flap/Pushrod & Ctrl Stick Pushrod Assemb
|
Details
|
|
|
10-08-2013
|
4.50
|
Drilled holes in Canopy Fairing, assembled latch
|
Details
|
|
|
09-29-2013
|
2.00
|
Glued the Canopy Fairing to the Fuselage
|
Details
|
|
|
09-28-2013
|
0.50
|
Sanded the canopy foams some more
|
Details
|
|
|
09-25-2013
|
0.50
|
Sanded the Canopy Foams
|
Details
|
|
|
09-22-2013
|
4.00
|
Trimmed Canopy Fairing
|
Details
|
|
|
09-21-2013
|
3.50
|
Scuffed canopy and skirt, marked fairing for trimm
|
Details
|
|
|
09-07-2013
|
3.00
|
Trial fit of Canopy Latch, riveted Latch Block
|
Details
|
|
|
09-02-2013
|
2.00
|
Shaped the Canopy Foams
|
Details
|
|
|
09-01-2013
|
4.00
|
Trimmed the Canopy Foams and glued to the Frame
|
Details
|
|
|
08-31-2013
|
5.00
|
Installed Canopy, Skirts, Guide Plates & Latch Han
|
Details
|
|
|
08-30-2013
|
1.00
|
Filed Aft Window edges, shaped Canopy Handle
|
Details
|
|
|
08-24-2013
|
3.00
|
Primed and painted the Canopy Frame
|
Details
|
|
|
08-23-2013
|
3.00
|
Canopy work
|
Details
|
|
|
08-18-2013
|
2.00
|
Canopy work
|
Details
|
|
|
08-12-2013
|
4.00
|
More Canopy work.
|
Details
|
|
|
08-04-2013
|
3.50
|
Tapped holes in Roll Bar and filed the Canopy
|
Details
|
|
|
08-03-2013
|
4.00
|
Tailcone and Canopy work
|
Details
|
|
|
07-28-2013
|
5.00
|
More Canopy work
|
Details
|
|
|
07-27-2013
|
5.00
|
Canopy work
|
Details
|
|
|
07-21-2013
|
2.00
|
Canopy and Instrument Panel work
|
Details
|
|
|
07-20-2013
|
4.50
|
Canopy, Instrument Panel and Avionics work
|
Details
|
|
|
06-29-2013
|
5.50
|
Canopy frame work and avionics wiring
|
Details
|
|
|
06-23-2013
|
4.50
|
Work on Canopy Frame
|
Details
|
|
|
06-19-2013
|
3.00
|
Stiffener Retrofit work
|
Details
|
|
|
06-16-2013
|
4.00
|
Firewall Stiffener retrofit and APDC wiring work
|
Details
|
|
|
06-15-2013
|
6.00
|
Stiffener Retrofit
|
Details
|
|
|
05-06-2013
|
0.50
|
Primed and painted the MOD Rib
|
Details
|
|
|
05-05-2013
|
3.00
|
Installed Over Rudder Wireway
|
Details
|
|
|
04-13-2013
|
2.50
|
Tightened axle nuts and Nose Fork Assembly
|
Details
|
|
|
03-17-2013
|
2.50
|
Drilled hole in Firewall and tapped holes in Nose
|
Details
|
|
|
03-16-2013
|
5.50
|
Fabricated Caliper Brake Lines
|
Details
|
|
|
03-10-2013
|
3.50
|
Installed main wheels, nose gear and anti-rotation
|
Details
|
|
|
03-09-2013
|
5.00
|
Bolted main gear axles, installed nose gear
|
Details
|
|
|
02-24-2013
|
4.00
|
Riveted right side skin doublers, attached right g
|
Details
|
|
|
02-23-2013
|
5.00
|
Riveted left side skin doublers and attached left
|
Details
|
|
|
02-18-2013
|
4.00
|
Landing gear modification and more
|
Details
|
|
|
02-17-2013
|
4.00
|
Landing gear modification
|
Details
|
|
|
02-16-2013
|
3.00
|
Landing Gear modification
|
Details
|
|
|
02-02-2013
|
5.50
|
Landing gear modification
|
Details
|
|
|
02-01-2013
|
1.00
|
Worked on landing gear mod parts
|
Details
|
|
|
01-28-2013
|
1.50
|
Primed Side Skin Doublers and Stiffener angles
|
Details
|
|
|
01-27-2013
|
4.50
|
Landing gear modification
|
Details
|
|
|
01-26-2013
|
2.50
|
Landing Gear modification
|
Details
|
|
|
01-01-2013
|
4.00
|
Landing Gear modification
|
Details
|
|
|
12-22-2012
|
3.50
|
Work on Skyview wiring upgrade and SB 12-11-09
|
Details
|
|
|
12-09-2012
|
4.00
|
Replaced aft fuel return line, worked on avionics
|
Details
|
|
|
12-08-2012
|
5.00
|
Finished righ wing wiring upgrade, changed fuel li
|
Details
|
|
|
11-25-2012
|
5.00
|
Right wing wiring upgrade
|
Details
|
|
|
11-24-2012
|
6.00
|
Wing wiring upgrade
|
Details
|
|
|
11-22-2012
|
2.50
|
Installing new wing wires
|
Details
|
|
|
11-18-2012
|
4.50
|
Reinstalled Pushrod Assembly, etc
|
Details
|
|
|
11-16-2012
|
0.50
|
Primed Parts
|
Details
|
|
|
11-11-2012
|
2.50
|
Installed OAT Probe and ADAHRS
|
Details
|
|
|
11-10-2012
|
5.00
|
Fabricated Servo Pushrod Assemblies, Static line w
|
Details
|
|
|
11-09-2012
|
1.00
|
Primed parts and riveted nutplates
|
Details
|
|
|
11-07-2012
|
1.50
|
Worked on Rudder Pedal Access Covers
|
Details
|
|
|
11-01-2012
|
0.50
|
Drilled out rivets from map box door
|
Details
|
|
|
10-28-2012
|
4.50
|
Installed ELT and put spacers to Flaperon Torque T
|
Details
|
|
|
10-27-2012
|
5.00
|
Installed Servo Trim Wire Upgrade
|
Details
|
|
|
10-26-2012
|
6.00
|
Instrument Panel and Map Box work
|
Details
|
|
|
10-08-2012
|
3.50
|
Fitted and trimmed Flap Handle Tube, etc
|
Details
|
|
|
10-07-2012
|
6.00
|
Fabricated flight control parts
|
Details
|
|
|
10-06-2012
|
3.00
|
Installed the Flap Handle/Pushrod Assembly
|
Details
|
|
|
10-05-2012
|
1.00
|
Riveted Flap Handle Forks and Flap Detent parts
|
Details
|
|
|
10-04-2012
|
1.00
|
Drilled holes in the Flap Detent Angle
|
Details
|
|
|
10-03-2012
|
1.00
|
Drilled holes in the the Map Box Door and hinge
|
Details
|
|
|
09-27-2012
|
0.50
|
Primed the Tunnel Pocket parts
|
Details
|
|
|
09-26-2012
|
1.00
|
Painted map box and POH tray
|
Details
|
|
|
09-23-2012
|
4.50
|
Work on map box, POH tray & tunnel pocket
|
Details
|
|
|
09-22-2012
|
5.50
|
Installed new Inst and Com Supports, did other wor
|
Details
|
|
|
09-20-2012
|
1.00
|
Work on Flap control parts
|
Details
|
|
|
09-19-2012
|
1.00
|
Work on Servo upgrade and Instrument Panels
|
Details
|
|
|
09-17-2012
|
1.00
|
Work on hardware for Skyview upgrade
|
Details
|
|
|
09-05-2012
|
0.50
|
Primed New Servo Tray and Com Supports
|
Details
|
|
|
08-30-2012
|
2.00
|
Riveted nutplates to Inst Stack Angles
|
Details
|
|
|
08-29-2012
|
2.50
|
New inst stack angles and ADAHRS bracket work
|
Details
|
|
|
08-26-2012
|
5.00
|
Modifications for Skyview upgrade
|
Details
|
|
|
06-11-2012
|
3.00
|
Made the Flap Handle/Pushrod Assembly
|
Details
|
|
|
05-02-2012
|
4.50
|
Trial installed the Wings and installed the Flaper
|
Details
|
|
|
03-25-2012
|
1.00
|
Torqued the bolts and installed the brake discs
|
Details
|
|
|
03-24-2012
|
2.00
|
Installed tire on second main wheel
|
Details
|
|
|
02-06-2012
|
2.50
|
Installed tire on one main wheel
|
Details
|
|
|
12-28-2011
|
6.00
|
Unloaded airplane into hangar and fitted the wings
|
Details
|
|
|
12-21-2011
|
1.50
|
Assembled nosewheel
|
Details
|
|
|
11-23-2011
|
2.00
|
Worked on Flaperon Mixer Bellcrank and brackets
|
Details
|
|
|
11-22-2011
|
0.50
|
Prepped wireway and ELT brackets
|
Details
|
|
|
11-17-2011
|
1.50
|
Work on bushings of control sticks
|
Details
|
|
|
11-12-2011
|
3.00
|
Work on control sticks
|
Details
|
|
|
11-09-2011
|
1.00
|
Replaced auxiliary audio output jack
|
Details
|
|
|
11-08-2011
|
1.00
|
Installed auxiliary audio output jack
|
Details
|
|
|
11-03-2011
|
2.00
|
Installed PTT switches in control sticks
|
Details
|
|
|
10-31-2011
|
1.00
|
Worked on the control stick hand grips
|
Details
|
|
|
10-29-2011
|
3.00
|
Installed headset jacks and power outlet
|
Details
|
|
|
10-26-2011
|
1.50
|
Work on optional harness, Reed switches and pins
|
Details
|
|
|
10-25-2011
|
2.00
|
Work on Reed switches and Spar Pins
|
Details
|
|
|
10-24-2011
|
1.50
|
More work on Reed switches
|
Details
|
|
|
10-23-2011
|
2.00
|
Installed Reed switches
|
Details
|
|
|
10-10-2011
|
2.00
|
Wired the Fuel Pump
|
Details
|
|
|
10-09-2011
|
4.00
|
Installed Tunnel Harness
|
Details
|
|
|
09-18-2011
|
3.00
|
Routed cables from panel to center section
|
Details
|
|
|
09-13-2011
|
1.00
|
Replaced the epoxy in the Pin Stoppers
|
Details
|
|
|
09-12-2011
|
1.00
|
Work on Fuselage Pins
|
Details
|
|
|
08-13-2011
|
1.50
|
More parts inventory
|
Details
|
|
|
08-09-2011
|
0.50
|
Inventory of Subkit #3
|
Details
|
|
|
08-07-2011
|
1.00
|
Inventory of Subkit #4 and hardware bag
|
Details
|
|
|
07-30-2011
|
1.00
|
Started inventory of Finishing Kit
|
Details
|
|
|
07-28-2011
|
0.50
|
Finishing Kit arrives
|
Details
|
|