My RV-12 Build Log
Work Logs Found: 288
Category Work Time: 838 Hours
 Date
Hours
Work Log Summary

Details

 04-17-2018
1.00
Work on left main wheel fairing
Details
     

 04-15-2018
4.00
Work on wheel fairings
Details
       

 04-14-2018
2.00
Work on right main wheel fairings
Details

 04-08-2018
3.00
Work on main wheel fairings
Details
       

 04-07-2018
3.00
Work on wheel fairings
Details
     

 03-18-2018
4.00
Trimmed wheel fairings
Details
       

 03-17-2018
3.00

Details
       

 03-15-2018
1.00
Installed right wheel and fairing bracket
Details
       

 02-25-2018
2.00
Work on nose leg and nose wheel fairings
Details
       

 02-24-2018
2.00
Nose leg fairing work
Details
       

 02-19-2018
0.50
Work on nose gear leg fairing
Details

 02-11-2018
1.50
Work on nose leg fairing
Details
       

 01-28-2018
1.50
Redrilled holes in nose leg, fixed fuel leak
Details

 01-20-2018
0.50
Covered holes in nose leg with epoxy
Details

 01-14-2018
1.00
Work on nose leg fairing
Details
       

 01-13-2018
2.00
Work on nose leg fairing
Details
       

 01-01-2018
1.00
Nose leg fairing
Details
     

 12-31-2017
2.50
Nose wheel fairing
Details
       

 11-23-2017
1.00
Cut opening for main gear legs in fairings
Details
     

 11-11-2017
3.00
100 hour engine maintenance
Details
       

 11-05-2017
3.00
Wheel fairings
Details
       

 11-04-2017
1.50
Wheel fairings
Details

 10-29-2017
2.00
Wheel fairings
Details
       

 10-15-2017
4.00
Work on wheel fairings
Details
     

 10-09-2017
3.50
Work on wheel fairings
Details
       

 10-08-2017
5.00
Work on Nose Wheel fairing
Details
       

 10-07-2017
6.00
Nose Fork Upgrade and Wheel Fairing work
Details
       

 10-01-2017
0.50
Worked on wheel fairings
Details
     

 12-30-2016
4.00
Checked brake lines, placed original panel screws
Details

 12-29-2016
5.00
Replaced brakelines, tightened fittings
Details
       

 12-28-2016
2.00
Replaced more panel screws
Details
     

 12-18-2016
2.00
Replaced Panel screws, installed fire extinguisher
Details
       

 12-17-2016
1.00
Tightened landing gear bolts, checked for leaks
Details
       

 11-24-2016
4.00
Prepped aircraft for DAR inspection
Details

 11-22-2016
1.50
Worked on "Squawk" items
Details
     

 11-20-2016
2.50

Details
     

 11-19-2016
1.50
Fix items in the "squawk" list
Details
     

 11-18-2016
2.00
Helped A&P with initial condition inspection
Details

 11-13-2016
3.00
SV Backup Battery test
Details
     

 11-12-2016
2.00
Fuel calibration
Details
       

 11-11-2016
5.50
Drained fuel, repositioned fuel line
Details
       

 11-05-2016
5.00
Fuel System Calibration
Details
       

 11-04-2016
1.00
Redid Weight and Balance
Details
     

 11-03-2016
2.00
Weight and Balance
Details
       

 11-01-2016
2.00
Weight and Balance
Details
     

 10-12-2016
1.00
Riveted the Canopy Catch
Details
       

 10-10-2016
2.50
Prepped Canopy Catch parts, did Nose Fork SB
Details
       

 10-05-2016
1.50
Worked on SB, installed cover plates and carpet
Details
       

 10-02-2016
6.00
Painted gear legs, installed covers and fairings
Details
       

 09-18-2016
4.00
Tech Counselor visit, installed tie down ring
Details
       

 09-17-2016
4.00
Systems check, installed Wing Walk
Details
       

 09-11-2016
3.00
Cleaned Canopy, Placard and Systems check
Details
       

 09-10-2016
5.50
Work on right wheel assemby and Canopy
Details
       

 09-07-2016
1.50
Worked on left wheel assemby and brake.
Details
       

 09-05-2016
3.50
Installed Wings and Canopy
Details
       

 09-04-2016
3.00
Covered avionics bay, fixed Fuse Pin Stoppers
Details
       

 09-03-2016
4.00
Secured wires, installed Fuse Side Covers
Details
       

 08-28-2016
3.00
Installed gasket at wing root. Worked on radio.
Details
       

 08-27-2016
3.00
Worked on Audio and Landing Gear bolts
Details
     

 08-21-2016
2.50
Add Wires to Radio, Checked landing gear bolts
Details
       

 08-18-2016
3.00
Installed ELT Bracket, did hangar clean up.
Details
       

 08-14-2016
3.00
Replaced Canopy Gas Struts, Installed Steps
Details
       

 08-13-2016
2.50
Assebled Fuse Pins, placed placard
Details
       

 08-07-2016
3.00
Worked on radio again, checked headset jacks
Details
     

 08-06-2016
3.50
Painted Fuselage Pins, cleaned aircraft surfaces
Details
       

 07-31-2016
3.00
Work on Canopy and Fairing
Details
       

 07-30-2016
3.00
Work on Fuselage Pins and Canopy Fairing
Details
       

 07-24-2016
2.00
More cleaning of the skins
Details
       

 07-23-2016
4.00
Clean up of aluminum skins
Details
       

 07-17-2016
4.00
Installed placards and cleaned the skins
Details
       

 07-16-2016
6.00
Installed Aft Window
Details
       

 07-09-2016
4.00
Trimmed fuel vent line, cleaned aircraft surfaces
Details
       

 07-06-2016
2.50
Installed placards and upholstery pieces
Details
       

 07-04-2016
3.50
Installed Data Plate, sealed Canopy Fairing
Details
       

 07-03-2016
3.00
Work on interior, Canopy Fairing and COM
Details
       

 07-02-2016
4.00
Fitting and installation of upholstery
Details
       

 06-26-2016
2.50
Worked on COM radio, installed placard
Details
     

 06-25-2016
3.00
Updated Aux Music Jack wires, place upholstery
Details
       

 06-19-2016
3.00
Work on radio, sanded the Canopy Fairing
Details

 06-18-2016
4.00
Reviewed Pre-start procedure, Canopy Fairing work
Details
       

 06-12-2016
3.00
Connected Aux Music Jack wires, worked on ICS
Details
       

 06-11-2016
3.50
Checked prop pitch and tracking
Details
       

 06-08-2016
1.50
Tested fuel flow rate
Details
     

 06-05-2016
3.00
Fuel system check, Canopy Fairing work
Details
       

 05-30-2016
3.50
Pitot/Static system work, replaced Aux Music Jack
Details
       

 05-29-2016
2.00
Troubleshooting Pitot System leak
Details
       

 05-28-2016
3.00
Purged oil system, Pitot system test
Details
       

 05-12-2016
4.00
Flight Controls and Systems checks
Details
       

 05-07-2016
4.00
Work on Trim and tested Aux Music jack
Details
       

 04-17-2016
2.00
Worked on wiiring in L Fuselage, installed Nav lig
Details
       

 04-16-2016
3.50
Fuselage and Avionics wiring correction
Details
       

 04-10-2016
3.00
Tested Trim Servo. Removed L80 and L82 wires
Details
       

 04-09-2016
3.00
Looking for source of short circuit
Details

 04-02-2016
2.50
Still working on wiring issues
Details

 03-30-2016
2.50
Reversed headset harness connections
Details
       

 03-27-2016
2.00
Checked Left Fuselage electrical connections
Details
       

 03-26-2016
2.00
Looking for source of short circuit
Details
       

 03-22-2016
0.50
Check for short in Strobe Power wiring
Details

 03-20-2016
1.50
Wiring checks
Details
       

 03-19-2016
2.00
Tested wiring to look for source of short circuit
Details

 03-13-2016
3.00
Checked fuselage wiring
Details
       

 03-05-2016
3.00
Systems Testing and put washers under screws
Details
       

 02-28-2016
1.00
Put washers under canopy screws & Systems Testing
Details
     

 02-20-2016
1.00
Moved the Canopy and trimmed the fairing
Details
       

 02-14-2016
2.00
Peeled the Canopy Fairing from the Fuselage
Details
       

 02-13-2016
4.00
Sanded Canopy Fairing and drilled pivot holes
Details
       

 02-06-2016
1.00
Applied UV Smooth Prime on Canopy Fairing
Details
       

 01-24-2016
2.00
Sanded the Canopy Fairing
Details
       

 01-10-2016
2.50
Filled low areas on the Canopy Fairing
Details
       

 01-09-2016
4.00
Squeezed the Stabilator and Rudder
Details
       

 01-03-2016
2.00
Squeezed Flaperons and more Canopy Fairing work
Details
       

 01-02-2016
1.50
Work on Canopy Fairing
Details
       

 01-01-2016
2.00
Work on Canopy Fairing
Details
       

 12-30-2015
3.00
Sanded Canopy Fairing
Details
       

 12-29-2015
4.00
Work on Canopy Fairing
Details
       

 12-28-2015
6.00
Work on Canopy Fairing
Details
       

 12-27-2015
3.00
Work on Canopy, Trimmed Flaperon skins
Details
       

 12-20-2015
3.50
Removed old sealant & put Flox on Canopy Foams
Details
       

 12-19-2015
4.00
Removed Canopy Fairing
Details
       

 12-13-2015
4.50
Installed Canopy & Wings, Latch Warning work
Details
       

 12-12-2015
1.00
Checked movement of controls and attachments
Details
     

 12-06-2015
3.00
Installed Canopy Seals and Koger Shade
Details
       

 12-05-2015
3.00
Installed Placards on Panels, riveted extensions
Details
       

 11-29-2015
4.50
Installed Latch Plate and Microswitch on Roll Bar
Details
       

 11-22-2015
4.00
Installed Fuel Tank
Details
       

 11-21-2015
2.00
Put brake fluid in system
Details
       

 11-13-2015
3.50
Re-installed brake line fittings
Details
       

 11-11-2015
2.00
Reversed orientation of CPU fans
Details
       

 11-07-2015
5.00
Brake line bleeding, trimmed prop gap fillers
Details
       

 11-01-2015
5.00
Installed new spar pin switch, purged brake lines
Details
       

 10-31-2015
2.50
Spar Pin Switch Upgrade
Details
       

 10-17-2015
4.00
Final stab cable adjustment, fuel pump noise filte
Details
       

 10-12-2015
3.00
Installed propeller and another spacer
Details
       

 10-11-2015
4.50
Check stab cable tension, cut spring in flap handl
Details
       

 10-10-2015
3.00
Work on Stabilator cables
Details
       

 10-03-2015
2.00
Fuel Vent Lines install, Tunnel Pocket trial insta
Details
       

 09-27-2015
4.00
Work on Stab cables, shoulder harness, etc
Details
       

 09-26-2015
5.00
Installed Stabilator and cables
Details
       

 09-20-2015
3.00
Connected rudder cables
Details
       

 09-19-2015
6.00
Installed Map Box, Rudder and Cables
Details
       

 09-12-2015
6.00
Secured brake lines and wiring
Details
       

 08-30-2015
3.00
Work on flight controls
Details
       

 08-01-2015
4.00
Work on the Canopy Latch
Details
       

 07-25-2015
3.50
Check cylinder heads, disconnected Fuel Rtn Assy
Details
       

 07-19-2015
2.00
Redid the Fuel Return Line Aft
Details

 07-18-2015
3.00
Work on Wing electrical connector & Fuel vent line
Details
       

 07-12-2015
3.00
Electrical work on ELT, wings and headsets
Details
       

 07-11-2015
4.00
Fuel Tank Vent Modification, checked Emp. bolts
Details
       

 07-05-2015
3.00
Installed safety belts and anti-abrasion strip
Details
       

 06-21-2015
2.00
Work on the Rudder Cables
Details
       

 06-20-2015
3.00
Work on Rudder Cables
Details
       

 06-14-2015
5.00
Work on flight controls, rudder
Details
       

 09-13-2014
4.50
Trimmed inboard wing skins.
Details
       

 08-23-2014
4.00
Final-drilled holes in Flaperon Torque Arms & Tube
Details
       

 08-22-2014
2.00
Drilled hoes in Flaperon Torque Tubes
Details
       

 08-17-2014
2.50
Positioned Flaperon Torque Tubes for drilling
Details
       

 07-05-2014
2.00
Canopy latch switch retrofit
Details
       

 06-30-2014
0.50
Prepped ADAHRS Stiffener
Details
     

 03-15-2014
2.00
More work on cowling and started work on FWF
Details
       

 03-12-2014
1.00
Primed the Fuel Tank and the Neck
Details
       

 03-02-2014
3.50
Drilled holes in Top Cowl and sanded edges
Details
       

 03-01-2014
4.00
Work on cowl hinges
Details
       

 02-28-2014
4.50
More work on cowling
Details
       

 02-27-2014
7.00
Work on cowling and inventoried parts
Details
       

 02-19-2014
1.00
Retested fuel tank for leaks
Details

 02-16-2014
1.50
Fuel tank leak test
Details
       

 02-08-2014
2.00
Completed service bulletins for fuel tank
Details
     

 01-25-2014
1.50
Fuel tank vent modification
Details
       

 01-20-2014
5.50
Installed Fuel Tank Vent, Gauge and nutplates
Details
       

 01-19-2014
5.00
Fuel Tank Attach Modification
Details
       

 01-18-2014
4.00
Fuel Tank Attach Modification
Details
       

 01-01-2014
1.50
Fuel Tank Mods work
Details
       

 12-29-2013
4.00
Fuel Tank Modifications
Details
       

 12-22-2013
4.50
Work on Fuel Tank mods and Cowl Hinges
Details
       

 12-21-2013
1.50
Work on Cowl, Hinge Pins and Fuel Tank parts
Details

 12-20-2013
1.50
Made 2 Hinge Pins and prepped Fuel Tank for mods
Details
       

 12-01-2013
4.00
Work on Cowl and Hinge Pins
Details
       

 11-30-2013
1.50
Work on Top Cowl
Details
       

 11-24-2013
1.50
Prepped Oil Door and hinge parts, and rudder links
Details
       

 11-21-2013
4.00
Installed Flaperon Pushrod Assembly and AP Servo
Details
       

 11-11-2013
4.00
Installed Flap/Pushrod & Ctrl Stick Pushrod Assemb
Details
       

 10-08-2013
4.50
Drilled holes in Canopy Fairing, assembled latch
Details
       

 09-29-2013
2.00
Glued the Canopy Fairing to the Fuselage
Details
     

 09-28-2013
0.50
Sanded the canopy foams some more
Details

 09-25-2013
0.50
Sanded the Canopy Foams
Details

 09-22-2013
4.00
Trimmed Canopy Fairing
Details
       

 09-21-2013
3.50
Scuffed canopy and skirt, marked fairing for trimm
Details
       

 09-07-2013
3.00
Trial fit of Canopy Latch, riveted Latch Block
Details
       

 09-02-2013
2.00
Shaped the Canopy Foams
Details
       

 09-01-2013
4.00
Trimmed the Canopy Foams and glued to the Frame
Details
       

 08-31-2013
5.00
Installed Canopy, Skirts, Guide Plates & Latch Han
Details
       

 08-30-2013
1.00
Filed Aft Window edges, shaped Canopy Handle
Details
     

 08-24-2013
3.00
Primed and painted the Canopy Frame
Details
       

 08-23-2013
3.00
Canopy work
Details
       

 08-18-2013
2.00
Canopy work
Details
       

 08-12-2013
4.00
More Canopy work.
Details
       

 08-04-2013
3.50
Tapped holes in Roll Bar and filed the Canopy
Details
     

 08-03-2013
4.00
Tailcone and Canopy work
Details
       

 07-28-2013
5.00
More Canopy work
Details
       

 07-27-2013
5.00
Canopy work
Details
       

 07-21-2013
2.00
Canopy and Instrument Panel work
Details
       

 07-20-2013
4.50
Canopy, Instrument Panel and Avionics work
Details
       

 06-29-2013
5.50
Canopy frame work and avionics wiring
Details
       

 06-23-2013
4.50
Work on Canopy Frame
Details
       

 06-19-2013
3.00
Stiffener Retrofit work
Details
       

 06-16-2013
4.00
Firewall Stiffener retrofit and APDC wiring work
Details
       

 06-15-2013
6.00
Stiffener Retrofit
Details
       

 05-06-2013
0.50
Primed and painted the MOD Rib
Details

 05-05-2013
3.00
Installed Over Rudder Wireway
Details
     

 04-13-2013
2.50
Tightened axle nuts and Nose Fork Assembly
Details
       

 03-17-2013
2.50
Drilled hole in Firewall and tapped holes in Nose
Details
       

 03-16-2013
5.50
Fabricated Caliper Brake Lines
Details
       

 03-10-2013
3.50
Installed main wheels, nose gear and anti-rotation
Details
       

 03-09-2013
5.00
Bolted main gear axles, installed nose gear
Details
       

 02-24-2013
4.00
Riveted right side skin doublers, attached right g
Details
       

 02-23-2013
5.00
Riveted left side skin doublers and attached left
Details
       

 02-18-2013
4.00
Landing gear modification and more
Details
       

 02-17-2013
4.00
Landing gear modification
Details
       

 02-16-2013
3.00
Landing Gear modification
Details
       

 02-02-2013
5.50
Landing gear modification
Details
       

 02-01-2013
1.00
Worked on landing gear mod parts
Details
       

 01-28-2013
1.50
Primed Side Skin Doublers and Stiffener angles
Details
     

 01-27-2013
4.50
Landing gear modification
Details
       

 01-26-2013
2.50
Landing Gear modification
Details
       

 01-01-2013
4.00
Landing Gear modification
Details
       

 12-22-2012
3.50
Work on Skyview wiring upgrade and SB 12-11-09
Details
       

 12-09-2012
4.00
Replaced aft fuel return line, worked on avionics
Details
       

 12-08-2012
5.00
Finished righ wing wiring upgrade, changed fuel li
Details
       

 11-25-2012
5.00
Right wing wiring upgrade
Details
       

 11-24-2012
6.00
Wing wiring upgrade
Details
       

 11-22-2012
2.50
Installing new wing wires
Details
       

 11-18-2012
4.50
Reinstalled Pushrod Assembly, etc
Details
       

 11-16-2012
0.50
Primed Parts
Details
     

 11-11-2012
2.50
Installed OAT Probe and ADAHRS
Details
       

 11-10-2012
5.00
Fabricated Servo Pushrod Assemblies, Static line w
Details
       

 11-09-2012
1.00
Primed parts and riveted nutplates
Details
       

 11-07-2012
1.50
Worked on Rudder Pedal Access Covers
Details
       

 11-01-2012
0.50
Drilled out rivets from map box door
Details
     

 10-28-2012
4.50
Installed ELT and put spacers to Flaperon Torque T
Details
       

 10-27-2012
5.00
Installed Servo Trim Wire Upgrade
Details
       

 10-26-2012
6.00
Instrument Panel and Map Box work
Details
       

 10-08-2012
3.50
Fitted and trimmed Flap Handle Tube, etc
Details
       

 10-07-2012
6.00
Fabricated flight control parts
Details
       

 10-06-2012
3.00
Installed the Flap Handle/Pushrod Assembly
Details
       

 10-05-2012
1.00
Riveted Flap Handle Forks and Flap Detent parts
Details
       

 10-04-2012
1.00
Drilled holes in the Flap Detent Angle
Details
     

 10-03-2012
1.00
Drilled holes in the the Map Box Door and hinge
Details
       

 09-27-2012
0.50
Primed the Tunnel Pocket parts
Details
     

 09-26-2012
1.00
Painted map box and POH tray
Details
       

 09-23-2012
4.50
Work on map box, POH tray & tunnel pocket
Details
       

 09-22-2012
5.50
Installed new Inst and Com Supports, did other wor
Details
       

 09-20-2012
1.00
Work on Flap control parts
Details
     

 09-19-2012
1.00
Work on Servo upgrade and Instrument Panels
Details
       

 09-17-2012
1.00
Work on hardware for Skyview upgrade
Details
     

 09-05-2012
0.50
Primed New Servo Tray and Com Supports
Details
     

 08-30-2012
2.00
Riveted nutplates to Inst Stack Angles
Details
       

 08-29-2012
2.50
New inst stack angles and ADAHRS bracket work
Details
       

 08-26-2012
5.00
Modifications for Skyview upgrade
Details
       

 06-11-2012
3.00
Made the Flap Handle/Pushrod Assembly
Details
       

 05-02-2012
4.50
Trial installed the Wings and installed the Flaper
Details
       

 03-25-2012
1.00
Torqued the bolts and installed the brake discs
Details
       

 03-24-2012
2.00
Installed tire on second main wheel
Details
       

 02-06-2012
2.50
Installed tire on one main wheel
Details
       

 12-28-2011
6.00
Unloaded airplane into hangar and fitted the wings
Details
       

 12-21-2011
1.50
Assembled nosewheel
Details
       

 11-23-2011
2.00
Worked on Flaperon Mixer Bellcrank and brackets
Details
       

 11-22-2011
0.50
Prepped wireway and ELT brackets
Details
     

 11-17-2011
1.50
Work on bushings of control sticks
Details
       

 11-12-2011
3.00
Work on control sticks
Details
       

 11-09-2011
1.00
Replaced auxiliary audio output jack
Details
       

 11-08-2011
1.00
Installed auxiliary audio output jack
Details
       

 11-03-2011
2.00
Installed PTT switches in control sticks
Details
       

 10-31-2011
1.00
Worked on the control stick hand grips
Details
       

 10-29-2011
3.00
Installed headset jacks and power outlet
Details
       

 10-26-2011
1.50
Work on optional harness, Reed switches and pins
Details
       

 10-25-2011
2.00
Work on Reed switches and Spar Pins
Details
       

 10-24-2011
1.50
More work on Reed switches
Details
       

 10-23-2011
2.00
Installed Reed switches
Details
       

 10-10-2011
2.00
Wired the Fuel Pump
Details
       

 10-09-2011
4.00
Installed Tunnel Harness
Details
       

 09-18-2011
3.00
Routed cables from panel to center section
Details
       

 09-13-2011
1.00
Replaced the epoxy in the Pin Stoppers
Details

 09-12-2011
1.00
Work on Fuselage Pins
Details
       

 08-13-2011
1.50
More parts inventory
Details
       

 08-09-2011
0.50
Inventory of Subkit #3
Details
     

 08-07-2011
1.00
Inventory of Subkit #4 and hardware bag
Details
       

 07-30-2011
1.00
Started inventory of Finishing Kit
Details
       

 07-28-2011
0.50
Finishing Kit arrives
Details
     