BEZJet Build
Work Logs Found: 42
Category Work Time: 168 Hours
 Date
Hours
Work Log Summary

Details

 03-01-2014
3.00
Completed the T-Bar Installation
Details
       

 02-23-2014
4.00
Installed T-Bar for Left Strake
Details
     

 02-01-2014
10.00
Installed Left Strake Baffels and Bulkheads
Details
       

 01-12-2014
8.00
Left Strake Baffles and Bulkheads
Details
       

 12-14-2013
3.00
Installing Bulkheads in Left Strake
Details
       

 12-14-2013
6.00
Installation of the Right Fuel Blister
Details
       

 11-24-2013
4.00
Lower Left Strake Installation
Details
       

 11-23-2013
4.00
Right Strake almost ready to close
Details
       

 11-16-2013
6.00
Top Right and Bottom Left Strake Install
Details
       

 11-12-2013
6.00
Fitting Gear Door
Details
       

 11-11-2013
4.00
Installed Left Wheel Well Tub and Gear Door
Details
       

 10-12-2013
8.00
Prepairing the Top Right Strake for close out
Details
       

 10-06-2013
3.00
Installing Hyd Tubes
Details
     

 10-04-2013
6.00
Completed Baffel fitting
Details
       

 09-29-2013
6.00
Installation of Baffles and wiring conduit
Details
       

 09-28-2013
2.00
Installing Baffles
Details
       

 09-28-2013
8.00
Installed Hyd/Brake Lines and Bulkhead
Details
       

 09-15-2013
3.00
Installed MLG Hyd Tubes in Tank
Details
       

 09-14-2013
3.00
Installed Hyd Bulk head fittings
Details
       

 09-07-2013
3.00
Fitting Top Strake Shell
Details
       

 09-01-2013
8.00
Installing Fuel Barrier Ribs in Right Strake
Details
       

 07-21-2013
5.00
Top Left Strake Construction
Details
     

 07-16-2013
1.00
Marker Becon antenna installed
Details
       

 07-16-2013
3.00
Baffles glassed
Details
       

 07-11-2013
2.00
Right Strake Baffels
Details
       

 07-09-2013
2.00
Strake Baffels
Details
       

 07-02-2013
2.00
Recessed area for wheel well in top right strake
Details
       

 06-30-2013
6.00
Layed up Top Right Strake
Details
       

 06-30-2013
3.00
Attaching Lower Right Strake
Details
       

 06-27-2013
0.50
Trial Fitting Top Right Strake
Details
       

 06-23-2013
2.00
Fitted Right Strake
Details
       

 06-19-2013
2.00
MLG Tub inside layup
Details
       

 06-11-2013
2.00
MLG Colseout of Door
Details
       

 06-09-2013
3.00
Fitting MLG Door
Details
       

 06-08-2013
3.00
Bonded Wheel well onto lower strake
Details
       

 06-03-2013
4.00
Cut out Right MLG Door
Details
       

 06-01-2013
2.00
Fitting the Bottom Right Strake
Details
       

 05-08-2013
2.00
Left Strake Delamination
Details
       

 05-05-2013
8.00
Layed up Both Lower Strakes
Details
       

 04-26-2013
2.00
Bagging the Lower Left Strake
Details
       

 04-15-2013
2.00
Layed up Bottom Right Strake
Details
       

 08-26-2011
4.00
Completed Fuselage Cut out for Strakes
Details
       