Date
|
Hours
|
Work Log Summary
|
Details
|
05-01-2016
|
2.00
|
Sign off- issue Temp Aiarwothiness
|
Details
|
|
|
04-22-2016
|
0.50
|
Installed A/C Data Plate
|
Details
|
|
|
04-20-2016
|
1.50
|
Finished installing wings Ready for inspection
|
Details
|
|
|
04-18-2016
|
5.00
|
Fixed Pitot/AOA leaks
|
Details
|
|
|
04-15-2016
|
5.00
|
Trouble shooting pitiot /AOA line leaks
|
Details
|
|
|
04-15-2016
|
2.50
|
Repaired aft cargo bulkhead riveting error
|
Details
|
|
|
04-13-2016
|
4.00
|
Testing Pitot System
|
Details
|
|
|
04-12-2016
|
4.00
|
Update Dynon, Fix Pitot leak
|
Details
|
|
|
04-11-2016
|
3.00
|
Completed install of tail cone
|
Details
|
|
|
04-08-2016
|
2.00
|
Added Fiberglas to upper and lower tailcone
|
Details
|
|
|
04-06-2016
|
3.00
|
Fitting tail cone and adding lead weight
|
Details
|
|
|
03-29-2016
|
3.00
|
Working on ballasting Tail Cone
|
Details
|
|
|
02-12-2016
|
2.00
|
Preping for Tail Cone Ballast
|
Details
|
|
|
02-09-2016
|
2.00
|
Installed Grab Bar on Instrument panel
|
Details
|
|
|
02-01-2016
|
3.50
|
Measured a/c for wt./Bal., Fixed strobe/nav light
|
Details
|
|
|
01-29-2016
|
2.50
|
Worked on landing light lens and strobe problem
|
Details
|
|
|
01-29-2016
|
1.50
|
Weighed aicraft
|
Details
|
|
|
01-25-2016
|
1.50
|
Drained fuel for weighing, Trouble shooting strobe
|
Details
|
|
|
01-24-2016
|
1.50
|
Installed wing walks, steps and strobes
|
Details
|
|
|
01-22-2016
|
5.00
|
Asssembled wings to Fuselage
|
Details
|
|
|
01-18-2016
|
3.00
|
Completed canpoy seal
|
Details
|
|
|
01-15-2016
|
1.50
|
Trimmed rear canopy seal retainer and installed it
|
Details
|
|
|
01-12-2016
|
2.00
|
Prepped and painted rear canopy retainer
|
Details
|
|
|
01-11-2016
|
2.00
|
Working on Canopy Seal Parts
|
Details
|
|
|
12-30-2015
|
2.00
|
Installed new battery, Installed instrument panel
|
Details
|
|
|
12-28-2015
|
3.00
|
Repositioned horizontal sabilizer
|
Details
|
|
|
12-08-2015
|
3.00
|
Reassembling after paint
|
Details
|
|
|
11-18-2015
|
6.00
|
Installed Tail parts
|
Details
|
|
|
11-17-2015
|
3.00
|
Reinstalling Instrument Panel
|
Details
|
|
|
11-01-2015
|
0.00
|
Visited Paint shop to view progress
|
Details
|
|
|
10-23-2015
|
0.00
|
Panel Engraving Complete
|
Details
|
|
|
09-25-2015
|
3.50
|
Removed Instrument panel for labeling and powder c
|
Details
|
|
|
09-23-2015
|
4.00
|
Disassembly for paint
|
Details
|
|
|
09-16-2015
|
2.00
|
Paint Prep, Set Nose gear friction
|
Details
|
|
|
09-15-2015
|
2.00
|
Attempted Dynon RV-12 update fo 5th time
|
Details
|
|
|
09-07-2015
|
2.50
|
Dynon update
|
Details
|
|
|
08-27-2015
|
2.50
|
Started on Nose Gear Faring. Wiroked on finish of
|
Details
|
|
|
08-25-2015
|
3.00
|
Completed installation of oil door in upper cowl
|
Details
|
|
|
08-24-2015
|
3.00
|
Finished fitting oil door. Installed doubler
|
Details
|
|
|
08-20-2015
|
1.50
|
Started installation of Oil door in uper cowl
|
Details
|
|
|
08-18-2015
|
5.00
|
Installed canopy and cowl
|
Details
|
|
|
08-17-2015
|
2.00
|
Trouble shot Dynon backup battery
|
Details
|
|
|
08-14-2015
|
1.50
|
Resealed,Hydraulic brake fitting
|
Details
|
|
|
06-29-2015
|
3.00
|
painting aft turtle deck inbd skin, fibrelass sant
|
Details
|
|
|
06-24-2015
|
2.00
|
Cowl work, started putting on aft cabin skins
|
Details
|
|
|
06-11-2015
|
3.00
|
Reinstalled Dynon backup battery, worked on cowl
|
Details
|
|
|
05-19-2015
|
2.50
|
Misc. fixes
|
Details
|
|
|
04-30-2015
|
3.00
|
Repared flare on Fuel Line
|
Details
|
|
|
04-28-2015
|
2.50
|
More nutplate tapping, Part fitting
|
Details
|
|
|
04-23-2015
|
3.50
|
Misc. Problems
|
Details
|
|
|
04-16-2015
|
4.00
|
Fabricated 6 Bushings, Inatalled Seat Belts ect
|
Details
|
|
|
04-09-2015
|
3.00
|
Still putting stuff back togther
|
Details
|
|
|
04-06-2015
|
2.10
|
Reassemblng after installing SB 14-12-06
|
Details
|
|
|
02-13-2015
|
4.00
|
Completed SB 14-11-03 Wing doublers
|
Details
|
|
|
02-10-2015
|
2.50
|
Completed Canopy switch install.
|
Details
|
|
|
02-09-2015
|
5.00
|
Installed canopy lock switch hardware
|
Details
|
|
|
11-24-2014
|
3.00
|
Finishing fiberglass up on Cowl and Canopy
|
Details
|
|
|
11-21-2014
|
8.00
|
More work on cowls , split top from bottom
|
Details
|
|
|
11-11-2014
|
3.00
|
More sanding and filling on lower cowl
|
Details
|
|
|
11-07-2014
|
5.00
|
More fiberglass work
|
Details
|
|
|
11-04-2014
|
3.00
|
Added filler to cowl. Worked on wiring
|
Details
|
|
|
11-03-2014
|
2.50
|
Trouble shoot oil pressure problem
|
Details
|
|
|
10-31-2014
|
6.00
|
Working on Fibreglassing lower cowl
|
Details
|
|
|
09-08-2014
|
1.80
|
Started on ADAHR stiffner install
|
Details
|
|
|
08-25-2014
|
1.50
|
Added Fibreglass to the exterior of the bottom cow
|
Details
|
|
|
08-14-2014
|
1.50
|
Continued working on the lower cowl fibreglass
|
Details
|
|
|
08-12-2014
|
1.50
|
Started the fibreglass work on the lower cowl
|
|
|
|
08-08-2014
|
1.00
|
Added cushion clamps to support heater inlet hose
|
Details
|
|
|
08-04-2014
|
1.50
|
Reinstalled flaperon control rods
|
Details
|
|
|
07-11-2014
|
1.00
|
Working on installation of flaperon control rods
|
Details
|
|
|
07-08-2014
|
1.00
|
Still working on the rear tunnel cover nutplates
|
Details
|
|
|
07-07-2014
|
2.00
|
Repairing rear tunnel nutplates
|
Details
|
|
|
07-05-2014
|
2.50
|
Grounded Oil Pressure Transducer, Removed floor pa
|
Details
|
|
|
06-24-2014
|
3.00
|
Reinstalled floor panels. First full power runup
|
Details
|
|
|
06-23-2014
|
2.00
|
Rerouted the lower elevator cable
|
Details
|
|
|
05-08-2014
|
3.00
|
Trouble shoot Control Cables
|
Details
|
|
|
05-06-2014
|
2.50
|
Checking things out
|
Details
|
|
|
05-05-2014
|
2.50
|
Misc. Projects
|
Details
|
|
|
05-03-2014
|
3.00
|
Fixed hyd. leak, Reinstalled canopy, Improved cano
|
Details
|
|
|
05-02-2014
|
3.50
|
Filled fibreglass fairing using mocro beads
|
Details
|
|
|
04-30-2014
|
1.00
|
Worked on fiberglass on canopy
|
Details
|
|
|
04-28-2014
|
2.50
|
Working on Canopy Fairing, First run with prop
|
Details
|
|
|
04-17-2014
|
3.00
|
Started rework on fibreglass on canopy
|
Details
|
|
|
04-15-2014
|
4.00
|
REmoved canopy, riveted aft cabin l.h. side, Fitte
|
Details
|
|
|
04-07-2014
|
3.00
|
INstalled shoulder harness, Reworked canopy shield
|
Details
|
|
|
04-04-2014
|
3.00
|
Tapped nutplates, removed canopy fairings
|
Details
|
|
|
04-02-2014
|
3.00
|
Reinstalled cowl and canopy
|
Details
|
|
|
03-28-2014
|
3.50
|
Sanded and filled new fibreglass on upper cowl
|
Details
|
|
|
03-27-2014
|
2.00
|
Fibreglassed upper cowl
|
Details
|
|
|
03-26-2014
|
2.00
|
Painted Canopy fairing
|
Details
|
|
|
03-21-2014
|
5.00
|
Installed fuel tank, Removed canopy
|
Details
|
|
|
02-24-2014
|
2.50
|
Finishe riveting and sealing fuel tank
|
Details
|
|
|
02-13-2014
|
2.00
|
Removed inlet fuel filters,completed r.h. instrume
|
Details
|
|
|
02-12-2014
|
2.00
|
Worked on fuel tank,cowling and r.h. inst panel
|
Details
|
|
|
02-11-2014
|
3.00
|
Removed ECU , Installed Guide for Cowl
|
Details
|
|
|
02-06-2014
|
2.00
|
Pressure tested fuel tank, Started modifying the u
|
Details
|
|
|
01-31-2014
|
2.50
|
Sealed doublers and fuel sender plate in place
|
Details
|
|
|
01-30-2014
|
3.50
|
Prepped fuel tank for S/B 13-12-19, Asssembled tow
|
Details
|
|
|
01-29-2014
|
3.50
|
S/B 13-12-19 Fuel Tank update
|
Details
|
|
|
01-27-2014
|
3.00
|
Drained and removed fuel tank, Retorqued block he
|
Details
|
|
|
01-09-2014
|
3.50
|
Completed upper cowl air inlet
|
Details
|
|
|
01-07-2014
|
2.50
|
Vented fuel cap, More fibreglass work
|
Details
|
|
|
01-06-2014
|
3.50
|
Worked on fitting cowl/oil cooler
|
Details
|
|
|
01-04-2014
|
4.00
|
Fibreglassing
|
Details
|
|
|
01-02-2014
|
4.00
|
Attached oil cooler duct to lower cowl
|
Details
|
|
|
12-31-2013
|
4.00
|
Started fibreglassing
|
Details
|
|
|
10-21-2013
|
4.00
|
Installed Cabin Heat control
|
Details
|
|
|
09-24-2013
|
2.50
|
Fabricated and installed engine control switch gua
|
Details
|
|
|
09-13-2013
|
3.00
|
Fihished heater electrical connection
|
Details
|
|
|
09-11-2013
|
3.00
|
Working on heaater fan electrical inatallation
|
Details
|
|
|
09-06-2013
|
2.50
|
Trouble shoot wing lighting wiring r.h side
|
Details
|
|
|
09-03-2013
|
3.00
|
nstalled hose clamps on heater, Moved fuselage and
|
Details
|
|
|
04-09-2013
|
4.00
|
Removed Radiator and ECU
|
Details
|
|
|
02-02-2013
|
0.00
|
Shutting down for Shoulder Replacement
|
Details
|
|
|
01-22-2013
|
4.00
|
Finished SB 112-11-09 - Worked on fitting cowl
|
Details
|
|
|
01-14-2013
|
3.50
|
Installed L.H. Landing Gear
|
Details
|
|
|
01-10-2013
|
3.00
|
Prepared and installed outer gear wear plates and
|
Details
|
|
|
01-09-2013
|
3.00
|
Fitting new landing gear mounts
|
Details
|
|
|
01-07-2013
|
2.00
|
Working on SB 12-11-09
|
Details
|
|
|
01-03-2013
|
5.00
|
Working on SB 12-11-09
|
Details
|
|
|
12-19-2012
|
1.50
|
SB-12-11-09
|
Details
|
|
|
11-01-2012
|
3.50
|
Trouble Shoot Auto Pilot servo power
|
Details
|
|
|
10-22-2012
|
5.00
|
C/W SB 12-09-26 and wiring
|
Details
|
|
|
09-18-2012
|
2.00
|
More Wireing
|
Details
|
|
|
09-17-2012
|
3.50
|
More engine wireing and power distribution wireing
|
Details
|
|
|
09-10-2012
|
4.00
|
More Wiring
|
Details
|
|
|
09-04-2012
|
5.00
|
Wiring
|
Details
|
|
|
08-14-2012
|
3.50
|
Modified inst panel to mount ELT and Intercom
|
Details
|
|
|
08-07-2012
|
3.00
|
Completd L.H. Fuselage Pitot/AOA connections
|
Details
|
|
|
02-09-2012
|
8.00
|
Move to new hangar in Bend
|
Details
|
|
|
11-18-2011
|
3.30
|
Completed Pitot Tube install
|
Details
|
|
|
11-17-2011
|
4.00
|
Built Tail Stand, Moved wing to table. Started Pit
|
Details
|
|
|
11-11-2011
|
1.50
|
Preparing to install the Empennage to teh Fuselage
|
Details
|
|
|
10-28-2011
|
3.50
|
Installed hardware in Flaperons, Ect.
|
Details
|
|
|
10-25-2011
|
4.50
|
Wires, clamps, noise filter
|
Details
|
|
|
08-30-2011
|
2.00
|
Organized stuff in hangar
|
Details
|
|
|
08-29-2011
|
4.00
|
Moved fuselage and tools to hangar
|
Details
|
|
|
08-29-2011
|
2.00
|
Move to Hangar
|
Details
|
|
|
08-29-2011
|
3.50
|
Helped move to hangar
|
Details
|
|