Powered By Kitlog Pro v2.0
Bills Safari Adventure
Safari
Empennage
Work Logs Found:
12
Category Work Time:
69 Hours
Date
Hours
Work Log Summary
Details
04-21-2012
4.00
Install Movable Ballast and Rotor Brace
Details
01-13-2012
8.00
Final Install of Interior Sheet Metal
Details
01-12-2012
5.00
Finalize Wiring and Install Headboard
Details
12-28-2011
12.00
Install Exhaust
Details
10-19-2011
4.00
Finish up tail and work on instrument pod
Details
10-16-2011
4.00
Finish Horizontal Stab and Governor mount
Details
10-15-2011
4.00
Horizontal Stab and Governor Bracket
Details
10-08-2011
8.00
Hook up Tail Rotor Control Cable and Misc
Details
10-03-2011
3.00
Weld up Drive Shaft and Install
Details
10-01-2011
7.00
Tail Rotor Drive Shaft and Floor
Details
09-19-2011
8.00
Plumb Transmission and Install Tailboom
Details
08-22-2011
2.00
Assemble Gas Tanks
Details
SITE NAVIGATION
Contact Builder
Safari Home
Category
# Logs
# Hours
All
150
556
Avionics
28
102
Empennage
12
69
Engine
23
81
Frame
50
196
Main Rotor
16
22
Main Transmission
5
16
Miscellaneous
8
27
None
1
3
Test Flight
1
Tools
3
16
Trailer
3
24
Copyright © 2001-2024 Matronics. All Rights Reserved.