Work Logs Found: 25
Category Work Time: 50 Hours
 Date
Hours
Work Log Summary

Details

 05-14-2012
1.50
Installed wiring runs.

 05-13-2012
4.00
Ran final magnetometer wiring. Installed flexible

 05-11-2012
2.50
Continued with wiring. Removed panel and transport

 05-09-2012
1.75
Cut the radio/transponder into the subpanel.

 05-08-2012
1.75
fitted radio/transponder in the panel

 05-07-2012
1.25
Mounting the radio/transponder stack into the pane

 05-06-2012
2.00
Fitting the radio/transponder stack into the panel

 05-05-2012
2.00
Fitting radio/transponder stack

 05-04-2012
1.75
Started assembling the radio and avionics stack.

 04-30-2012
2.00
Finished running the servo wires in the fusalage

 04-28-2012
1.75
Finished installing the ADSB wiring

 04-27-2012
1.25
Started setting up the ADSB wires to run through t

 04-26-2012
1.75
Finished wiring the ADSB connector

 04-25-2012
1.75
Finished fabricating and installing the magnetomet

 04-24-2012
1.75
Fabricated the magnetometer bracket

 01-23-2012
2.50
Installed engine control cables, Installed antenna

 01-18-2012
2.75
Installed comm antenna doubler, made doubler for t

 01-17-2012
2.75
Made doubler for comm antenna

 01-16-2012
2.00
Installed ADSB GPS antenna, and the comm whip ante

 08-29-2011
1.75
Mounted the ADS-B antenna

 08-26-2011
0.75
Finished mounting the ADS-B unit
     

 08-24-2011
1.50
ELT bracket
Details

 08-20-2011
3.75
Vertical power unit
Details

 08-19-2011
1.50
Mounting bracket for the ELT antenna

 08-18-2011
2.00
ELT install
       