Barrys RV-9A Project
RV-9A
Avionics
Work Logs Found:
25
Category Work Time:
50 Hours
Date
Hours
Work Log Summary
Details
05-14-2012
1.50
Installed wiring runs.
05-13-2012
4.00
Ran final magnetometer wiring. Installed flexible
05-11-2012
2.50
Continued with wiring. Removed panel and transport
05-09-2012
1.75
Cut the radio/transponder into the subpanel.
05-08-2012
1.75
fitted radio/transponder in the panel
05-07-2012
1.25
Mounting the radio/transponder stack into the pane
05-06-2012
2.00
Fitting the radio/transponder stack into the panel
05-05-2012
2.00
Fitting radio/transponder stack
05-04-2012
1.75
Started assembling the radio and avionics stack.
04-30-2012
2.00
Finished running the servo wires in the fusalage
04-28-2012
1.75
Finished installing the ADSB wiring
04-27-2012
1.25
Started setting up the ADSB wires to run through t
04-26-2012
1.75
Finished wiring the ADSB connector
04-25-2012
1.75
Finished fabricating and installing the magnetomet
04-24-2012
1.75
Fabricated the magnetometer bracket
01-23-2012
2.50
Installed engine control cables, Installed antenna
01-18-2012
2.75
Installed comm antenna doubler, made doubler for t
01-17-2012
2.75
Made doubler for comm antenna
01-16-2012
2.00
Installed ADSB GPS antenna, and the comm whip ante
08-29-2011
1.75
Mounted the ADS-B antenna
08-26-2011
0.75
Finished mounting the ADS-B unit
08-24-2011
1.50
ELT bracket
Details
08-20-2011
3.75
Vertical power unit
Details
08-19-2011
1.50
Mounting bracket for the ELT antenna
08-18-2011
2.00
ELT install
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
680
1647
Avionics
25
50
Canopy
69
150
Cowling
81
184
Empennage
81
178
Engine
21
63
Forward Firewall
29
80
Fuselage
95
214
Landing Gear
45
91
Miscellaneous
42
124
Paint
69
199
Wings
74
158
Wiring
49
156
Copyright © 2001-2024 Matronics. All Rights Reserved.