KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
Work Logs Found: 32
Category Work Time: 68 Hours
 Date
Hours
Work Log Summary

Details

 09-17-2014
1.00
Fairlead guides
Details
       

 09-12-2014
2.00
Pulley mount at mid spar
Details
     

 09-10-2014
1.00
Reweld grease fitting nut
Details

 11-08-2011
2.00
Aileron Bell Cranks
Details
       

 11-07-2011
1.00
Bell Cranks
Details
       

 11-05-2011
1.00
Hinge completion
Details

 10-29-2011
3.00
Hinges and Push Rods
Details

 10-27-2011
2.00
Finished up aileron drive mount
Details
       

 10-23-2011
2.00
Welding this and that
Details
       

 10-17-2011
1.00
Get back starting
Details

 09-18-2011
3.00
Aileron Hinges
Details
       

 09-17-2011
3.00
This and that
Details
       

 09-16-2011
1.00
Flap Hinges
Details
     

 09-15-2011
1.00
Hinge Work
Details

 09-14-2011
2.00
Fixing the oops
Details
       

 09-07-2011
1.50
Fix the two left problem
Details
       

 09-06-2011
1.50
Welding up Aileron Drive stuff
Details
     

 09-05-2011
7.00
Flap mechanism all welded
Details
       

 09-04-2011
5.00
Flap Drive
Details
       

 08-30-2011
2.00
1st hinge welding
Details
       

 08-29-2011
2.50
Hinges
Details
       

 08-28-2011
2.00
Odds and ends of wing steel
Details
     

 08-27-2011
2.00
Let the welding begin
Details
       

 08-25-2011
2.00
Match Drilling Hinges
Details
       

 08-24-2011
2.00
Hinges
Details
       

 08-23-2011
2.00
Hinges
Details

 08-22-2011
2.50
Flap Drive Components
Details
       

 08-21-2011
2.50
Flap Drive Components
       

 08-20-2011
3.00
Flap Drive
Details
       

 08-18-2011
2.00
Flap and Aileron drive mounts
Details
       

 08-17-2011
2.50
Aileron and Flap drive components
Details
       

 08-16-2011
0.50
Wing steel inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.