LLOYD'S WEB SITE
RV-12
Finish Kit
Work Logs Found:
90
Category Work Time:
340 Hours
Date
Hours
Work Log Summary
Details
09-01-2015
3.10
Completed installation of Nose wheel fairing
Details
08-31-2015
3.60
Working on Nose Strut fairing
Details
08-28-2015
2.50
Installed nose gear fairing on to nose gear
Details
05-08-2015
3.00
Completed Upholsery installation
Details
05-06-2015
3.00
Working on installation of upholstery
Details
05-04-2015
3.00
Completed floor install, Started Upholstery Instal
Details
09-30-2014
2.00
Installed R.H. Stabilator Tip
Details
09-29-2014
2.30
Installed L.H. stabilator tip
Details
02-26-2014
3.50
Installed Canopy Latch
Details
01-23-2014
2.00
Solved interference problem, Installed prop
Details
01-22-2014
2.00
Completed lower cowl and painted interior of both
Details
12-02-2013
4.00
Removed heater for return to Viking
Details
10-15-2013
3.00
Installed cover plate and Oil breather kit
Details
09-30-2013
2.50
Installed rear bulkhead and fuel tank
Details
09-19-2013
3.00
Completed wiring checkout for strobe and nav light
Details
09-18-2013
3.00
Still Trouble shooting the nav/strobe switch
Details
09-17-2013
2.00
Trouble shooting the Nav/Strobe switch
Details
08-26-2013
3.00
Installed heater mechanical
Details
08-22-2013
6.00
Worked on heater install
Details
08-21-2013
3.50
Worked on installing the heater
Details
08-19-2013
3.00
Completed fitting of cowl
Details
08-02-2013
3.00
Modified front of canopy skirt
Details
07-31-2013
2.50
Removed tape fron canopy fairing
Details
07-30-2013
4.50
Trimmed fairing and cemented it on to canopy
Details
07-29-2013
5.00
Installed canopy, prepping fwd fairing
Details
07-26-2013
3.00
Reinstalled cowl
Details
07-25-2013
4.50
Installed ADSB cables
Details
01-28-2013
2.50
More cowl fitting
Details
12-07-2012
6.00
Attached hinge to upper cowl
Details
12-06-2012
4.50
Ready for final fit of top cowl
Details
12-04-2012
8.00
Working on cowling
Details
11-30-2012
8.00
Fitted top cowl
Details
11-27-2012
10.00
Completed install of lower cowl
Details
11-26-2012
8.00
First fit of lower cowl
Details
10-19-2012
4.00
Installed Fuse block and Dynon 60 amp shunt
Details
10-18-2012
3.00
More wiring
Details
10-17-2012
2.50
Completed SB 12-08-09 on nose wheel fairing
Details
10-09-2012
3.00
Completed installation of master relay.
Details
10-08-2012
1.50
Installed Master relay
Details
10-02-2012
4.00
installed roll servo finished pitch servo
Details
10-01-2012
1.00
Completed install of pitch servo
Details
09-28-2012
2.80
Installed Auto Pilot Pitch Servo
Details
09-27-2012
4.80
Finishing controls assembly
Details
09-25-2012
3.00
Installed control stick links to mixer
Details
09-20-2012
3.00
Started installing flight controls
06-20-2012
2.50
Completed install of L.H. wing connector
Details
06-18-2012
2.50
Drilled holes for mounts in fuselage floor
Details
06-15-2012
4.50
Setting up the new wireing for the strobes
Details
04-09-2012
4.00
Installed spacers, Worked on fuel system
Details
03-14-2012
5.00
Installed Stabilator Cables
Details
03-12-2012
10.50
Installed Rudder Cables
Details
01-28-2012
2.50
C/W SB 11-12-14
Details
01-25-2012
3.50
Added clip to support return line fitting, Started
Details
12-23-2011
2.00
Working on nose wheel fairing
Details
12-20-2011
2.50
Finished fitting parts together
Details
12-19-2011
4.50
Working on Nose wheel fairing
Details
12-09-2011
3.50
Completed MLG wheel fairings
Details
12-06-2011
2.00
Installed nutplates on R.H. wheel fairing
Details
12-05-2011
4.50
Working on MLG Wheel Pants
Details
11-30-2011
2.00
Intalled Wheel fairing mount plates into fairing
Details
11-30-2011
2.00
Installed Cabling on Fwd Tail Cone bulkhead
Details
11-28-2011
3.00
Started Wheel Fairings
Details
10-20-2011
1.00
Installed OAT probe and harness
Details
10-20-2011
3.00
Fitted and installed wings
Details
10-18-2011
1.50
Installed Brake Lines
Details
10-17-2011
5.00
Completed puting on the landing gear
Details
10-15-2011
3.00
Installed L.H. MLG leg and Nose gear leg
Details
10-12-2011
6.00
Installed fuel drain and R.H. MLG
Details
10-11-2011
2.00
Checking Cable Routing
Details
10-10-2011
8.00
Installing cabling and brake lines
Details
09-27-2011
5.00
More cable installation
Details
09-26-2011
4.50
Pulling wires
Details
09-20-2011
5.00
Installing cabling, Setting reed switches
Details
09-19-2011
6.50
Installing cableing
Details
09-16-2011
6.00
Installed Wireing duct and Grommet
Details
09-15-2011
7.00
Install lift handles, Attached canopy to frame
Details
09-14-2011
3.50
Fabricated and installed Guide blocks
Details
09-12-2011
4.00
Final Fitting and Drilling of Canopy
Details
09-09-2011
4.00
Fitted and drilled canopy and skirts
Details
09-08-2011
3.00
Retrieved fuselage from paint shop
Details
09-08-2011
1.00
Fabricated Flaperon Push rods
Details
09-07-2011
2.50
Trimmed Canopy & Fabricated control parts
Details
09-05-2011
5.00
Moved Fuselage to paint shop
Details
09-03-2011
4.50
Prepped fuse interioar for painting
Details
09-02-2011
3.00
Fitted canopy. Fuel tank leak test good
Details
09-01-2011
6.50
Readied for interior painting
Details
08-31-2011
4.00
Working on canopy frame
Details
08-26-2011
1.00
Upholstery arrived
Details
08-10-2011
5.00
Inventory Parts
Details
08-06-2011
3.00
Unpacked crate
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
471
1538
Avionics
37
112
Empennage
37
116
Engine
54
168
Finish Kit
90
340
Fuselage
54
206
Miscellaneous
139
406
None
1
2
Shop Prep
9
22
Wings
50
166