Powered By Kitlog Pro v2.0
RV-10
RV10
Control System
Work Logs Found:
18
Category Work Time:
42 Hours
Date
Hours
Work Log Summary
Details
06-29-2015
4.00
Torque and seal Elevator Push Rods
Details
05-12-2015
2.00
Details
10-25-2013
3.00
Install Roll Servo RH Wing
Details
08-27-2013
3.00
Remove RH Aeliron Leading Edge
Details
02-24-2013
3.00
Final Install Aeliron Trim
Details
09-24-2011
1.50
Set Elevator Neutral Position
Details
09-20-2011
0.50
Make Flap Motor Spacers
Details
09-20-2011
2.50
Install Flap Torque Tubes
Details
09-20-2011
1.00
Install Flap Motor
Details
09-20-2011
0.50
Drill Flap Motor Acutator for Safety Wire
Details
09-19-2011
2.50
Install RH Torque Tube bearing
Details
09-17-2011
4.00
Align and Match Drill LH /RH Flap Torque Tubes
Details
08-05-2011
3.00
Install Control Stciks and Pushrods
Details
08-04-2011
2.50
Match Drill Stcks and Control Columns
Details
08-04-2011
2.00
Assemble Elevator Idler Arm
Details
08-04-2011
1.50
Assemble Aileron Pushrods
Details
08-03-2011
2.50
Fabricate the F1090 Mid Elevator Pushrod
Details
08-03-2011
3.00
Fabricate F-1089 Elevator Pushrod
Details
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
351
1473
Avionics
24
90
Control System
18
42
Electrical System
26
94
Empennage
95
425
Engine
1
5
Engine Controls
1
4
Fuselage
143
572
Miscellaneous
3
10
Painting
3
100
Panel
17
54
Shop Supplies
1
2
Undercarriage
3
15
Weight and Balance
1
6
Wings
15
54
Copyright © 2001-2024 Matronics. All Rights Reserved.