KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
Work Logs Found: 136
Category Work Time: 329 Hours
 Date
Hours
Work Log Summary

Details

 10-18-2014
4.00
Fwd baggage door aft latch block and door strut in
Details
       

 10-17-2014
5.00
FWD baggage door rebuild final and Lock latch bloc
Details
       

 10-12-2014
0.75
Front baggage door rebuild- the inner skin
Details
       

 10-06-2014
1.50
Finish baggage door outer skin rivits and install
Details
       

 10-05-2014
1.50
Baggage door rebuild-2
Details
     

 10-03-2014
3.00
Fwd baggage door rebuild-1
Details
       

 09-07-2014
1.00
Rt side wing root cover gap seal install
Details

 09-06-2014
1.25
Gear leg mounting covers cut for clearence and ins
Details
       

 08-08-2014
0.25
Secured the belly skin to the bottom wing
Details
     

 06-30-2014
1.50
Clean and polish canopy center slide rail
Details

 06-22-2014
1.00
add switch gaurd to stallwarner switch
Details
     

 05-14-2014
2.50
Glare shield-1
Details
       

 05-11-2014
1.75
Upper fwd skin final riviting
Details
     

 05-10-2014
3.50
Fwd upper skin riviting-4. The cherry max rivits i
Details
       

 05-07-2014
3.50
fwd top skin-3 riviting the firewall flange
Details
       

 05-06-2014
3.75
Riviting the fwd top skin-2
Details
       

 05-05-2014
5.00
Rivit fwd top skin-1
Details
       

 05-02-2014
2.00
Front baggage area
Details
     

 12-26-2013
1.50
Drill fwd baggage door hinge
Details
       

 12-14-2013
1.00
Fwd upper skin side support brackets
Details
       

 12-13-2013
2.00
adjust fit of fwd upper skin and firewall hinge
Details

 11-09-2013
1.00
Cabin heat box control final
Details
       

 11-05-2013
2.00
Cabin heat cable install-1
Details
       

 11-04-2013
1.25
New fuel line from electric pump to gascolator
Details
     

 11-03-2013
2.00
Re position pitot tube penetration and misc.
Details
       

 10-19-2013
1.50
Final rivits in the center bulkhead caps
Details
     

 10-13-2013
0.75
Rivit fwd baggage door hinge brace and engine moun
Details
     

 10-08-2013
1.50
rivit center bulk head covers-1 and prep gear atta
Details
       

 10-08-2013
0.50
File interfearing rivit down on left outboard wear
Details
       

 10-07-2013
1.50
Center bulk head covers
Details
       

 10-03-2013
1.00
Fuel selector position plate installed
Details
       

 09-19-2013
2.00
Final rivits in aft baggage floor. Rivit in floors
Details
       

 09-19-2013
1.50
Adjust and reinstall flap actuator weldment
Details
       

 09-10-2013
1.00
rivit the panel skirts to fuselage
Details

 09-10-2013
0.50
Rivit the aft baggage floor-1
Details
     

 09-09-2013
2.00
Rivit on final stiffners to floors and install in
Details
       

 09-09-2013
2.00
baggage floor and flap actuator reinstall
Details
       

 08-27-2013
0.50
Rivtited the right side flap fairing
Details
       

 08-22-2013
2.00
Install the left and right flap fairing up stops.
Details
     

 06-12-2013
1.00
Drill wire thru holes in floor and temp install fl
Details
       

 03-12-2013
1.25
redo left side baggage tie down ring storage
       

 03-11-2013
1.50
wire up the roll and ptch autopilot servos with st
       

 03-11-2013
0.50
Finished wire connector at rear stick. Installed c
Details
       

 03-11-2013
0.75
connectorize the flap motor
     

 03-09-2013
1.50
finish installing leftside cabin light and switch-
       

 03-07-2013
1.50
Left side cockpit light -1
       

 02-09-2013
0.25
attach the flanged duct to the fuselage
Details
     

 12-10-2012
0.50
Fresh air duct mod-1-rear seat
Details
     

 10-17-2012
0.75
12 v aux pwr for back seat install
Details
       

 09-27-2012
1.00
Installed screws and nuts in the Gear tower weldme
Details
       

 09-23-2012
1.00
machine screws to right side gear tower area
Details
       

 09-22-2012
0.75
Machine screws fastened and torqued above landing
Details
       

 09-16-2012
1.50
Control stick grips
Details
       

 09-10-2012
0.00
pilot control stick length cut and fit and wire ex
Details
       

 09-10-2012
2.25
front contol stick grip and throttle plate assembl
Details
       

 08-28-2012
0.75
Throttle quadrant refitting and manipulation
Details
       

 08-14-2012
0.50
Swap a two lever for 3 lever throttle quadrant
Details
       

 06-03-2012
1.25
Set 4 rivits forgotten during build on bottom skin
Details
       

 05-20-2012
2.50
Parking brake-2
Details
       

 05-18-2012
1.50
PARKING BRAKE-1
Details
       

 05-18-2012
1.50
Flap motor wire pprotection mod
Details
       

 05-14-2012
1.75
transponder antenna doubler and antenna install
Details
       

 05-13-2012
1.25
Radio comm antenna
Details
       

 05-08-2012
1.00
Panel access door-6
Details
       

 05-07-2012
6.00
panel access door-5
Details
       

 05-04-2012
2.50
ELT antenna and coax mounting
Details
       

 05-04-2012
3.00
Access door to intrument panel- 4
Details
       

 05-02-2012
5.00
Instrument panel access door-3 and more fiberglass
Details
       

 04-23-2012
1.50
Panel acces door -1
Details
       

 04-23-2012
1.75
ELT mount -final
Details
       

 04-22-2012
4.00
ELT mounting 2, Rivit aft skin, Finish access plat
Details
       

 04-21-2012
5.00
ELT mounting
Details
       

 04-09-2012
3.50
Fuel line redo
Details
       

 03-13-2012
1.75
Fuel vent line bend and cut. Cut and flare main fu
Details
       

 02-28-2012
5.50
Center section bolts, Left flap trim, fairings dim
Details
       

 01-17-2012
1.00
Rivit left fuse skin to upper longeron from rear s
Details
       

 01-16-2012
2.50
Rivittin the fuselage skins along top longeron
Details
       

 01-16-2012
0.75
Rear throttle linkage clearence
Details

 12-11-2011
1.50
wind screen bar streched and wire run in conduit
Details
       

 12-10-2011
4.50
Conduit for tail light and trim servo, pitch autop
Details
       

 12-04-2011
1.25
tail light/strob wire routing
Details
       

 11-25-2011
2.50
Front and rear throttles
Details
       

 11-25-2011
1.00
Baggage door lock install
Details
       

 11-18-2011
4.00
Pilot throttle quadrant mod and tank bracket-2
Details
       

 11-12-2011
0.50
front throttle spacers and windscreen suport
Details

 11-10-2011
2.50
Rear seat throttle 3
Details
       

 11-08-2011
4.75
Rear seat throttle mounting-2
Details
       

 11-06-2011
3.50
Rear seat throttle-1 Rear seat shoulder harn
Details
       

 11-04-2011
2.00
Rudder cable fuselage covers
Details
       

 11-02-2011
4.00
Finish riviting on the turtle deck and rework some
Details
       

 10-27-2011
2.50
Rivit on the turtle deck-1
Details
       

 10-24-2011
3.75
Left and Right brake Lines installed in gear tower
Details
       

 10-19-2011
1.25
Air vent, misc
Details
       

 10-16-2011
2.25
Static line install and flap motor.
Details
       

 10-15-2011
3.25
Baggage door-5, aft upper bulkheads
Details
       

 10-13-2011
0.50
Fuse Panel and misc.
Details
       

 10-10-2011
5.50
Aileron electric trim install
Details
       

 10-07-2011
3.00
baggage door-4
Details
       

 10-06-2011
3.00
Fuel lines-final and baggage door-3
Details
       

 10-05-2011
4.50
Fuel line- valve to rt tank, Redo valve to filter
Details
       

 10-04-2011
5.00
Dimple fwd skin and work on baggage door
Details
       

 10-03-2011
1.25
instrument sub panels fitted to fuselage
Details
       

 10-03-2011
5.00
Forward upper fuselage skin
Details
       

 10-02-2011
5.00
Roll autopilot servo install- 2 and intrument pane
Details
       

 10-01-2011
2.00
Trutrac roll sevo/ Instument panel-1
Details
       

 10-01-2011
1.50
Trutrac pitch servo final
Details
       

 09-29-2011
2.75
Left tank fuel line and fuel pump to firewall line
Details
       

 09-28-2011
5.00
Fuel lines
Details
       

 09-26-2011
4.50
Fuel vent lines, Fit the pitch servo, Fuel pump an
Details
       

 09-24-2011
0.25
Fuel filter bracket
Details
       

 09-23-2011
2.00
Dimple Aft upper skin-final
Details
       

 09-21-2011
4.00
Final drill aft upper skin and bulkheads. Start di
Details
       

 09-18-2011
5.50
Upper bulk heads and aft upper skin
Details
       

 09-17-2011
4.25
Aft upper bulkheads-1 and odds and ends
Details
       

 09-15-2011
3.00
Put in temporary plywood floor in tail cone
Details
       

 09-12-2011
1.50
Fuel system -1
Details
       

 09-12-2011
2.75
Front and rear seat rudder pedal install-final
Details
       

 09-11-2011
6.00
Front and rear rudder pedals day 3
Details
       

 09-10-2011
6.00
Rudder and brake pedals 2
Details
       

 09-09-2011
6.00
Ruder pedals
Details
       

 09-08-2011
8.50
Bellcrank, pushtube, rudder install and stops
Details
       

 09-07-2011
5.00
Control column, push tube, control sticks
Details
       

 08-30-2011
3.75
VS squared verticaly and centerd longitudinaly. Dr
Details
       

 08-30-2011
3.00
VS lower 3 bolts holes drilled and install
Details
       

 08-30-2011
1.00
Install elevators to HS
Details
       

 08-29-2011
3.00
Push tubes fabrication- elevator
Details
       

 08-29-2011
1.50
elevator bellcrank
Details
       

 08-24-2011
3.00
Vertical stab attach to fuse and HS 1
Details
       

 08-24-2011
4.00
Final drilling Horizontal stab to fuselage
Details
       

 08-22-2011
0.00
Tap the throttle cable anchor and primer
Details
       

 08-22-2011
3.50
Mounting Horizontal stabilizer to fuselage 1
Details
       

 08-21-2011
2.50
Throttle cable anchor fabrication
Details
       

 08-21-2011
4.00
Seat ramp and bulkhead cap
Details
       

 08-20-2011
4.00
Flap blocks, rear seat belt anchors, nut plates
Details
       

 08-13-2011
3.75
Floor boards, baggage floor and baggage shelf
Details
       

 07-17-2011
0.50
Rotisserie
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.