Powered By Kitlog Pro v2.0
JOE'S WEB SITE
Zodiac 601 XLB
Upgrade
Work Logs Found:
14
Category Work Time:
43 Hours
Date
Hours
Work Log Summary
Details
02-25-2013
2.00
Add L to outside of trim servo
Details
09-20-2011
3.00
Mounted Aileron with balance weigths and stops.
Details
08-29-2011
5.00
Found some AN3-12a bolts and finished aileron upgr
Details
08-26-2011
2.00
Aileron work on hold for screws on back order.
Details
08-24-2011
2.00
Aileron Upgrade
08-23-2011
3.00
Aileron Upgrade
08-21-2011
2.00
Riveted Upgrade Ls to bottom skin
Details
08-20-2011
3.00
Remove top skin and rivet upgrade parts to wing.
08-17-2011
3.00
Put on top skin to drill holes in added Ls.
Details
08-16-2011
4.00
Replaced old Bellcrank Support Channel with L angl
08-15-2011
3.00
L Angle installation span wise on both upper and l
Details
08-11-2011
3.00
Rivet the Rear Channel Doubler, Top Rear Spar Angl
Details
08-08-2011
5.00
Wing Rear Channel Work
Details
07-17-2011
3.00
Rear Spar Upgrade
Details
SITE NAVIGATION
Contact Builder
Zodiac 601XLb Tail Dragger Home
Zodiac 601 XLB Home
Category
# Logs
# Hours
All
512
2059
Airframe
9
37
Auto Pilot
8
34
Avionics
25
108
Brakes
8
19
Canopy
51
131
Control System
33
112
Cowl
1
1
Electrical
15
42
Empennage
30
124
Engine
25
76
Entire Plane
1
11
Fuel System
10
37
Fuselage
121
678
FWF
34
96
Landing Gear
8
27
Lights
4
8
Miscellaneous
25
117
Painting
12
23
Paper Work
1
2
Pitot/Static
4
13
Post Const Insp
6
17
Prop
3
12
Propeller
1
3
Shop Supplies
1
40
Spinner
2
4
Tools
2
3
Upgrade
14
43
Wings
54
214
Wire
3
15
Work Bench
1
12
Copyright © 2001-2024 Matronics. All Rights Reserved.