KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
Work Logs Found: 8
Category Work Time: 14 Hours
 Date
Hours
Work Log Summary

Details

 10-01-2012
0.25
Drilled trim servo linkage hole into lower tailcon

 09-29-2012
2.50
Riveted nutplates and cut lower fairing
Details
     

 09-29-2012
1.75
Countersunk tabs
Details
       

 09-28-2012
1.50
Match drilled tabs to fairing
Details
       

 09-27-2012
1.50
Attach fitting of tail fairing to tailcone
Details
       

 08-18-2012
2.50
Sanded and cut tail cone fairings
Details
       

 07-08-2011
3.00
Finished preparing and riveted tips to rudder and
Details
       

 07-07-2011
1.50
Removed material from R-1206 & VS-1213 tips
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.