KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
Work Logs Found: 159
Category Work Time: 354 Hours
 Date
Hours
Work Log Summary

Details

 03-09-2015
2.00
Mounted/tested ELT, sealed fuselage center ribs
Details
       

 02-12-2015
1.00
New fuel line -- right wing to fuel tank valve
Details
       

 01-10-2015
2.00
New fuel valve and lines, part 1
Details
       

 12-31-2014
2.00
Re-plumbing the fuel lines, part 3
Details
       

 12-31-2014
0.50
Re-plumbing the fuel lines, part 2
Details
       

 12-31-2014
2.00
Re-plumbing the fuel lines, part 1
Details
       

 12-31-2014
1.00
Connecting the fuel level electrical leads
Details
       

 12-28-2014
1.00
Tapping the forward access panels' screw holes
Details
       

 12-27-2014
3.00
Riveting the Forward Skin to the airplane, Part 2
Details
       

 12-27-2014
2.00
Riveting the Forward Skin to the airplane, Part 1
Details
       

 12-24-2014
2.00
Forward Access Panels redux
Details
       

 12-24-2014
2.00
Countersinking the Forward Access Panels' screw ho
Details
       

 12-18-2014
3.00
Riveting the access panel doublers to the forward
Details
     

 12-18-2014
2.00
Creating the ProSeal gasket for the access panels
Details
       

 12-15-2014
3.00
Screws & Platenuts for the forward access panels
Details
       

 12-10-2014
3.00
Matchdrilling the doubler and skin (continued)
Details
       

 12-10-2014
2.00
Dimpling the forward skin access panel rivet holes
Details
       

 12-08-2014
1.50
Cutting the access panel holes, part 2
Details
       

 12-08-2014
1.00
Cutting the access panel holes, part 1
Details
       

 12-01-2014
4.00
Removing the top forward fuselage skin
Details
       

 12-01-2014
2.00
Designing the forward access panel templates
Details
       

 12-01-2014
2.00
Cutting and shaping the doublers, part 1
Details
       

 05-10-2014
3.00
Riveting on top front fuselage skin, part 2
Details
       

 05-09-2014
2.00
Riveting on top front fuselage skin, part 1
Details
       

 01-25-2014
2.00
New canopy latch, part 5
Details
       

 01-24-2014
3.00
New canopy latch, part 4
Details
       

 01-24-2014
3.00
New canopy latch, part 3
Details
       

 01-22-2014
2.00
New canopy latch, part 2
Details
       

 01-22-2014
3.00
New canopy latch, part 1
Details
       

 06-23-2013
3.00
Riveting the aft fuselage skins
Details
       

 11-14-2012
3.00
Fabricate/Install fuel tank attach brackets
Details
       

 10-23-2012
2.00
Elevator push tubes and control column part 2
Details
       

 10-14-2012
3.00
Elevator push tubes and control column
Details
       

 09-09-2012
0.50
RV-7 Yoga
Details
       

 06-24-2012
4.00
Riveting Top Fuselage Skin in place
Details
       

 04-07-2012
2.00
Mounting shelf for the Vertical Power Pro unit
Details
     

 03-23-2012
2.00
Building/installing ELT shelf
Details
       

 02-19-2012
2.00
Ran the static plumbing and shoulder harness cable
Details
       

 02-18-2012
1.00
Tested the anti-collision beacon
Details
     

 02-18-2012
3.00
Installed the Static system ports
Details
       

 02-18-2012
3.00
Autopilot pitch channel: Bracket, wiring
Details
       

 02-01-2012
4.00
Fabricating the Skyview ADAHRS shelf
Details
       

 01-28-2012
2.00
Running wires for the fuselage/tail lights, elev t
Details
       

 01-25-2012
2.00
Riveting the anti-collision mount stiffiners to th
Details
       

 01-23-2012
3.00
Beacon fuselage mount stiffiners
Details
       

 01-19-2012
2.00
Side and Rear canopy frame brackets
Details
       

 01-16-2012
2.00
Riveting the forward frame spars
Details
       

 01-16-2012
2.00
Drilling the canopy frame hinge brackets
Details
       

 01-15-2012
4.00
Canopy frame forward skin alignment problems
Details
       

 01-15-2012
2.00
Canopy frame forward bracket
Details
       

 01-14-2012
1.00
Canopy Frame forward skin
Details
       

 01-10-2012
1.00
Canopy Frame Hinge Bracket pins
Details
       

 01-08-2012
1.00
Forward canopy frame, initial skin alignment
Details
       

 01-08-2012
2.00
Cockpit lock handle primed, riveted into place
Details
       

 01-08-2012
2.00
Aft Canopy locking mechanisms, part 1
Details
       

 01-07-2012
2.00
Fabricated and installed canopy lock/release hardw
Details
       

 01-07-2012
2.00
Cutting/drilling canopy lock handle mounts
Details
       

 01-05-2012
2.00
Wire runs for the fuselage
Details
       

 01-05-2012
2.00
Canopy disconnect assembly
Details
       

 01-02-2012
2.00
Testing the canopy hinge bracket release
Details
       

 01-01-2012
2.00
Canopy hinge mounting blocks
Details
       

 12-26-2011
3.00
Main Instrument Panel, air vents
Details
       

 12-25-2011
2.00
Positioning mounting brackets for the sub-panel
Details
       

 12-25-2011
2.00
Match-drilling the skins to the sub-panel ribs and
Details
       

 12-24-2011
3.00
Side sub-panel assembly
Details
       

 12-24-2011
3.00
Fitting the sub-panels to the cockpit area
Details
       

 12-23-2011
2.00
Panel component fabrication, part 3
Details
       

 12-23-2011
3.00
Center Sub-panel assembly, part 2
Details
       

 12-23-2011
2.00
Center Sub-panel assembly, part 1
Details
       

 12-22-2011
2.00
Riveting the stiffiner to the instrument panel
Details
       

 12-22-2011
3.00
Panel component fabrication, part 2
Details
       

 12-20-2011
3.00
Panel component fabrication, part 1
Details
       

 12-19-2011
2.00
Roll Bar top brace/channel
Details
       

 12-19-2011
2.00
Final-drilling the roll bar mounting brackets
Details
       

 12-17-2011
3.00
Finished/primed, assembled/rivited the roll bar
Details
       

 12-17-2011
2.00
Assembling/mounting the roll bar mount brackets
Details
       

 12-11-2011
2.00
Drilling/fitting the roll channel halves' joining
Details
       

 12-11-2011
3.00
Assembling, drilling the roll bar
Details
       

 12-10-2011
3.00
Fabricating the angles
Details
       

 12-04-2011
2.00
Installing the rudder pedal assembly
Details
       

 12-04-2011
1.00
Finished. Also, had help from neighbor's friend
Details
       

 11-28-2011
4.00
Rebuilding and painting the brake pedals
Details
       

 11-26-2011
3.00
Mounting and fitting the rudder
Details
       

 11-25-2011
2.00
Rear tie-down block, vert stabilizer (part 2)
Details
       

 11-25-2011
2.00
Rear tie-down block, vert stabilizer
Details
       

 11-25-2011
1.00
Attaching the elevator horn up block
Details
     

 11-23-2011
2.00
Riveted the front attach plate to the forward spar
Details
       

 11-22-2011
3.00
Fine-tuning the Vertical Stab, and DRILLING THE HO
Details
       

 11-21-2011
2.00
Mounting the vertical stab
Details
       

 11-21-2011
3.00
Assembled and plumbed the fuel pump and filter
Details
       

 11-20-2011
2.00
Installing platenuts for the fuel pump floor mount
Details
       

 11-20-2011
2.00
Final assembly: Fuel Pump cover doghouse
Details
       

 11-19-2011
2.00
Building the fuel pump cover and floor mounts
Details
       

 11-19-2011
1.00
Adjusting the forward elevator stop block
Details
       

 11-15-2011
1.00
Installed the elevator bellcrank, connected aft pu
Details
       

 11-15-2011
2.00
Front elevator push rod
Details
       

 11-15-2011
1.00
Adjusting the aft elevator pushrod
Details
       

 11-14-2011
2.00
Finished the rear elevator push rod
Details
       

 11-13-2011
2.00
Elevator push rod (rear half)
Details
       

 11-09-2011
3.00
Building/installing the parking brake
Details
       

 11-06-2011
2.00
Setting the horizontal Stab's angle of incidence
Details
       

 11-05-2011
2.00
Fabricating shims, mounting/aligning the horiz sta
Details
       

 11-05-2011
2.00
Drilling forward stab, installing shims
Details
       

 11-03-2011
2.00
Match-drilling the elevator horns
Details
       

 10-30-2011
2.00
Mounting the elevator to align the control horns
Details
       

 10-09-2011
4.00
Fuel Vent lines
Details
       

 10-06-2011
4.00
Constructing/mounting cockpit fuel lines
Details
       

 10-02-2011
2.00
Installing brake fluid reservoir and fuel tank sel
Details
       

 10-01-2011
3.00
Drilling gear holes, aligning the weldments
Details
       

 10-01-2011
2.00
Drilling and bolting the weldment side mounts
Details
       

 09-30-2011
3.00
Mounting the flap motor
Details
       

 09-30-2011
2.00
Center Brace, side covers
Details
       

 09-26-2011
3.00
Platenuts on the flap actuator channel
Details
       

 09-26-2011
2.00
Flap Actuator Channel, top mounting plate
Details
       

 09-23-2011
3.00
Fabricating parts for the flap actuator assemblies
Details
       

 09-21-2011
1.00
Seat Back final assembly, finished
Details
       

 09-21-2011
3.00
Mounting the flap actuator assembly to the 705 bul
Details
       

 09-21-2011
1.00
Drilling the flap actuator arm safety wire hole
Details
       

 09-21-2011
3.00
Assembling, riveting the seat back braces
Details
       

 09-20-2011
2.00
Fitting the Cockpit Heater baffle to front cockpit
Details
       

 09-19-2011
2.00
Riveting the heater baffle assembly and platenuts
Details
       

 09-18-2011
3.00
Priming and riveting the seat backs
Details
       

 09-18-2011
3.00
Cockpit heat baffle drilling, assembly
Details
       

 09-10-2011
3.00
Assembling the seat back pieces
Details
       

 09-07-2011
3.00
Seat backs--marking and match-drilling the forward
Details
       

 09-05-2011
1.00
Pop-Riveting the cargo floors and cockpit seat flo
Details
     

 09-05-2011
2.00
Assemble mid-cockpit tunnel cover
Details
       

 09-01-2011
3.00
Seatbelt cable wear plates/blocks for aft cargo wa
Details
       

 08-31-2011
3.00
Installing the Cargo Compartment floors
Details
       

 08-30-2011
2.00
Rivet the aircrew steps to the fuselage sides
Details
       

 08-30-2011
1.00
Anchoring the steps to the fuselage ribs
Details
       

 08-04-2011
3.00
Installing cockpit steps part 1
Details
       

 08-03-2011
1.00
Top Forward Skin GOOF!
Details
       

 08-03-2011
3.00
Fitting the top forward skin
Details
       

 08-03-2011
1.00
Constructing the elevator bellcrank
Details
       

 07-31-2011
3.00
Mid-fuselage bulkhead gusset part 2
Details
       

 07-31-2011
2.00
Mid-fuselage bulkhead gusset part 1
Details
       

 07-30-2011
2.00
Rudder/brake pedals, final assembly
Details
       

 07-30-2011
3.00
Mounting, drilling adjustment holes for the rudder
Details
       

 07-30-2011
2.00
Assembling the rudder/brake pedals
Details
       

 07-24-2011
4.00
Fabricating and prepping the rudder/brake pedals
Details
       

 07-23-2011
2.00
Fabricating the fuselage/fuel tank attachment shim
Details
       

 07-16-2011
2.00
Fuselage Rotisserie--tail support
Details
       

 07-16-2011
3.00
Fuselage Rotisserie
Details
       

 07-16-2011
2.00
Drilling the main landing gear holes
Details
       

 07-16-2011
2.00
Crew step holes
Details
       

 07-10-2011
2.00
modifying the cockpit floor ribs
Details
       

 07-10-2011
2.00
Installing cockpit floor nutplates
Details
       

 07-10-2011
2.00
Firewall-mounted fuel boost pump stiffener
Details
       

 07-10-2011
2.00
Fabricating the rudder stops
Details
       

 07-09-2011
2.00
Fab work on cross-cockpit channel trim, part 4
Details
       

 07-06-2011
2.00
Fab work on cross-cockpit channel trim, part 3
Details
       

 07-06-2011
2.00
Fab work on cross-cockpit channel trim, part 2
Details
       

 07-05-2011
1.00
Fab work on cross-cockpit channel trim
Details
       

 07-04-2011
3.00
Central stick linkage, cockpit floors
Details
       

 07-03-2011
1.00
Snap bushings
Details
       

 07-03-2011
2.00
Prepping the firewall recess
Details
       

 07-03-2011
2.00
Drilling the firewall pass-through holes
Details
       

 07-01-2011
2.00
Hauling in the QB fuselage
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.