LLOYD'S WEB SITE
RV-12
Fuselage
Work Logs Found:
54
Category Work Time:
206 Hours
Date
Hours
Work Log Summary
Details
12-19-2017
2.00
I{nstalled Wheel Pants
Details
07-17-2015
4.00
Completed installing rear window
Details
07-11-2015
2.00
removed rear windoww to fix brocken screw
Details
07-06-2015
5.00
Working on rear window install
Details
07-03-2015
2.00
Riveted Turtle deck skins
Details
06-30-2015
1.20
Started installing the aft turtle deck skins and w
Details
03-28-2015
4.00
Completed fab. and install of Bearing Brkt. Brace
Details
09-22-2014
1.00
Completed ADAHRS stiffner install
Details
09-18-2014
1.00
Installed adahrs stiffner brace in place
Details
09-05-2013
10.00
Install wings connect flaperon lonkage
Details
12-14-2012
8.00
Started installation of Landing gear SB-12-11-09
Details
09-13-2012
2.50
Figured out wimg/fuselage wireing
Details
11-16-2011
4.20
Riveted TAil Cone shear clips to Fuse, Installed c
Details
11-15-2011
2.30
Riveted bottom of Tail cone and Fuselage Joint
Details
11-14-2011
1.50
Joined Tail Cone to Fuselage
Details
11-14-2011
3.50
Joined Tail cone asm to Fuselage
Details
11-14-2011
1.00
Helped position Tail Cone to Fuselage
Details
11-14-2011
1.00
Helped position Tail Cone to Fuselage
Details
11-09-2011
2.00
Reassembling the rudder
Details
11-07-2011
5.50
Finished install of Tail cone. Started Pitot Tube
Details
08-30-2011
3.00
Started on Canopy frame
Details
08-04-2011
4.50
Installed components for Fwd upper fuse and turtle
Details
08-03-2011
4.00
Installed Oilt tank support, Canopy braces and Upp
Details
08-02-2011
5.00
Worked on Panel Base. Installed it.
Details
07-31-2011
3.10
Completed upper Firewall Install.
Details
07-29-2011
4.50
Assembled upper Firewall and Installed it
Details
07-28-2011
5.00
Fabricated and installed fuel lines
Details
07-26-2011
5.50
Installed Rudder pedals, Fuel Pump and shutoff val
Details
07-25-2011
3.00
Assembled Rudder and brake asm.
Details
07-23-2011
7.40
Installed Roll Bar. Installed Baggage Bulkhead. Fa
Details
07-19-2011
4.00
Fabricated Roll Bar, Prepped Baggage Bulkhead
Details
07-18-2011
2.00
Working on Roll Bar Asm
Details
07-15-2011
3.20
Installed Vent Doors and Cowl Hinges
Details
07-14-2011
7.40
Installed Side Skins
Details
07-13-2011
3.00
Fitted longerons, Fitted L.H. Side skin
Details
07-12-2011
4.60
Installed Mid Fuse Brace. Built Mid Fuse Skeleton
Details
07-11-2011
4.00
Formed Longerons
Details
07-09-2011
3.00
Installed Gascolator bracket, Flo scan Mount. Ass
Details
07-08-2011
3.00
Installed Shelf on Lower Firewall
Details
07-06-2011
3.20
Installed Auto Pilot brackets, Started Lower fwd.
Details
06-27-2011
5.20
Installed steps and seat floor
Details
06-25-2011
6.00
attached bottom skin and doublers
Details
06-10-2011
2.50
RIveted Floor supports and Bulkhead
Details
06-01-2011
6.00
Assembling 1203 Bulkhead to Center Section
Details
05-30-2011
2.00
Preparing Control column bulkhead
Details
05-29-2011
1.70
Riveting Fuse Parts together
Details
05-28-2011
5.50
Assembled Seat Floor Asms.
Details
05-27-2011
3.80
Assembled Seat Ribs, Flaperon mixer and Pulley Bra
Details
05-25-2011
5.00
Assembling Seat ribs and control parts
Details
05-24-2011
4.00
Assembling Baggage floor
Details
05-19-2011
6.00
Assembling Cargo floor
Details
05-16-2011
6.00
Fabricated Center Section Bulkhead
Details
05-15-2011
2.00
Completed parts inventory
Details
05-14-2011
4.00
Unpack Crate and Inventory
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
471
1538
Avionics
37
112
Empennage
37
116
Engine
54
168
Finish Kit
90
340
Fuselage
54
206
Miscellaneous
139
406
None
1
2
Shop Prep
9
22
Wings
50
166